Loading...
5645 Confirm Street Improvements- - - -- - - - _-oi-INANa- No-.---5645-- A-j ORDINTANCE ratifying and confirming a contract with the H. J. Taylor Construction Company for the construction of certain curbing, guttering, paving and grading improvements on certain streets and the paving and grading of a certain alley in the City of Salina, and providing for the issuance of temporary notes to pay the cost thereof pending the issuance and sale of bonds. BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas: Section 1. That the acceptance by the City of Salina, Kansas, of the proposal of the H. J. Taylor Construction Co:ripany, hereinafter referred to as the "contractor" as sub- mitted to the Board of Commissioners on April 21, 1952, which is hereby found to be the lowest and best bid for such work, and the contract awarded by the Board of Commissioners of said city to said contract and signed on behalf of the city by its 1111ayor on April 22, 1952 for the construction of certain )ublic improvements in the City of Salina, Kansas, to -wit: Curbing, guttering, paving and grading of University Street from the west line of Clark Street to the east line of Broadway Boulevard, as provided by Ordinance Number 5635. Paving and grading of Sheridan Street from the north line of Venango Street to the south line of r�ranklin Street, as provided by Ordinance Number 5635. Paving and grading of alley first east of Fifth Street from the north line of Iron Avenue, north 207 feet, more or less, to the existing brick pavement, as provided by Ordinance Number 5636, at and for the unit price of said work contained in said proposal, which proposal and contract are hereby referred to and made a part of this ordinance, be and the same is hereby ratified and confirmed, said proposal being within the estimated cost of said improvements as shown by the sworn estimates of the City ingineer on file in the office of the City Clerk, which estimates are hereby referred to and made a part; of this ordinance. Section 2. Said improvements shall be built and constructed in accordance i,-ith the plans and specifications therefore prepared by the City Engineer on file in the office of the City Clerk and in accordance with the proposal of said contractor and. under the terms of said contract, all of which are hereby referred to and made parts of this ordinance. Section 3. That temporary notes signed by the Mayor and attested by the City Clerk be issued from time to time as the work progresses in the manner and form provided and required by law, the total amount thereof not to exceed the contract price for such work, such notes to bear interest not to exceed 4z per cent per annum and to mature not later than. December 1, 1953, and to be issued in such amounts and at such times as money for the payment of the cost of such notes to be issued to said contractor and to be redeemed and - cancelled at the time that permanent bonds are issued in lieu thereof. Section 4. This ordinance shall take effect and be in force fro.❑ and after its publica- tion once in the official city paper. Introduced, April 211952 (SEAL) ;fittest:A er, City C ei Passed, April 28, 1952 1 1-4 .4 ; F- � A A J I ayor Z-7 -