Loading...
4583101 ORDINANCE N0. 4583 __Cru_b_ lishedin the _Salina Journal November 13: 1935 ) AN ORDINANCE ratifying and confirming a contract for the building and construction of a 19000,000 gallon elevated water storage tank and tower as provided and authorized by Ordirance No. 4538, BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas Section 1. That the acceptance by the City of Salina of the proposal of George T. Horton, Merle J. Trees, and Horace B. Horton, co-partners, doing business under the firm name of Chicago Bridge & Iron Works, Chicago, Illinois, hereinafter referred to as the i "contractor" as submitted to the Board of Commissioners on October i 28, 1935, which is hereby found and determined to be the lowest i j and best bid for furnishing and erecting a steel elevated water storage tank and tower with 1,000,000 gallon capacity complete, elevating the bottom of the tank 110 feet above the supporting foundations with a maximum water line in tank not to exceed 35 feet above the bottom of the tank and furnish anchor bolts to be placed in the foundations to be constructed for said tank and tower under the provisions of Section 2 of the attached proposal, said tank to be of a design substantially in accordance with the design shown on the blue print furnished by said contractor, a copy of which is attached to and made a part of the contract herein after I referred to and which is by reference made a part hereof, all as described in Section 1 of said proposal and all as provided for and authorized by Ordinance No. 4538 of the City of Salina, Kansas, and the contract awarded by the Board of Commissioners of the City of Salina to said contractor and signed on behalf of the City of Salina by its Mayor on October 28, 1935, as authorized by the Board of Commiss=ioners on said date at and for the price of $62,590.00, which proposal and contract are hereby referred to and made parts of this ordinance be and the same are hereby ratified and confirmed, said proposal being with the estimated cost of said improvements as shown by the sworn estimate of the City Engineer filed in the office of the City Clerk, which estimate of cost is hereby referred to and made a part of this ordinance. Section 2. That said 1,000,000 gallon elevated water storage tank and tower shall be built and constructed in accordance with the plans and specifications therefor prepared by the City Engineer and on file in the office of the City Clerk and in accordance with the plans therefor submitted by said contractor, which plans and specifications are hereby referred to and made parts of this ordinance and in accordance with the proposal of said contractor and under the terms of said contract hereinabove referred to, said M4 work to be done and the material, equipment, appliance and appurtenances necessary and required in connection therewith to be performed and furnished in accordance with said plans and specifications and in accordance with the conditions of the Con- tract, Maintenance, and Statutory Bonds in the principal sum of $62,590.00 in which said contractor is principal and United States Guarantee Company is surety, furnished by said contractor and which have been heretofore presented to and duly approved by the Board of Commissioners of said city. Section 3. This ordinance shall take effect and be in force from and after its publication in the official city paper. Attest: Introduced, November 4, 1935 Passed, November 11, 1935 Chas. B. Banker City Ulerk STATE OF KXTSAS ) 38 COUNTY OF SALINE ) F. C. Peters mayor I, Chas. E. Banker, City Clerk of the City of Salina, Kansas, do hereby certify that the above and foregoing is a true and correct copy of Ordinance No, 4583 passed and approved by the Board of Com- missioners of the City of Salina November 11, 1935; and a record of the vote on its final adoption is found on page yam/ Journal No. 13. y UJ -e r (Published in the Sal',na Journal November13,1935) Ordinance No. 4583 AN ORllII3ANCF ratifying and confirming a contract for the building and constr�;ction of a 1,000,000 gallon elevated water storage tank and tower as provided and authorized by Ordinance No, 4538, B2 IT ORDA-F-T'E by the Board of Comissioners of the City of Salina, Kansas. Section 1. That the acceptance bt the Ci.tn of Salina of the proposal. of George T. Horton, Merle J. Trees, and Horace B. Morton, co-partners, doing business under the firm name of Chicago Bridge & Iron Works, Chicago, Illinois, hereinafter referred to as the "contractor" as slzbmitted to the 15oard of Commissioners on October 28, 1935, which is hereby found and determined to be the lowest and best bid for furnishing and erecting a steel elevated water storage tank and tower with 1,000,000 gallon capacity complete, elevating the bottom of the tank 110 feet above the supporting foundations with a maximum water line in tank not to exceed 35 feet above the bottom of the tank and furnish anchor bolts to be placed in the foundations to be constructed fm said tank and tower under the provisions of Section 2 of the attached proposal, said tank to be of a design substantially in accordance with the design shown on the blue print furnished by said contractor, a cony of which is attached to and made a part of the contract herein after referred to and which is b, reference made a part hereof, all as described in Section 1 of said proposal and all as provided for and authorized by Ordinance No. 4538 of the City of Salina, Ifansas, and the contract awarded by the Board of Commissioners of the City of Salina to said contractor and signed on behalf of the City of Salina by its Mayor on October 28, 1935, as authorized by the Board of Commissioners on said date at and for the price of ;162,590.00, which proposal and contract are hereby referred to and made parts of this ordinance be and the same are hereby ratified and confirmed, said proposal being with the estimated 161 cost of said improvements as shown by the sworn estimate of the City Engineer filed in the office of the City Clerk, which estimate of cost !s hereby referred to and made a part of this ordinance. Section 2, That said 1,0000000 gallon elevated water storage tank and tower shall be built and constructed in accordance with the plans and specifications therefor prepared by the City Engineer and on file in the office of the City "lerk and in accordance with the plans therefor submitted by said contractor, which plans and specifications are hereby referred to and made parts of this ordinance and in accordance with the proposal of said contractor and under the terms of said contract hereinabove referred to, said work to be done and the material, eq,11.pment, appliance and appurtenances necessary and reqixired in connection therewith to be performed and furnished in accordance with said plans and specifications and in accordance with the conditions of the Contract, Maintenance, and Statutory Bonds in the principal sum of $62,590.00 in which said contractor is principal and United States Guarantee Company is surety, furnished by said contractor and which have been heretofore presented to and duly approved by the Board of Commissioners of said city. Section 3. This ordinance shall take effect and be In force from and after its publication in the official city paper. Introduced, November 4, 1935 Passed, November] 1 1935 Attest: M ^Mayor