Loading...
5195 Confirm Storm Sewer ImprovementsORDINANCE N0. 5195 (First published in the Salina Journal /� ,� 1946) All ORDINANCE ratifying and confirming a contract with the H. J. Taylor Construction Company for the construction of a certain storm sewer in the City of Salina, heretofore designated as Storm Sewer No. 25, and providing for the issuance of temporary notes to pay the cost thereof pending issuance and sale of bonds. BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas: Section 1. That the acceptance by the City of Salina of the proposal of H.J. Taylor Construction Company, hereinafter referred to as the "contractor" as submitted to the Board of Commissioners on October 14th, 1946, which is hereby found to be the lowest and best bid for such work, and the contract awarded by the Board of Commissioners of said city to said contractor and signed on behalf of the city by its Mayor on October 14, 1946, for the construction of certain public improve- ments in the City of Salina, to -wit: Construction of Storm Sewer No. 25, together with all necessary inlets, inlet connections, manholes, connect- ing lines, sluice gates and other appurtenances and which is hereby denominated the Antrim Avenue Storm Sewer, which includes the main sewer running from Dry Creek east in Antrim Avenue and terminating at Fourth Street and all laterals which drain into the Antrim Avenue Storm Sewer, being described as laterals, for convenience only, numbered 1, 1-A, 1-A-1, 1-B, 1-C, 20 2-A, 2-B, 2-B-1, 3, 3-A, 3 -AL -10 3 B, E+ C, NF -1 and M-2, all being part of said storm sewer No. 25, more parti- oularly described as followss Antrim Avenue Main: Beginning at a point on the east bank of Dry Creek is point is north 18 degrees 00' west 181 feet of a point on the center line of Eleventh Street and 19 feet south of the north line of Antrim Avenue; thence south 18 degrees OOt east 181 feet with a 66 -inch sewer pipe to manhole No. 1; thence east in Antrim Avenue with a 60 -inch sewer pipe to the intersection of Tenth Street to manhole No. 2; thence continuing east with a 54 -inch sewer pipe to the intersection of Seventh Street to man- hole No. 5; thence continuing east in Antrim Avenue with a 42-inoh sewer pipe to the intersection of Fourth Street to a special manhole, being the terminus of Antrim Avenue Main. Utt_ erilza No. 1. Beginning on the said described main sewer at manhole moo. --1, thence south in Eleventh Street with a 36 -inch sewer pipe to the intersection of Hamilton Avenue to manhole No. 22; thence continuing south in Eleventh Street with a 30 -inch sewer pipe to the intersection of Harsh Avenue to manhole No. 32; thence continuing south in Eleventh Street with a 24 -inch sewer pipe to the intersection of Pacific Ave- nue to manhole No. 43; thence continuing south in Eleventh Street with a 15 -inch sewer pipe 110 feet to manhole No. 51, being the terminus of Lateral No. 1. Lateral No, 1-A. Beginning at manhole No. 22 on said described Lateral No.=hence east in Hamilton Avenue with a 30 -inch sewer pipe to the intersection of Tenth Street to manhole No. 23; thence continuing east in Hamilton Avenue with a 15 -inch sewer pipe 165 feet to manhole No. 24, being the t erminus of Lateral No. 1-A. Lateral No. 1-A-1. Beginning in Tenth Street and 170 feet north of manhole No. 23 described in Lateral 1-A; thence south in Tenth Street with a 15 -inch sewer pipe 170 feet to said man- hole 23; thence continuing south in Tenth Street with a 21 -inch sewer pipe 245 feet to manhole No. 53; thence continuing south in Tenth Street with an 18 -inch sewer pipe to the intersection of Harsh Avenue to manhole No. 33; thence east in Harsh Avenue with a 12 -inch sewer pipe 160 feet to manhole No. 34; being the terminus of Lateral No. 1-A-1. 1 1 Lateral No. 1-B. Beginning in Tenth Street at said described manhole o. in Lateral No. 1; thence west in Harsh Avenue with a 15 -inch sewer pipe 275 feet to manhole No. 31; being k the terminus of Lateral 1-B. Lateral No. 1-C. Beginning at the intersection of Twelfth TE-reet and Pacific Avenue at manhole No. 42; thence east in, Pacific Avenue with a 12 -inch sewer pipe to the intersection of Eleventh Street and intersecting manhole No. 43; thence continuing east in Pacific Avenue with a 24 -inch sewer �ipe 288 feet to manhole No. 44; thence continuing east in Pacific Avenue with a 21 -inch sewer pipe 218 feet to manhole No. 45; being the terminus of Lateral 1-C. Lateral No. 2. Beginning at manhole No. 48 which is on the west line of anta Fe Avenue and 15 feet south of the north line of Pacific Avenue; thence west in Pacific Avenue with an 18 -inch sewer pipe to the intersection of Seventh Street to manhole No. 47; thence north in Seventh Street with a 21 - inch sewer pipe to the intersection of Harsh Avenge to man- hole No. 37; thence north in Seventh Street with a 30 -inch sewer pipe to the intersection of Hamilton Avenue to manhole No. 26; thence continuing north in Seventh Street with a 36 - inch sewer pipe to Antrim Avenue and intersecting manhole No. 5; thence continuing north in Seventh Street with a 24-ineh sewer pipe to the intersection of Otis Avenue to manhole No. 18; thence east in Otis Avenue vai th a 12 -inch sewer pipe 260 feet to manhole No. 9, being the terminus of Lateral No. 2. Lateral No. 2-A. Beginning at manhole No. 26 which is in the in ersec ion of Seventh Street and Hamilton Avenue; thence west in Hamilton Avenue with a 15 -inch sewer pipe a distance of 265 feet to manhole No. 25, being the terminus of Lateral 2-A. Lateral No. 2-B. Beginning at manhole No. 38 which is in Harsh Avenue and 176 feet east of manhole No. 37 described in Lateral No. 2; thence west in Harsh Avenue with a 12 -inch sewer pipe 170 feet to manhole No. 37; thence continuing w6st in Harsh Avenue with an 18 -inch sewer pipe 170 feet to the intersection of Eighth Street to manhole No. 36; thence continuing west with a 12 -inch sewer pipe 180 feet to manhole No. 35; being the ter- minus of Lateral No. 2-B. Lateral 2-B-1. Beginning at manhole No. 36 which is in the intersection of Harsh Avenue and Eighth Street; thence south in Eighth Street with a 15 -inch sewer pipe to the intersection of Pacific Avenue to manhole No. 46, being the terminus of Lateral No. 2-B-1. Lateral No. 3. Beginning at manhole No. 13 which is in the intersection of Euclid Avenue and Fourth Street; thence south in Fourth Street with an 18 -inch sewer pipe to the intersection of Otis Avenue to manhole No. 20; thence continuing south in Fourth Street with a 30 -inch sewer pipe to the intersection of Antrim Avenue to a special manhole; thence south in Fourth Street with a 36 -inch sewer pipe to the intersection of Hamilton Avenue to manhole No. 29; thence continuing south in Fourth Street with a 30 -inch sewer pipe to the intersection of Harsh Avenue to manhole No.40; thence continuing south in Fourth Street with a 15 -inch sewer pipe to the intersection of Pacific Avenue to manhole No. 50; thence west in Pacific Avenue with a 12 -Inch sewer pipe a distance of 160 feet to manhole No. 49; being the terminus of Lateral No. 3. Lateral No. 3-A. Beginning at manhole No. 10 in Otis Avenue and 90 feet east of the east line of -Santa Fe Avenue; thence east in Otis Avenue with a 12 -inch sewer pipe to the intersection of Fifth Street to manhole No. 11, thence continuing east in Otis Avenue with a 24 -inch sewer pipe to the intersection of Fourth Street and also intersecting manhole No. 20; thence continuing east with a 21 -inch sewer pipe to the intersection of Third Street to manhole No. 15; thence north in Third Street with an 18 -inch sewer pipe 280 feet to manhole No. 14, being the terminus of Lateral No. 3-A. Lateral No, 3-A-1. Beginning at manhole No. 11 which is in the inter- section of Utis Avenue and Fifth Street; thence north in Fifth Street with a 21 -inch sewer pipe 375 feet to manhole No. 12, being the terminus of Lateral No. 3-A-1. Lateral No. 3-B. Beginning at manhole No. 27 which is in Hamilton Avenue and 105 feet west of the east line of Santa Fe Avenue; thence east in Hamilton Avenue with a 24-inah sewer pipe to the intersection of Fifth Street to manhole No. 28; thence east with a 24 -inch sewer pipe to the intersection of Fourth Street to manhole No. 29; thence continuing east in Hamilton Avenue with a 15 -inch sewer pipe to the intersection of Third Street to manhole No, 30, being the terminus of Lateral 3-B. Lateral No. 3-C. Beginning at manhole No. 39 in the intersection of Fifth tree and Harsh Avenue; thence east with a 21 -inch sewer pipe to the intersection of Fourth Street to manhole No. 40; thence con- tinuing east in Harsh Avenue with an 18 -inch sewer pipe to the inter- section of Third Street to manhole No. 41, being the terminus of Lateral 3- C. Lateral No, A-2. Beginning at manhole No. 4 in the intersection of Antrim venue and Eighth Street; thence north in Eighth Street with a 15 -inch sewer pipe 270 feet to manhole No. 17, being the terminus of Lateral N- 2. Lateral No. A-1. Beginning at manhole No. 2 in the intersection of Antr Avenue and Tenth Street; thence north in Tenth Street with a 15 -inch sewer pipe 170 feet to manhole No. 16, being the terminus of Lateral M-1. at and for the unit prices for sa.d work contained in said proposal, which proposal and contract are hereby referred to and made parts of this ordinance, be and the same is hereby ratified and confirmed, said proposal being within the estimated cost of said improvements as shown by the sworn estimates of the City Engineer on file in the office of the City Clerk, which estimates are hereby referred to and made a part of this ordinance. Section 2. Said improvements shall be built and constructed in accord- ance with the plans and specifications therefore prepared by the City Engineer on file in the office of the City Clerk and in accordance with the proposal of said contractor and under the terms of said contract, all of which are hereby referred to and made parts of this ordinance. Section 3. That temporary notes signed by the Mayor and attested by the City Clerk be issued fdom time to time as the work progresses in the manner and form as required by law, the total amount thereof not to exceed the contract price for such mark, such notes to bear interest not to exceed 4 1/2 per centum per annum and to mature not later than December 31, 1941, and to be issued in such amounts and at such time as money for thepayment of the cost of such notes to be issued to said contractor and to be redeemed and cancelled at the time that permanent bonds are issued in lieu thereof. Section 4. This ordinance shall take effect aid be in force from and after its publication in the official city paper. Introduced, October 28, 1946 Passed, O 4, 1946 Noy. Lloyd W. Price Attests Chas. E. Banker Mayor City C`1'e rk I i STATE OF KANSAS ) SS COUNTY OF SALINE ) I,, Chas. E. Banker, City Clerk of the City of Salina, Kansas, do hereby certify that the above and foregoing is a true and correct copy of Ordinance No, 5195 passed and approved by the Board of Commissioners of the City of Salina, Kansas November 4; and a record of the vote on its final adoption is found on page tJournal No. 17. I CityCle& (First Published in the Salina Journal /o �l s 7 1946. ) ��— i OPDINANCE No. 51.95 AN ORDINANCE ratifying and confirming a contract with .,he H. J. Taylor Construction Company for the construction of a certain storm sewer in the City of Salina, heretofore designated as Storm Selmer No. 25, and providing for the issuance of temporary notes to pay the cost thereof pending issu- ance and sale of bonds. Kansas: BE IT ORDAINhD BY THE BOARD OF COT81ISSIONERS of the City of Salina, SECTION 1. That the acceptance by the City of Salina of the pro- posal of H. J. Taylor Construction Company, hereinafter referred to as the "contractor", as submitted to the Board of Commissioners on October 1ltth , 1946, -which is hereby found to be the lowest: and best bid for such work, and the contract awarded by the Board of Commissioners of said City to said contractor and signed on behalf of the city by its Mayor on October 14th , 1946, for the construction of certain public improvements in the City of Salina, to -wit: Construction of storm sewer No. 25, together with all necessary inlets, inlet connections, manholes, connect- ing lines, aluiee gates and other appurtenances and which is hereby denominated the Antrim Avenue Storm Sewer, which includes the main sewer running from Dry Creek east in Antrim Avenue and terminating at Fourth Street and all laterals which drain into the Antrim Avenue Storm Sewer, being described as laterals, for convenience only, numbered 1, 1-A, 1-A-1, 1-B, 1-C, 2, 2-A, 2-B, 2-B-1, 3, 3-A, 3-A-1, 3 B, 3-C, 11-1 and M-2, all being part of said storm sewer No. 25, more parti- cularly described as follows: Antrim Avenue Main: Beginning at a point on the east bank of Dry Creek which point is north 18 degrees OOt west 181 feet of a point on the center line of Eleventh Street and 19 feet south of the north line of .Antrim Avenue; thence south 18 degrees OOt east 181 feet with a 66 -inch sewer pipe to manhole Ido. 1; thence east in Antrim Avenue with a 60 -inch sewer pipe to the intersection. of Tenth Street to manhole No. 2; thence continuing east with a 54 -inch sewer pipe to the intersection of Seventh Street to man- hole No. 5; thence continuing east in Antrim Avenue with a 42 -inch sewer pipe to the intersection of Fourth Street to a special manhole, being the terminus of Antrim Avenue I!4ain. r Lateral No. 1. Beginning on the said described main sewer at manhole No. 1, thence south in Eleventh Street with a 36 -inch sewer pipe to the intersection of Hamilton Avenue to manhole No. 22; thence continuing, south in Eleventh Street with a 30 -inch sewer pipe to the intersection of Harsh Avenue to manhole No. 32; thence continuinv south in Eleventh Street with a 24 -inch sewer pipe to the intersection of Pacific Ave- nue to manhole No. 43; thence continuing south in Eleventh Street with a 15 -inch sewer pipe 110 feet to manhole No. 51, being the terminus of Lateral 110. 1. Lateral No, 1-A. Beginning at manhole No. 22 on said de- scribed Lateral No. 1; thence east in Hamilton Avenue with a 30 -inch sewer pipe to the intersection of Tenth Street to manhole No. 23; thence continuing east in Hamilton Avenue with a 15 -inch sewer pipe 165 feet to manhole Ido. 24, being the terminus of Lateral No. 1-A. Lateral No. 1-A-1. Beginning in Tenth Street and 170 feet north of manho e No. 23 described in Lateral 1-A; thence south in Tenth Street with a 15 -inch sewer pipe 170 feet to said manhole 23; thence continuing south in Tenth Street with a 21 -inch sewer pipe 245 feet to manhole No. 53; thence con- tinuing south in Tenth Street with an 18 -inch sewer pipe to the intersection of Harsh Avenue to manhole No. 33; thence east in harsh Avenue with a 12 -inch sewer pipe 160 feet to manhole No. 34; being the terminus of Lateral No. 1-A-1. Lateral No. 1-B. Beginning in Tenth Street at said described manhole iQo. 32 in Lateral No. 1; thence west in Harsh Avenue with a 15 -inch sewer pipe 275 feet to manhole No. 31; being the to nninus of Lateral 1-B. Lateral No. 1-C. Beginning at the intersection of Twolfth Street and Pacific Avenue at manhole No. 42; thence east in Pacific Avenue with a 12 -inch sewer pipe to the intersec- tion of Eleventh Street and intersecting manhole No. 43; thence continuing east in Pacific Avenue with a 24 -inch sewer pipe 288 feet to manhole No. 44; thence continuing east in Pacific Avenue with a 21 -inch sewer pipe 218 feet to manhole No. 45; being the terminus of Lateral 1-C. Lateral No. 2. Beginning at manhole No. 48 which is on the west line of Santa Fe Avenue and 15 feet south of the north line of Pacific Avenue; thence vrest in Pacific Avenue with an 18 -inch sewer pipe to the intersection of Seventh Street to manhole No. 47; thence north in Seventh Street with a 21 - inch sewer pipe to the intersection of Harsh Avenue to man- hole Yo. 37; thence north in Seventh Street with. a 30 -inch sewer pipe to the intersection of Hamilton Avenue to manhole No. 26; thence contir_uin;; north in Seventh Street with a 36 - inch sewer pipe to Antrim Avenue and intersecting manhold No. 5; thence continuing north in Seventh Street irlth. a 24 -inch sevrer pipe to the intersection of Otis Avenue to manhole No. 18; thence east in Otis Avenue with a 12 -inch sewer pipe 260 feet to manhole No. 9, being the terminus of Lateral No. 2. Lateral No. 2-A. Beginning at manhole Ido. 26 which is in the intersection of Seventh Street and Hamilton Avenue; thence west in. Hamilton Avenue with a 15 -inch sewer pipe a distance of 265 feet to manhole No. 25, being the tenninus of Lateral 2-A. Lateral No. 2-B. Beginning at manhole No. 38 which is in Harsh Avenue and 170 feet east of manhole No. 37 described in Lateral 7o. 2; thence west in Harsh Avenue with a 12 -inch sewer pipe 170 feet to manhole do. 37; thence continuing west in Harsh Avenue with an 18 -inch sewer pipe 170 feet to the intersection of Eighth Street to manhole No. 36; thence continuing west with a 12 -inch sewer pipe 180 feet to manhole Vo. 35; being; the ter- minus of Lateral No. 2-B. J Lateral 2-B-1. Beginning at manhole No. 36 which :is in the intersection of Harsh Avenue and Eighth Street; thence south in Eighth Street with a 15 -inch sewer pipe to the intersection of Pacific Avenue to manhole No. 46, being the terminus of Lateral No. 2-B-1. Lateral No. 3. Beginning at manhole No, 13 which is in the intersection of Euclid Avenue and Fourth Street; thence south in Fourth Street with an 18 -inch sewer pipe to the intersection of Otis Avenue to manhole No. 20; thence continuing south in Fourth Street with a 30 -inch s -ewer pipe to the intersection of Antrim. Avenue to a Special manhole; thence south in Fourth Street with a 36 -inch sewer pipe to the intersection of Hamilton Avenue to manhole No. 29; thence continuing south in Fourth Street with a 30 -inch sewer pipe to the intersection of Harsh Avenue to manhole No. 40; thence continuing south in Fourth Street with a 15 -inch sewer pipe to the intersection of Pacific Avenue to manhole No. 50; thence west in Pacific Avenue with a 12 -inch sewer pipe a distance of 160 feet to manhole No. 49; bein_; the terminus of Lateral No. 3. Lateral No. 3-A. Beginning at manhole No.. 10 in Otis Avenue and 90 feet east of the east line of Saalta Fe Avenue; thence east in Otis Avenue with a 12 -inch sewer pipe to the inter- section of Fifth Street to manhole No. 11, thence continuing east in Otis Avenue with a 24 -inch sewer pipe to the inter- section of Fourth Street and also intersecting manhole No. 20; thence continuing east with a 21 -inch sewer pipe to the intersection of Third Street to manhole No. 15; thence north in Third Street with an 18 -inch sewer pipe 280 feet to man- hole No. 14, being the terminus of Lateral No. 3-A. Lateral No. 3-A-1. Beginning at manhole No. 11 which is in theinterseetionof Otis Avenue and Fifth Street; thence north in Fifth Street with a 21 -inch sewer pipe 375 feet to manhole No. 12, being the terminus of Lateral No. 3-A-1. Lateral No. 3-B. Beginning at manhole No. 27 which is in Hamilton Avenue and 105 feet west of the east line of Santa Fe Avenue; thence east in Hamilton Avenue with a 24 -inch sewer pipe to the intersection of Fifth Street to manhole Ido. 28; thence east with a 24 -inch sewer pipe to -the inter- section of Fourth Street to manhole No. 29; thence contin- uing east in Hamilton Avenue with a 15 -inch sewer pipe to the intersection of Third Street to manhole No. 30, being the terminus of Lateral 3-B. Lateral No. 3-C. Beginning at manhole No. 39 in the inter- section of Fifth Street and Harsh Avenue; thence east with a 21 -inch sewer pipe to the intersection of Fourth Street to manhole No. 40; thence continuing east in Harsh Avenue with an 18 -inch sewer pipe to the intersection of Third Street to manhole No. 41, being the terminus of Lateral 3-C. Lateral No. I,1-2. Beginning at Manhole No. 4 in the inter- section of P=L -rim Avenue and Eighth Street; thence north in Eighth Street with a 15 -inch sewer pipe 270 feet to .nanhole No. 17, being the terminus of Lateral 11-2. Lateral No. M-1. Beginning at manhole Dio. 2 in the inter- section of Antrim Avenue and Tenth Street; thence north in Tenth Street with a 15 -inch sewer pipe 170 feet to manhole No. 16, being the terminus of Lateral M-1. 7, at and for -- -- v 1. 1 .a, --U L Vi r]uL4 YY Vi S� V Vit UO"llu'L. L11 Q".LU 1J1-Vj.)U0?A.1, VVII1LUSl proposal and contract are hereby referred to and :made parts of this ordin- ance, be and the same is hereby ratified and confirmed, said !eroposal beim; within the estimated cost of said improvements as shown by the sworn esti- mates of the City Engineer on file in the office of the City Clerk, which estimates are hereby referred to and made a part of this ordinance. SECTION 2. Said improvements shall be built and constructed in accordance with the plans and specifications therefore prepared by the City Engineer on file in the office of the City Clerk and in accordance with the proposal of said contractor and under the terms of said contract, all of which are hereby referred to and made parts of this ordinance. SECTION 3. That temporary notes signed by the Mayor and attested by the City Clerk be issued from time to time as the work progresses in the manner and form as required by law, the total amount thereof not to exceed the contract price for such work, such notes to bear interest not to exceed 4 1/2 per centum per annum and to mature not later than December 31st , 1941, and to be issued in such amounts and at such time as money for the payment of the cost of such notes to be issued to said contractor and to be redeemed and cancelled at the time that permanent bonds are issued in lieu thereof. SECTION 4. This ordinance shall take effect and be in force from and after its publication in the official city paper. Attest: City Clerk. Introduced October 28th , 1946. Passe November lith 1946. O i '� Mayor