Loading...
2930 Street Improvements Eleventh StreetORDINANCE NO. 2950 j_n The Salina Evening Journal �1924)� An ordinance specifying and selecting the paving material to'be used and letting a contract for the curbing, guttering, ex- eavgting, grading and paving of Eleventh Street in the City of alinas Kansas from the south lT`n_0o_f7F1_0_r_rTson Avenue to the -north line of Oashington Avenue in said City. BE IT ORDAINED by the Board of Commissioners of the City of Salina.. Kansas: Section 1. That it is hereby determined that Eleventh Street in the City of Salina., Kansas from the south line of 1,.Aorrison "venue to the north line of Washington Avenue in said City shall be paved with one course vitrified vertical fiber plain wire cat brick, not less than three (3) inches deep, with asphalt filler laid on a found- ation of five (5) inches in depth of Fortland vement Concrete base with one (1) inch sand cushions such pavement within the limits above defined to be twenty-six (26) feet in width excluding curb and.gutter. Section 2. mThat it is hereby determined that Eleventh Street in the city of Salina, Kansas from the south line of Morrison Avenue to the north line of Washington Avenue in said City shall be curbed and guttered with one piece combination cement curb and gutter, said combined curb and gutter shall be comprised of a curb six (6) inches thick at the top and six and one-half (61) inches thick at the 2 throat and seven (7) inches thick next to the pavement. Section 3. All excavzting, filling and rolling necessary for the proper construction of such improvements shall be done and all of such Improvements shall be made and done in strict conformity to and in compliance with the plans and specifications heretofore made by the City Engineer of Salina,, Kansas and now on file with the City Clerk of said City, which plans and speficications are hereby incor- porated in and made a part hereof in all respects as fully and com- ii pletely as though written 6ut at length herein; which said plans and specifications are hereby adopted as and for the plans and speci- fications of such work and improvements. Section 4. That a contract is hereby awarded to C. P. Barring- ton for the paving., curbing., guttering, excavating and filling the above mentioned street in the limits aforesaid with the materials hereinbefore specified, for the paving actually laid and put in place, for the labor actually performed and the materials actually furnished at the following prices: i'or excavating and grading one and No/loo Dollars ($1.00) per cubic yard; for Cortland ement Concrete combined curb and gutter Ninety cents (90¢) per lineal foot; for paving actually laid and put in place Three and 1 23/100 Dollars ($3.23) per square yard. All of said work shall be paid for according to the -,T.easurement made by the City Engineer of the City of Salina. It is hereby determined and found that the prices to be paid for the improvements as aforesaid is less than the - prices to be paid for the improvements as aforesaid is Less than the estimated prices of each and all of said improvements as now on file with the City Clerk of the City of Salina, Kansas. Section 5. Such contract is awarded upon the express condition that such work and improvements shall be done in strict accordance with and in compliance with the plans and specifications of the City Engineer therefor, which plans and spefifications are hereby made a part of this ordinance and of the contract awarded., and upon further conditions among others that the person to whom said contract is atn�arded shall furnish to the City of Salina a surety company bond in the approximate sum of the cost of such improve- ments guaranteeing the prompt, proper and worImmnlike construction of all the same together with a surety company bond guaranteeing such pavement against all defects in material and wormanship for a period of five (5) years from the date of its completion and acceptance by said City; and said contract is awarded upon a fur- ther condition that said C. P. Barrington shall furnish. tht Oity of Salina a good and sufficient surety company bond guaranteeing said curb and gutter against all defeats in material andworkman- ship for a period of two (2) years from, the date of its completion and acceptance of such worg by the City; together with a good and sufficient surety company bund running to the State of Kansan'in an amount approximately equal to the contract price of said im- provements and conditioned that said C. P. Barrington shall pay all indebtedness for Labor and material furnish in making the imp- provem.ents <provided for herein. Section 6. The Board of Commissioners of the City of Salina, are hereby authorized to rake and enter into on behalf of said City all written agreements necessary in order to secure the construction of the improvements hterin provided for. Section 7. This ordinance shall take effect and be in full farce from and after its publication once in the official City paper, Introduced for first reading, February llth, 1924. Passed and approved --------- February 18th, 1924, J. S. Hal'gett (SEAL) Mayor Attest; Chas. E. Banker, City Clerk. F� I STATE OF KANSAS ) SS. COUNTY OF SALINE ) I.q Chas. E. Banker, City Clerk of the City of Salina, Kansas, do hereby certify that the above and foregoing is a true and correct copy of Ordinance Number 2930 passed and approved by the Board of Comissioners., February 18th, 1924; and a record of the vote on its final adoption is found on -Page bllof Journal Number 10. Said ordinance was published in the Salina Evening Journal February 23rd, 1924. City Ulerk. 0 (Published in The Salina Evening Journal, 2 3� A�� 1924) ORDINANCE N0. 2930 An Ordinance specifying and selecting the paving material to -be used and letting a contract for the curbing., guttering, ex- cavating,,grading and paving of Eleventh Street in the City of Salina, Kansas from the south line of orrison Avenue to the north line of Oashington Avenue in said City. BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas: Section 1, That it is hereby determined that Eleventh Street in the City of Salina, Kansas from the south line of Morrison Avenue to the north line of Washington Avenue insaid City shall be paved with one course vitrified vertical fiber plain wire out brick, not less than three (3) inches deep, with asphalt filler laid on a founda- tion of five (5) inches in depth of Portland Cement Concrete base with one (1) inch sand cushion, such pavement within the limits above defined to be twenty-six (26) feet in width excluding curb and gutter. Section 2. That it is hereby determined that Eleventh Street in the City of Salina, Kansas from the south line of Morrison Avenue to the north line of Washington Avenue in said City shall be curbed and guttered with one piece combination cement curb and gutter, said combined curb and gutter shall be comprised of a curb six (6) inches thick at the top and six and one-half (61fl inches thick at the throat and seven (7) inches thick next to the pavement. Section 3. All excavating, filling and rolling necessary for the proper construction of such improvements shall be done and all of such improvements shall be made and done in strict conformity to and in compliance with the plans and specifications heretofore made by the City Engineer of Salina, Kansas and now on file with the City Clerk of said City, which plans.and specifications are hereby incor- porated in and made a part hereof in all respects as fully and com- pletely as though written out at length herein; which said plansland specififations are hereby adopted as and for the plans and specifi- cations of such work and improvements:, P, W) Section 4. That a contract is hereby awarded to C. P. Barring- ton for the paving, curbing, guttering, excavating and filling the above mentioned street in the limits aforesaid with the materials hereinbefore specified, for the paving actually laid and put in place, for the labor actually performed and the materials actually furnished at the following prices: For excavating and grading One and No/100 ($1.00) per cubic yard; For Partland Cement Concrete combined curb and gutter Ninety cents (90�) p r lineal foot; for paving actually laid and put in place Three and 23/100 Dollars ($3.23) Dollars per square yard, ;x All of said work shall be paid for accord- ing to the measurement made by the City Engineer of the City of Salina. It is hereby determined and found that the prices to be paid for the improvements as aforesaid is less than the estimated prices of each and all of said improvements as now on file with the City Clerk of the City of Salina, Kansas. Section 5, Such contract is awarded upon the express condition that such work and improvements shall be done in strict accordance with and in compliance with the plans and specifications of the City Engineer therefor, which plans and specifications are hereby made a part of this ordinance and of the contract awarded, and upon further conditions among others that the person to whom said contract is awarded shall furnish to the City of Salina a surety company bond in the approximate sum of the cost of such improvements guaranteeing the prompt, proper and workmanlike construction of all the same together with a surety company bond guaranteeing such pavement against all defects in material and workmanship for a period of five (5) years from the date of its completion and acceptance by said City; and said contract is awarded upon a further condition that said C. P. Barrington shall furnish the City of Salina a good and sufficient surety company bond guaranteeing said curb and gutter against all defects in material and workmanship for a period of two (2) years from the date of its completion and acceptance of such work by the E City; together with a good and sufficient surety compahy bond running to the State of Kansas in an amount approximately equal to the contract price of said improvements and conditioned that said C. P. Barrington shall pay all indebtedness for labor and material furnished in making the improvements provided for herein. Section 6. The Board of Commissioners of the City of Salina, are hereby authorized to make and enter into on behalf of said City all written agreements necessary in order to secure the con- struction of the improvements herein provided for. Section 7. This ordinance shall take effect and be in full force from and after its publication once in the official City paper. Introduced for first reading, .Feb. 11th, 1924 Passed and approved -------- Feb. 18th, 1924 Attest:' M