Loading...
2935 Street Improvements Front StreetAn Ordinance specifying and selecting the paving material to'be used and letting a contract for the curbing, guttering, ex- cavating, grading and paving of Front Street in the City of Salina Kansas from the north line o? M,greet to the south line of Pine Street in said City. BE IT OREDAIITED by the Board of commissioners of the City of Salina, Kansas: Section 1. That it is hereby determined that Front Street in the City of Salina, Kansas from the north line of Elm Street to the south line of Pine Street in said City shall be paved with one course vitrified vertical fiber plain wire cut brick, not less than three (3) inches deep, with asphalt filler laid on a foundation of five (5) inches in depth of Portland Cement Concrete base with one (1) inch sand cushion, such pavement within the limits above defined to be twenty-two (22) feet in width excluding curb and gutter. Section 2. That it is hereby determined that Front Street in the City of Salina, Kansas from the north line of Elm Street to the south line of Pine Street in said City shall be curbed and guttered with one piece combination cement curb and gutter, said combined curb and gutter shall be comprised fo a curb'six (6) inches thick at the top and six and one-half (612) inches thick at the throat, with gutter twenty-four (24) inches wide, six (6) inches thick at the throat and seven (7) inches thick next to the pavement. Section 3. All excavating, filling and rolling necessary for the proper construction of such improvements shall be done and all of such improvements shall be made and done in strict conformity to and in compliance with the plans and specifications heretofore made by the City Engineer of 0alina:, Kansas and now on file with the City Clerk of said City, which plans and specifications are hereby incor- porated in and made a part hereof in all respects as fully and com- pletely as though written out at length herein- which said plans and specifications are hereby adopted as and for the plans and specifi- cations of such work and improvements. Section 4. That a contract is hereby awarded to C. P. Barring- ton for the paving, curbing, guttering, excavating and filling the above mentioned street in the limits aforesaid -with the materials hereinbefore specified, for the paving a ctually laid and put in place, -for the labor actually performed and the materials actually furnished at the following prices: For excavating and grading One and iso/100 ($1.00) Dollars per cubic yard; for Portland Cement Concrete combined curb and gutter Ninety cents (903 ) per lineal foot, and for paving actually laid and put in place Tree and 23%104 [,i 1 LJ Dollars ($3.23) per square yard. All of said work shall, be paid fcr according to the measurement grade by the City Engineer of the City of Salina. It is hereby determined and found that the prices to be paid for the imporvements as aforesaid is less than the estimated prices of each and all of said improvements as now on file with the City Clerk of the City of Salina, Kansas. Section 5. Such contract is awarded upon the express conditim that such work and improvements shall be done in strict accordance with and in compliance with the plans and specifications of the City Engineer therefor, which plans and specifications are hereby made a part of this ordinance and of the contract awarded, and upon further conditions among others that the person to whom said contrt is awarded shall furnish to the City of Salina a surety company bond in the approximate sw� of the cost of such improvements guar- anteeing the prompt, proper and workmanlike construction of all the same together with a surery company bond guaranteeing such pavement against all defects in material and worlmanship for a period of five (5) years from. the date of its completion and acceptance by said City;and said contract is awarded upon a further condition that said C. P. Barrington shall furnish the City of Salina a good and sufficient surety company bond guaranteeing said curb and gut- ter against all defects in material and workmanship for a period of two (2) years from the date of its completion and acceptance of such work by the City; together with a good and sufficient surety compaW bond running to the State of Kanszs in an amount approxinitely equal to the contract price of said improvements and conditioned that said C. P. Barrington shall pay all indebetdness for labor and ma - aerial furnished in ;making the improvements provided for herein, Section 6, The Board of Commissioners of the City of Salina are hereby authorized to make and enter into on behalf of said City all written agreements necessary in order to secure the construction of the improvements herein provided for, Section 7. This ordinance shall take effect and be in full force from and after its publication once in the official City paper, Introduced for first reading, February 12th, 1924, Passed and approved ---------- February 18th, 1924. J. S. .rget_t, (SEAL) j Mayor Attest: Chas. E. Banker, City Ulerk. 526 STATE OF KANSAS ) ) SS. COUNTY OF SALINE ) I, Chas. E. Banker, City Clerk of the City of Salina, Kansas, do hereby certify that the above and foregoing is a true and correct copy of Ordinance Number 2933 passed and approved by the Board of Commissioners of the City of Salina, Kansas, February 18th, 1924; and a record of the vote on its final adaption is found on page � A r of Journal Number 10. Said ordinance was published in the Salina Daily Union February 1924. City Clerk. (Published in The Salina Daily Union oti -yN8� 1924) ORDINANCE NO. Z 9 3 An Ordinance specifying and selecting the paving material to'be used and'letting a contract for the curbing, guttering, ex- cavating grading and paving of Front Street in the City of Salina, ex- cavating, from the north line of Elm 6tFeet to the south line of Pine Street in said City. BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas: Section 1. That it is hereby determined that Front Street in the City of Salina, Kansas from the northllinec6f'.:�➢:ti -iSti�eett to the south line of Pine Street in said City shall be paved with one course vitrified vertical fiber plain wire cut brick, not less than three (3) inches deep, with asphalt filler laid on a foundation of five (50 inches in depth of Portland Cement Concrete base with one (1) inch sand cushion, such pavement within the limits above defined to be twenty-two (22) feet in width excluding curb and gutter. Section 2. That it is hereby determined that Front Street in the City of Salina, Kansas from the north line,of Elm Street to the south line of Pine Street in said City shall be curbed and guttered with one piece combination cement curb and gutter, said combined curb and gutter shall be comprised of a curb six (6) inches thick at the top and six and one-half (62) inches thick at the throat', with gutter twenty-four (24) inches vride, six (6) inches thick at the throat and seven (7) inches thick next to the pavement. Section 3. All excavating, filling and rolling necessary for the proper construction of such improvements shall be done and all of such improvements shall be made and done in strict conformity to and in compliance with the plans and specifications heretofore made by the City Engineer of Salina, Kansas and now on file with the City Clerk of said City, which plans and specifications are hereby incor- porated in and made a part hereof in all respects as fully and com- pletely as though written out at length herein; which said plans and specifications are hereby adopted as and for the plans and specifi- cations of such work and improvements. Section 4. That a contract is hereby awarded to C. P. Barring - :son for the paving, curbing, guttering, excavating and filling the above mentioned street in the limits aforesaid with the materials hereinbefore specified, for the paving actually laid and put in place, for the labor actually performed and the materials actually furnished at the following prices: For excavating and grading One and No/100 ($1.00) Dollars per cubic yard; for Portland Cement Concrete combined curb and gutter Ninety cents (90¢) per lineal foot, and for paving actually laid and put in-place Three and 23/100 Dollars (03.23) per square yard. All of said work shall be paid for according to the measurement made by the City Engineer of the City of Salina. It is hereby determined and found that the prices to be paid for the improvements as aforesaid is less than the estimated prices of each anR all of said improvements as now on file with the City Clerk of the City of Salina, Kansas. Section 5. Such contract is awarded upon the express condition that such work and improvements shall be done in strict accordance with and in compliance with the plans and specifications of the City Engineer therefor, which plans and specifications are hereby made a part of this ordinance and of the contract awarded, and upon further conditions among others that the person to whom said contract is awarded shall furnish to the City of Salina a surety company bond in the approximate sum of the cost of such improvements guarqnteeing the prompt, proper and workmanlike construction of all the same together with a surety company bond guaranteeing such pavement against all defects in material and workmanship for a period of five (5) years from the date of its completion and acceptance by said City; and said contract is awarded upon a further condition that said C. P. Barrington shall furnish the City of Salina a good and suffic- ient surety company bond guaranteeing said curb and gutter against all defects in material and workmanship for a period of two (2) years from the date of its completion and acceptance of such work by the City; together with a good and sufficient surety company bond running to the State of Kansas in an amount approximately equal to the contract price of said improvements and conditioned that said C. P. Barrington shall pay all indebtedness for labor and material furnished in making the improvements provided for herein. Section 6. The Board of Commissioners of the City of Salina are hereby authorized to make and enter into on behalf of said City all written agreements necessary in order to secure the con- struction of the improvements herein provided for. Section 7. This ordinance shall take effect and be in full force from and after its publication once in the official City paper. Attest: Introduced for first reading, February 11th, 1924. Passed and approved February 18th, 1924