Loading...
3312 Waste Water TreatmentAN ORDINANCE providing for the building and construction of a system of disposal works for the purification of the sewage of Salina, Kansas; providing for the awarding of a contract or contracts for such construction; and for the issuance of bonds in pay - ment of the cost and expense thereof. BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas: Section 1. That a system of disposal works for the purification of the sewage of the City of Salina, be and the same is hereby found and declared to be necessary, and that the same, including the necessary pumping station, force main, outfall sewer, sewage treatment plant, diversion manhole and inlet sewer, pumps, screens, piping and valves in pumping station, storage tanks and digestion tanks, with mechanism for same, sludge drying beds, sewers, and including all excavation and embankment, and all other materials, equipment appliances and appurtenance: necessary or required in connection therewith, be built and constructed as hereafter provided for. Section 2. That said system of disposal works shall be built and constructed in accordance with the plans and specifications there- for prepared by Haskins and Crawford, Consulting Civil Engineers of Kansas City, Missouri, who are hereby selected as consulting engineers for the City of Salina for such purpose, which saidl plans and specifi- cations shall be filed in the office of the City Clerk on or before the 6th day of December, 1926, for the approval of the Board of Com- missioners, and on or before said date said engineers shall submit to the Board of Commissioners a detailed estimate, under oath, of the cost Y thereof. That after said plans and specifications and said detailed estimate have been filed as aforesaid, sealed proposals for the buildings and construction of said system of disposal works shall be invited by advertisement, published by the City Clerk in the official city paper, for at least three consecttive days, and at the time fixed in said notice for the receipt of bids, the Board of Commissioners shall let said work by contract either as a whole or separately for the several portions of said work, to the lowest responsible bidder or bidders, if there by any whose bid or bids do not exceed such estimate, pro- vided however that the Board of Commissioners shall reserve the right to reject any and all bids, and provided further that if not responsible bid or bids shall be received within the estimate, the Board of Commissioners shall have power to make such improvements or any part thereof within the estimated cost thereof, and shall have the further power to purchase the necessary tools, apparatus, materials, and employ the .necessary labor, and construct the necessary plant or plants for the purpose of carrying into effect the provisions of this ordinance as provided by law. Section 3. That the main disposal plant of the system here- in provided for shall be constructed on a tract of land, approxi- mately seven acres, more or less, in area, lying in the Southwest Quarter of the North Half of the Northwest Quarter of Section S, Township 14, South, Range 2 West, in Saline County, Kansas; the main pumping plant shall be constructed approximately at or near the present outlet of what is now known as the Ash Street sewer, which empties into the Smoky Hill River at or near the intersection of Ash Street and Riverside Drive; and the force main connecting the disposal plant and the pumping plant shall be constructed approximately along a line commencing at said pumping plant and running thence northwesterly in Riverside Drive to Ohio Street; thence north in Ohio Street to the Missouri Pacific Railroad right-of-way; thence easterly along the Missouri Pacific Railroad right -of way to the site of said main disposal plant. Section 4. That after the contract or contracts for the construction of said system of sewage disposal worky, or hereinabove provided for, shall have been awarded, and the cost and expense of such construction shall have been ascertained, the Board of Com- missioners shall issue improvement bonds of the City of Salina for the purpose of paying the cost and expense thereof, which said bonds shall be issued as provided by law and shall bear interest at not to exceed 44 percent per annum, and shall be issued to mature in installments of approximately equal amounts each year for not to exceed twenty (20) years, and that when issued such bonds .be sold in the manner provided by law or delivered to the contractor or contractors constructing such improvements, in pro- portion to the amounts due such contractor or contractors, in pay- ment of the amount due them or any part of such bonds may be so used at the option of the Board of Commissioners, but such bonds shall not be sold or delivered to any such person for less than the par value thereof nor in a greater sum or amount than the whole amount due to any such persons. Section 5. That the cost and expense of building said system of sewage disposal works shall be born by the City as a whole, and for the purpose of paying the bonds hereinabove provided for, and the in- terest thereon as the same becomes due and payable, the Board of Com- missioners shall levy a general taxon all of the taxable property in the City of Salina in the time and manner provided by law. Section 6. This ordinance shall take effect and be in force from and after its publication in the official city paper. Introduced November 22, 1926. Passed November 23, 1926. Guy T. Helvering Attest: Chas. E. Banker C ityCer STATE OF KANSAS ) ) SS COUNTY OF SALINE ) I, Chas. E. Banker, City Clerk of the City of Salina, Kansas do hereby certify that the above and foregoing is a true and correct copy of Ordinance No. 3312 passed and approved by the Board of Com- missioners of the City of Salina, Kansas November 23, 1926, and a record of the vote on its final adoption is found on page 9 % of Journal No. 11. or M�ffl� L (Published in The Salina Journal -Nu embsrr -11 , 1926) A' ORDINANCE NO. -3'31 I- AN- AN ORDINANCE providing for the building and construction of a system of disposal works for the purification of the sewage of Salina, Kansas; providing for the awarding of a contract or con- tracts for such construction; and for the issuance of bonds in payment of the cost and expense thereof. BE IT ORDAINED by the Board of Commissioners of the City'of Salina, Kansas; Section 1. That a system of disposal works for the purification of the sewage of the City of Salina, be and the same is hereby found and declared to be necessary, and that the same, including the necessary pumping station, force main, outfall sewer, sewage treatment plant, diversion manhole and inlet sewer, pumps, screens, piping and valves in pumping station, storage tanks and digestion tanks, with mechanism for same, sludge drying beds, sewers, and including all excavation and embankment,, and all other materials, equipment appliances and appurtenances necessary or required in connection therewith, be built and constructed as hereafter pro- vided for. Section 2. That said system of disposal works shall be built and constructed in accordance with the plans and specifications therefor prepared by Haskins and Crawford, Consulting Civil Engineers of Kansas City, Missouri, who are hereby selected as consulting engineers for the City of Salina for such purpose, which said plans and specifications shall be filed in the office of the City Clerk on or before the 2'6th day of December, 1926, for the approval of the Board of Commissioners, and on or before said date said engineers shall submitto the Board of Commissioners a detailed estimate, under oath, of the cost thereof. That after said plans and speci- fications and said detailed estimate have been filed as aforesaid, sealed proposals for the building and construction of said system of disposal works shall be invited by advertisement, published by the City Clerk in the official city paper, for at least three consecutive days, and at the time fixed in said notice for the L-1 receipt of bids, the Board of Commissioners shall let said work by contract either as a whole or separately for the several portions of said work, to the lowest responsible bidder or bidders, if there by any whose bid or bids do not exceed such estimate, provided however that the Board of Commissioners shall reserve the right to reject any and all bids, and provided further that if no responsible bid or bids shall be received within the estimate, the Board of Commissioners shall have power to make such improvements or any part thereof within the estimated cost thereof, and shall have the further power to purchase the necessary tools, apparatus, materials, and employ the necessary labor, and construct the necessary plant or plantuj for the purpose of carry- ing into effect the provisions of this ordinance as provided by law. Section 3. i`hat the main disposal plant of the system here- in provided for shall be constructed can a tract of land, approxi- mately seven acres, more or less, in area, lying in the Southwest QVarter of the North Half of the Northwest Quarter of Section 8, Township 14, South, Range 2 West, in Saline County, Kansas; the main pumping plant shall be constructed approximately at or near the present outlet of what is now kno�,Xias the Ash Street sewer, which empties into the Smoky HRill River at or near the inter- section of Ash Street and Riverside Drive; and the force main connecting the disposal plant and the pumping plant shall be con- structed approximately along a line commencing at said pumping plant and running thence northwesterly in Riverside Drive to Ohio Street; thence north in Ohio Street to the Missouri Pacific Railroad right-of-way; thence easterly along the Missouri Pacific Railroad right-of-way to the site of said main disposal plant. Section 4. That after the contract or contracts for the construction of said system of sewage disposal works, as hereinabove provided for, shall have been awarded, and the cost and expense of such construction shall have been ascertained, the board of Commissioners shall issue improvement bonds of the City of Salina for the purpose of paying the cost and expense thereof, which said bonds shall be issued as provided by law and shall bear interest at not to exceed 04percent per annum, and shall be issued to mature in installments of approximately equal amounts each year for not to exceed twenty (20) years, and that when issued such bonds be sold in the manner provided by law or delivered to the contractor or contractors constructing such improvements, in proportion to the amounts due such contractor or contractors, in payment of the amount due them, or any part of such bonds may be so used at the option of the Board of Commissioners, but such bonds shall not be sold or delivered to any such persons for less than the par value thereof nor in a greater sum or amount than the whole amount due to any such persons. Section 5. That the cost and expense of building said system of sewage disposal works shall be borneby the City as a whole, and for the purpose of paying the bonds hereinabove provided for, and the interest thereon as the same becomes due and payable, the Board of Commissioners shall levy a general tax on all of the taxable property in the City of Salina in the time and manner provided by law. Section 6. This ordinance shall take effect and be in force from -and after its publication in the official city paper. Introduced November 22, 1926 Passed November P !� 1: Attest: City -Clerk