3366 Street Improvements on Crawford AvenueORDINANCE NO. 3366
(published in the Salina Journal �/),j
1927)
D
per sq, yd., and with excavation including all free haul, filling,
rolling, tamping, fine grading, raising and lowering manholes,
etc., as per specifications, at the contract price of 80 cents
per cu. yd.; and which work shall further include all double gutter,
wooden headers, straight curb, manholes, inlets, inlet connections
and other work necessarily incidental to the construction of said
work at and for the unit prices contained in the proposal of L. W.
Rexroad and in said contract, which proposal and contract are hereby
made a part of this ordinance by reference as fully as if set forth
herein.
Section 2, 1hat all excavating and filling and all of the
labor performed and all material furnished for such work shall be
in strict conformity to and in compliance with the plans and speci-
fications of the City Engineer, above referred to and which are here-
by incorporated into and made a part hereof as fully as though
written out at length herein.
AN ORDINANCE ratifying and confirming a'contract for the curbing,
guttering, excavating, grading and paving of Crawford Avenue
from the east line of Tenth Street to the easE line or tae
Missouri
M ssouri Pacific Railroad right-of-way in the City of Salina.
BE IT ORDAINED by the board of Commissioners of the City of Salina.,
Kansas:
Section 1. 'That the contract entered into between the City
of Salina and L. W. Rexroad on April 18th, 1927, and executed by
the Mayor on behalf of the Board of Commissioners of said city on
said date, for the curbing, guttering, excavating, grading and
paving Of Crawford Avenue from the east line of Tenth Street to
the east line of the Missouri Pacific Railroad right-dE-way in
said city, in accordance with the proposal of said L. W. Rexroad
filed in the office of City Clerk and submitted to the Board of
Commissioners on April 111th,, 1927, be and the same is hereby rati-
fied and confirmed and that said Crawford Avenue be so improved
within said lirpits, as provided for in said contract, in accordance
with the plans and specifications therefor prepared by the City
Engineer and now on file in the office of the City Clerk, which
plans and specifications have been heretofore and are now hereby
approved by the Board of Commissioners with 6 inch combined curb
and gutter 24 inches wide exclusive of width of curb, at the con-
tract price of .90 cents per lin. ft., and with 7 inch reinforced
concrete paving 30 feet in width, at the contract price of $2.69
D
per sq, yd., and with excavation including all free haul, filling,
rolling, tamping, fine grading, raising and lowering manholes,
etc., as per specifications, at the contract price of 80 cents
per cu. yd.; and which work shall further include all double gutter,
wooden headers, straight curb, manholes, inlets, inlet connections
and other work necessarily incidental to the construction of said
work at and for the unit prices contained in the proposal of L. W.
Rexroad and in said contract, which proposal and contract are hereby
made a part of this ordinance by reference as fully as if set forth
herein.
Section 2, 1hat all excavating and filling and all of the
labor performed and all material furnished for such work shall be
in strict conformity to and in compliance with the plans and speci-
fications of the City Engineer, above referred to and which are here-
by incorporated into and made a part hereof as fully as though
written out at length herein.
j Section 3. That the performance, statutory and maintenance
bonds furnished by said contractor pursuant to the provisions of said
contract, dated April 19th, 1927 and executed by the Southern Surety
Company as surety be and the same are hereby approved.
Section 4. That this ordinance shall take effect and be in
full force from and after its publication in the official city paper.
Introduced April 25th, 1927
Passed May 2nd, 1927
Guy i. Helvering
Mayor
Attest:
Chas. E. Banker
City Clerk
STATE OF KANSAS
SS
COUNTY OF SALINE
Is Chas. E. Bankers City Clerk of the City Of Salinas Kansas,
do hereby certify that the above and foregoing is a true and correct
copy of Ordinance No. 3366 passed and approved by the Board of
Commissioners of the City Of Salina May 2nd, 1927 and a record of the
vote on its final adoption is found on paged o6 journal No. 11.
City Clerk
Ordinance Number 3367 Page 90
A
(Published in the Salina Journal )�_7 1927)
ORDINANCE N0. 3366
AN ORDINANCE ratifying and confirming a contract for the curbing
guttering, excavating, grading and paving of Crawford A e�nue�
from the east line of Tenth S eet to the east line of the
Missouri Pacific Railroad righof-way in the City of Salina.
BE IT ORDAINED by the Board of Commissioners of the City of Salina,
Kansas;
Section 1. That the contract entered into between the
City of Salina and L. W. Rexroad on April 18th, 1927, and executed
by the Mayor on behalf of the Board of Commissioners of said city
on said date, for the curbing, guttering, excavating, grading and
paving of Crawford Avenue from the east line of Tenth Street to
the east line of the Missouri Pacific Railroad right-of-way in
said city, in accordance with the proposal of said L. W. Rexroad
filed in the office of City Clerk and submitted to the Board of
Commissioners on April 18th, 1927, be and the same is hereby
ratified and confirmed and that said Crawford Avenue be so im-
proved within said limits, as provided for in said contract, in
accordance with the plans and specifications therefor prepared
by the City Engineer and now on file in the office of the City
Clerk, which plans and specifications have been heretofore and
are now hereby approved by the Board of Commissioners with 6 inch
combined curb and gutter 24 inches wide exclusive of width of
curb, at the contract price of ;.90 cents per lin. ft., and with
7 inch reinforced concrete paving 30nfeet in width, at the con-
tract price of $2.69 per sq. yd., and with excavation including
all free haul, filling, rolling, tamping, fine grading, raising
and lowering manholes, eta., as per specifications, at the con-
tract price of 80 cents per cu, yd.; and which work shall further
include all double gutter, wooden headers, straight curb, manholes,
inlets, inlet connections and other work necessarily incidental
to the construction of said work at and for the unit prices con-
tained in the proposal of L. Vi, Rexroad and in said dontraoto
which proposal and contract are hereby made a part of this
ordinance by referenoe as fully as if set forth herein.
Section 2. That all excavating and filling and all of the
labor performed and all material furnished for.suoh work shall be
In strict conformity to and in compliance with the plans and
specifications of the City Engineer, above referred to and which
are hereby incorporated into and made a pabt hereof as fully as
though wrftten out at length herein.
Section 3. That the performance, statutory and maintenance
bonds furnished by said contractor pursuant to the provisions of
said contract; dated April 19th; 1927 and executed by the Southern.
Surety Company as surety be and the same ATshereby approved.
Section 4. That this ordinance shall take effect and be in
full force from and after its publication in the official city
paper.
Introduced April 25th 1927
Passed ..... "hay'. 2nd 1927
1
v'vr�r
Attest: yor
city Clerk
A
9
Published in the Salina Journal
ORDINANCE NO.
1928)
AN ORDINANCE ratifying and confirming a contract for the excava-
ting, grading and paving of North Street from the east line
of Twelfth Street to the city limits to the intersection of
North Street with the Union Pacific Railroad right-of-way,
being the west line of Whittredge Street.
BE IT ORDAINED by the Board of Commissioners of the City of Salina,
Kansas:
Section 1. That the contract entered into between the
City of Salina and
hereinas
referred to as thel&ntractor+on June 1928 and executed
by the Mayor on behalf of the.Board of Commissioners of said
city on said date for the excavating, grading and paving of North
Street in the City of Salina from the east line of Twelfth Street
to the city limits at the intersection of North Street with the
Union Pacific Railroad right-of-way, being the west line of
Whittredge Street, as authorized and provided for by Ordinance
No. 3531 of said city, in accordance with the proposal of said
contractor filed in the office of the City Clerk and submitted
to the Board of Commissioners on June 1928, be and the same
is hereby ratified and confirmed and that said North Street be
so improved within the said limits, as provided for in said con-
tract, in accordance with the plans and specifications therefor
prepared by the City Engineer and now on file in the office of
the City Clerk, which plans and specifications have been heretofore
and are now hereby approved by the Board of Commissioners, with
7,inch Portland Cement Reinforced Concrete Paving, 30 ft. in width,
at the contract price of $_____L; -,per square yard, and with excavation
including all free haul, filling, rolling, tamping, grading, etc.,
as per specifications, at the contract price of cents per cu.
shall
yd., which work ix -further includellall other work necessary
incidental to the construction of said improvements at and for the
unit prices contained in the proposal of said contractor and in said
Published in the Salina Journal 1928)
ORDINANCE NO.
AN ORDINANCE ratifying and confirming a contract for the excava-
ting, grading and paving of North Street from the east line
of Twelfth Street to the city limits to the intersection of
North Street with the Union Pacific Railroad right-of-way,
being the west line of Whittredge Street,
BE IT ORDAINED by the Board of Commissioners of the City of Salina,
Kansas:
Sq'ption 1. That the contract entered into between the
,,City of Salina and hereinas
referred to as the\\contractor on June 1928 and executed
' by the`PSayor onj ehalf of the Board of Commissioners of said
-� ci.ty'ones id date for the excavating, grading and paving of North
Street in the City of Salina from the east lire of Twelfth Street
to the city limits at the intersection of North Street with the
Union Pacific Railroad right-of-way, being the west line of
411hittredge Street, as authorized and provided for by Ordinance
No., 3531 of said city, in accordance with the proposal of said
contractor filed in the office of the City Clerk and submitted
to the Board of Commissioners on June 1928, be and the same
is hereby ratified and confirmed and that said North Stre t be
so itiproved within the said limits, as provided for in said con-
tract, in accordance with the plans and specifications therefor
prepared by the City Engineer and now on file in the office of
the City Clerk, which plans and specifications have been heretofore
and are now hereby approved by the Board of Commissioners, with
7 inch Portland Cement Reinforced Concrete Paving, 30 ft. in width,
at the contract price of $ c per square yard, and with excavation
including all free haul, filling, rolling, tamping, grading, etc.,
as per specifications, at the cor,;,raet price of cents per cu.
shall
yd., which work Jx further include -;all other work necessary and
incidental to the construction of said improvements at and'for the'`'
unit prices contained in the proposal of said contractor and in 'said