ORDINANCE N0. 4583
__Cru_b_ lishedin the _Salina Journal November 13: 1935 )
AN ORDINANCE ratifying and confirming a contract for the building
and construction of a 19000,000 gallon elevated water storage
tank and tower as provided and authorized by Ordirance No. 4538,
BE IT ORDAINED by the Board of Commissioners of the City of Salina,
Kansas
Section 1. That the acceptance by the City of Salina of the
proposal of George T. Horton, Merle J. Trees, and Horace B. Horton,
co-partners, doing business under the firm name of Chicago Bridge
& Iron Works, Chicago, Illinois, hereinafter referred to as the
i
"contractor" as submitted to the Board of Commissioners on October
i
28, 1935, which is hereby found and determined to be the lowest
i
j and best bid for furnishing and erecting a steel elevated water
storage tank and tower with 1,000,000 gallon capacity complete,
elevating the bottom of the tank 110 feet above the supporting
foundations with a maximum water line in tank not to exceed 35 feet
above the bottom of the tank and furnish anchor bolts to be placed
in the foundations to be constructed for said tank and tower under
the provisions of Section 2 of the attached proposal, said tank
to be of a design substantially in accordance with the design
shown on the blue print furnished by said contractor, a copy of
which is attached to and made a part of the contract herein after
I
referred to and which is by reference made a part hereof, all as
described in Section 1 of said proposal and all as provided for
and authorized by Ordinance No. 4538 of the City of Salina, Kansas,
and the contract awarded by the Board of Commissioners of the City
of Salina to said contractor and signed on behalf of the City of
Salina by its Mayor on October 28, 1935, as authorized by the
Board of Commiss=ioners on said date at and for the price of
$62,590.00, which proposal and contract are hereby referred to
and made parts of this ordinance be and the same are hereby
ratified and confirmed, said proposal being with the estimated
cost of said improvements as shown by the sworn estimate of the
City Engineer filed in the office of the City Clerk, which estimate
of cost is hereby referred to and made a part of this ordinance.
Section 2. That said 1,000,000 gallon elevated water storage
tank and tower shall be built and constructed in accordance with
the plans and specifications therefor prepared by the City Engineer
and on file in the office of the City Clerk and in accordance
with the plans therefor submitted by said contractor, which plans
and specifications are hereby referred to and made parts of this
ordinance and in accordance with the proposal of said contractor
and under the terms of said contract hereinabove referred to, said
M4
work to be done and the material, equipment, appliance and
appurtenances necessary and required in connection therewith
to be performed and furnished in accordance with said plans and
specifications and in accordance with the conditions of the Con-
tract, Maintenance, and Statutory Bonds in the principal sum of
$62,590.00 in which said contractor is principal and United States
Guarantee Company is surety, furnished by said contractor and which
have been heretofore presented to and duly approved by the Board of
Commissioners of said city.
Section 3. This ordinance shall take effect and be in force
from and after its publication in the official city paper.
Attest:
Introduced, November 4, 1935
Passed, November 11, 1935
Chas. B. Banker
City Ulerk
STATE OF KXTSAS
) 38
COUNTY OF SALINE )
F. C. Peters
mayor
I, Chas. E. Banker, City Clerk of the City of Salina, Kansas,
do hereby certify that the above and foregoing is a true and correct
copy of Ordinance No, 4583 passed and approved by the Board of Com-
missioners of the City of Salina November 11, 1935; and a record of
the vote on its final adoption is found on page yam/ Journal No. 13.
y UJ -e r
(Published in the Sal',na Journal November13,1935)
Ordinance No. 4583
AN ORllII3ANCF ratifying and confirming a contract for the building
and constr�;ction of a 1,000,000 gallon elevated water storage
tank and tower as provided and authorized by Ordinance No, 4538,
B2 IT ORDA-F-T'E by the Board of Comissioners of the City of Salina,
Kansas.
Section 1. That the acceptance bt the Ci.tn of Salina of the
proposal. of George T. Horton, Merle J. Trees, and Horace B. Morton,
co-partners, doing business under the firm name of Chicago Bridge
& Iron Works, Chicago, Illinois, hereinafter referred to as the
"contractor" as slzbmitted to the 15oard of Commissioners on October
28, 1935, which is hereby found and determined to be the lowest
and best bid for furnishing and erecting a steel elevated water
storage tank and tower with 1,000,000 gallon capacity complete,
elevating the bottom of the tank 110 feet above the supporting
foundations with a maximum water line in tank not to exceed 35 feet
above the bottom of the tank and furnish anchor bolts to be placed
in the foundations to be constructed fm said tank and tower under
the provisions of Section 2 of the attached proposal, said tank
to be of a design substantially in accordance with the design
shown on the blue print furnished by said contractor, a cony of
which is attached to and made a part of the contract herein after
referred to and which is b, reference made a part hereof, all as
described in Section 1 of said proposal and all as provided for
and authorized by Ordinance No. 4538 of the City of Salina, Ifansas,
and the contract awarded by the Board of Commissioners of the City
of Salina to said contractor and signed on behalf of the City of
Salina by its Mayor on October 28, 1935, as authorized by the
Board of Commissioners on said date at and for the price of
;162,590.00, which proposal and contract are hereby referred to
and made parts of this ordinance be and the same are hereby
ratified and confirmed, said proposal being with the estimated
161
cost of said improvements as shown by the sworn estimate of the
City Engineer filed in the office of the City Clerk, which estimate
of cost !s hereby referred to and made a part of this ordinance.
Section 2, That said 1,0000000 gallon elevated water storage
tank and tower shall be built and constructed in accordance with
the plans and specifications therefor prepared by the City Engineer
and on file in the office of the City "lerk and in accordance
with the plans therefor submitted by said contractor, which plans
and specifications are hereby referred to and made parts of this
ordinance and in accordance with the proposal of said contractor
and under the terms of said contract hereinabove referred to, said
work to be done and the material, eq,11.pment, appliance and
appurtenances necessary and reqixired in connection therewith
to be performed and furnished in accordance with said plans and
specifications and in accordance with the conditions of the Contract,
Maintenance, and Statutory Bonds in the principal sum of $62,590.00
in which said contractor is principal and United States Guarantee
Company is surety, furnished by said contractor and which have
been heretofore presented to and duly approved by the Board of
Commissioners of said city.
Section 3. This ordinance shall take effect and be In force
from and after its publication in the official city paper.
Introduced, November 4, 1935
Passed, November] 1 1935
Attest: M ^Mayor