5759 Levy AssessmentsORDINANCE NUMBER 5759
(Published in the Salina Journal ,<1953)
AN ORDINANCE relating to and apportioning and levying special assessments on certaLn
lots and pieces of ground in the City of Salina, Kansas, to pay the cost of con-
struction of lateral sanitary sewers in Lateral Sanitary Sewer Districts numbered
DH -1 to DH -32, inclusive, and relating to and providing for the collection and pay-
ment of such assessments.
BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas
Section 1. That for the purpose of paying for the cost of building and con-
i
stracting lateral sanitary sewers in Lateral Sanitary Sewer Districts numbered
DH -1 to DH -32, inclusive, as authorized by the provisions of Ordinance Number 5671
the cost of which has been duly ascertained as shown by the City Engineerts Final
Estimate of Cost, which has been duly approved by the Board of Commissioners, there
i
j
are hereby levied and assessed on the property liable therefor, being all the lots
i
i
and pieces of ground lying in the sewer districts mentioned above as created by
Ordinance Number 56711, according to the appraised value of such lots and pieces of
ground without regard to the buildings or improvements thereon, special assessments
i
covering the cost of such improvements constructed in said sewer districts, said
special assessments beim based on the
p g special valuation and appraisement made by
three disinterested appraisers appointed by the Board of Commissioners of the City
of Salina, Kanaeis, vVeli said appraisement is hereby referred to and made a part
of this ordinance, and the several amounts levied and apportioned against the lots
and pieces of ground in said sewer districts for the purppse of paying the cost of
i
the improvements constructed in such district being hereby found and determined to
be as set forth in the following sections of this ordinance.
Section 2. That for the purpose of the payment of the construction of Lateral
Sanitary Sewer Number DH -1, an eight inch clay pipe sewer, beginning at a manhole
to be constaucted in Crawford Street approximately 300 feet east of the iriersection
of Crawford Street and Seneca Avenue; thence south approximately 75 feet; thence
i
southwesterly approximately 185 feet; thence north approximately 90 feet where a
manhole will be constructed which will be the terminus of Lateral Number DH -1,
the amount levied, apportioned and assessed agiinkt the lots and pieces of ground
in said district are found and determined to be as follows:
SUNSET MANOR ADDITION
Block 18
Lott ------189.71
Lot 2 - - - - - 189.71
Lot 3----- 189.71
Lot h - - - - - 189.71
Lots 142.28
- ----
Lot 9----- 1112.28
Lot 10- - - - 189.70
Total - - 1,233.10
1
Section 3. That for the purpose of the payment of the cost of construction
of Lateral Sanitary Sewer Number DH -2, an eight inch clay pipe sewer, beginning
at a manhole to be constructed in the center of the easement and located at the
southeast corner of Lot 5, Block 81, Sunset Manor Addition and running south 60
feet; thence southeasterly 40 feet where a manhole will be constm cted which will
be the terminus of Lateral DH -2, the amount levied, apportioned and assessed
against the lots and pieces of ground in said district are found and determined to
be as follows:
SUNSET MANOR ADDITION
Block 18
Lot 6 - - - - - 161.57
Lot? -----183.12
Lot 8---- 148.11
Total - - - 492.80
Section 4. That for the purpose of the payment of the cost of construction
of Lateral Sanitary Sewer Number DH -3, an eight inch clay pipe sewer, beginning
at a manhole to be constructed in the intersection of Crawford Street and Seneca
Avenue; thence south approximately 120 feet; thence west approximately 150 feet;
thence southeasterly along the easement approximately 400 feet where a manhole
will be constructed which will be the terminus of Lateral DH -3, the amount levied,
apportioned and assessed against the lots and pieces of ground in said district
are found and determined to be as follows:
SUNSET MANOR ADDITION
Block
19
Lot
1 - - -
- 251.72
Lot
2 - - -
- 215.74
Lot
3 - - -
- 215.74
Lot
4 - - -
- 215.74
Lots
----215.74
Lot
6 - - -
- 215.74
Lot
10- - -
- 197.76
Lot
11- - -
- 197.76
Lot
12- - -
- 197.76
Lot
13 - --
- 197.76
Lot
14- - -
- 197.76
Lot
15- - -
- 197.76
Lot
16- - -
- 215.74
Total - -
2,732,72
1
1
1
Section 5. That for the purpose of the payment of the cost of construction
OF Lateral Sanitary Sewer DH -4, an eight inch clay pipe sewer, beginning at a
manhole to be constructed in the center of the easement and located at the northwest
corner of Lot 5, Block lei, Sunset Manor Addition, and running westerly approximately
80 feet where a manhole will be constructed witch will be the terminus of Lateral DH -4
the amount levied, apportioned and assessed against the lots and pieces of ground in
SUNSET MANOR ADDITION said district are found and
determined to be as follows:
Block 19
Lot 7----105.30
Lot 8 - - - - 105.30
Lot 9 - - - 96.52
Total - - - 307.12
Section 6. That for the purpose of the payment of the cost of construction
i
of Lateral Sanitary Sewer DH -5, an eight inch clay pipe sewer, beginning at a
manhole to be constructed in the intersection of Crawford Street and Cherokee
Drive running south approximately 90 feet; thence southwesterly approximately 470
feet; thence northwesterly approximately 80 feet; where a manhole will be constructed
which win be the terminus of Lateral DH -5, the amount levied, apportioned and assess-
ed against the lots and pieces of ground in said district are found and determined
to be as follows: SUNSET MANOR ADDITION
Block 20
Lot 3 - - - - 376.12
Lot 4 - - - - 526.56
Lot 5----526.56
Lot 6 - - - - 376.12
Lot 7 - - - - 376.12
Lot 8 - - - - 376.12
Lot 9 - - - - 376.12
i
Lot 10- - - - 376.12
j Lot 11- - - - 488.96
Total - - 31798.80
Section 7. That for the purpose of the payment of the cost of construction
of Lateral Sanitary Sewer Number DH -6, an eight inch clay pipe sewer, beginning
at a manhole to be constructed 390 feet north of the center line of Franklin Avenue
and running northwesterly approximately 450 feet where a manhole will be constructed
which will be the terminus of Lateral DH -6, the amount levied, apportioned and
assessed against the lots and pieces of ground in said district are found and
determined to be as follows:
SUNSET MANOR ADDITION
Block 8
Lot 5 - - - - 271.75
Lot 6 - - - - 271.75
Lot? ----266.81
Lot 8 - - - - 261.87
U
1
SUNSET MANOR ADDITION
Block 8
Lot 9 - - - - 247.04
i
Lot 10- - - - 247.04
Lot 11- - - - 247.04
Total - 1,813.30
Section 8. That for the purpose of the payment of the cost of construction
of Lateral Sanitary Sewer Number DH -7, an eight inch clay pipe sewer, beginning
I
j at a manhole which is the terminus of Lateral DH -6, as aforesaid, and running
I
southwesterly approximately 300 feet; thence northwesterly approximately 370
feet; thence northeasterly 80 feet where a manhole will be constructed which will
I
be the terminus of Lateral Number DH -7, the amount levied, apportioned and assessed
i
against the lots and pieces of ground in said district are found and determined to
be as follows:
SUNSET MANOR ADDITION
Block 10
Lot 9 - - - - 213.76
Lot l0- - - - 213.76
Lot 11- - - - 213.76
Lot 12- - - - 213.76
Lot 13- - - - 213.76
Lot 14- - - - 213.76
Lot 15- - - - 213.76
Lot 16- - - - 256.53
Lot 20- - - - 213.76
Lot 21- - - - 213.76
Lot 22- - - - 213.76
Lot 23- - - - 213.76
Lot 24- - - - 213.76
Total 2,821.65
Section 9. That for the purpose of the payment of the construction
of
Lateral Sanitary Sewer DH -8, an eight inch clay pipe sewer, beginning at
a manhole
to be constructed in the center of the easement and located at tge north
corner
of Lot 19, Block 10, Sunset Manor Addition, and running southwesterly 80
feet where
a manhole will be constructed which will be the terminus of Lateral DH -8,
the
amount levied, apportioned and assessed a#ainst the lots and pieces of ground
in
said district are found and determined to be as follows:
SUNSET MANOR ADDITION
Block 10
Lot 17 - - - - 108.39
Lot 18 - - - - 108.39
1
SUNSET MANOR ADDITION
Block 10
Lot 19 - - - - 90.3
Total 307.12
Section 10. That for the purpose of the payment of the cost of construction
of Lateral Sanitary Sewer Number DH -9, an eight inch clay pipe sewer beginning
at a manhole to be constructed in the center of the easement and the center of the
10 foot pedestrian right-of-way and located near the north corner of Lot 25, Block
10, Sunset Manor Addition and running southeasterly approximately 500 feet where
a manhole will be constructed which wil 1 be the terminus of Lateral DH -9, the
amount levied, apportioned and assessed against the lots and pieces of ground in
said district are found and determined to be as follows:
SUNSET MANOR ADDITION
Block 10
Lot 1 - - - - 129.03
Lot 2 - - - - 107.53
Lot 3----116.13
Lot h - - - - 107.53
Lot 5 - - - - 116.13
Lot 6 - - - - 107.53
Lot 7 - - - - 107.53
Lot 8 - - - - 116.13
Lot 25- - - - 107.53
Lot 26- - - - 107.53
Lot 27- - - - 107.53
Lot 28- - - - 107.53
Lot 29- - - - 107.53
Lot 30- - - - 107.53
Lot 31- - - - 118.29
Total - - 12671.01
Section 11. That for the purpose of the payment of the cost of construction
of Lateral Sanitary Sewer Number DH -10, an eight inch clay pipe sewer beginning
at a manhole to be constructed in the center of the easement and located at the
west corner of Lot 2, Block 20, Sunset Manor Addition and running southeasterly 150
feet where a manhole will be constructed which will be the terminus of Lateral
DH -10, the amount levied, apportioned and assessed against the lots and pieces of
ground in said district are found and determined to be as follows:
J
L�J
SUNSET MANOR ADDITION
Block 20
Lot 1 - - - - 296.58
Lot 2 - - - - 228.14
Lot 12- - - - 273.77
Total - - - 798.49
Section 12. That for the purpose of the payment of the cost of construction
of Lateral Sanit asry Sewer Number DH -11, an eight inch clay pipe sewer beginning
at the manhole which is the terminus of Lateral DH -10, as aforesaid, and running
southwesterly approximately 140 fe6t; thence northwesterly approximately 130 feet;
thence southwesterly approximately 140 feet; thence southeasterly approximately
950 feet, where a manhole will be constructed which will be the terminus of
Lateral DH -11, the amount levied, apportioned and assessed against the lots and
pieces of ground in said district are found and determined to be as follows:
SUNSET MANOR ADDITION
Block 14
Lot
1 - - -
- 206.74
Lot
2 - - -
- 206.74
Lot
3 - - -
- 206.74
Lot
4 - - -
- 159.06
Lot
5 - - -
- 159.06
Lot
6 - - -
- 159.06
Lot
7 - - -
- 159.06
Lot
8 - -
- - 159.06
Lot
9 - -
- - 159.06
Lot
10- -
- - 159.06
Lot
11- -
- - 159.06
Lot
12- -
- - 159.06
Lot
13- -
- - 159.06
Lot
14- -
- - 159.o6
Lot
15- -
- - 159.06
Lot
16- -
- - 190.83
Lot
20- -
- - 159.06
Lot
21- -
- - 159.06
Lot
22- -
- - 159.06
Lot
23- -
- - 159.06
Lot
24- -
- - 159.06
Lot
25- -
- - 159.o6
Lot
26- -
- - 159.06
Lot
27- -
- - 159.06
Lot
28- -
- - 1.59.06
SUNSET MANOR ADDITION
Block
Lot 29 - - - - 159.06
Lot 30 - - - - 159.06
i
Lot 31 - - - - 159.06
Lot 32 - - -_ 222.73
Total - - 4,851.22
Section 13. That for the purpose of the payment of the cost of construction
i
i
of Lateral Sanitary Sewer Number DH -12, an eight inch clay pipe sewer beginning
i
at a manhole to be construEted in the center of the easement and located at the
north norner of Lot 19, Block 14, Sunset Manor Addition, and running southwesterly
i
approximately 160 feet; thence northwesterly approximately 120 feet; thence
southwesterly approximately 150 feet; thence southeasterly approximately 675
;
feet; thence northeasterly approximately 80 feet; where a manhole will be con-
structed which will be the terminus of Lateral DH -12, the amount levied, apportioned
i
and assessed against the lots and pieces of ground in said district are found
and determined to be as follows:
SUNSET MANOR ADDITION
Block 14
Lot 17 - - - - 2.8.23
Lot 18 - - - - 248.23
Lot 19 - - - - 206.85
Block 1
Lot 1 - - - - 289.60
Lot 2 - - - - 206.85
Lot 3 - - - - 206.85
Loth. ----206.85
Lot 5 - - - - 206.85
Lot 6 - - - - 206.85
i
Lot 7 - - - - 206.85
Lot 8----206.85
Lot 9 - - - - 206.85
Lot 10 - - - - 206.85
Lot 11- - - - 289.60
Lot 12- - - - 268.91
Lot 13- - - - 206.85
Lot 14- - - - 206.85
Lot 15- - - - 206.85
Lot 16- - - - 206.85
Lot 17- - - - 206.85
Lot 18- - - - 206.85
Lot 19- - - - 206.85
SUNSET MANOR ADDITION
Block 15
j Lot 20 - - - - 206.85
Total - _ 5,067.87
Lateral Number DH -14, the amount levied, apportion and assessed against the lots
Section 14. That for the purpose of the payment of the cost of construction
of Lateral Sanitary Sewer Number DH -13 an eight inch clay ay pipe sewer, beginning
i
at a manhole to be constructed in the center of the easement and located at the
I
east corner of Lot 21, Block 15, Sunset Manor Addition and running southwesterly
approximately 150 feet; thence northwesterly approximately 70 feet; thence south-
westerly approximately 115 feet; thence south approximately 540 feet; thence
east 80 feet, where a manhole will be constructed which will be the terminus of
Lateral DH -13, the amount levied, apportioned and assessed against the lots and
pieces of ground in said district are found and determined to be as follows:
i
j SUNSET MANOR ADDITION
Bloom
Lot21 - - - - - 155.74
Lot 22- - _ - _ 186.89
Lot 23- - - - - 186.89
Block 16
Lot 1 - - - - 155.74
Lot 2 - - - - - 155.74
Lot 3 - - - - - 155.74
Lot 4-----155.74
Lot 5 - - - - - 155.74
Lot 6 _ - - - 155.74
?got 7 - -- - - 155.74
i Lot 8_----171.35
Lot 9 - - - - - 186.89
Lot 13- - - - - 155.74
Lot 14- _ _ - - 155.74
Lot 15- - - - - 155.74
Lot 16- - - - - 155.74
Lot 17- - - - - 155.74
Lot 18- - - - - 155.74
Lot 19- - - - - 155.74
Lot 23- - - - - 171.35
Total - - 3,239.47
Section 15. That for the purpose of the payment of the cost of construction
of Lateral Sanitary Sewer DH -14, an eight inch clay pipe sewer, beginning at a
manhole to be constructed in the center of the easement and located at the northeast
corner of Lot 12, Block 16, Sunset Manor Addition, and running west approximately
110 febt; where a manhole will be constructed which will be the terminus of
Lateral Number DH -14, the amount levied, apportion and assessed against the lots
n
1
1
and pieces of ground in said district are found and determined to be as follows:
SUNSET MANOR ADDITION
Block 16
Lot 10 - - - - 125.09
Lot 11 - - - - 150.11
Lot 12 - - - - 125.09
Total - 100.29
Section 16. That for the purpose of the payment of the cost of construction of
Lateral Sanitary Sewer DH -15, an eight inch clay pipe sewer beginning at a manhole
to be constructed at the center of the easement and located at the southeast corner
of Lot 20, Block 16, Sunset Manor kAddition, and running west approximately 80 feet
where a manhole will be constructed which will be the terminus of Lateral DH -15, the amount
levied, apportioned and assessed against the lots and pieces of ground in said district
SUNSET MANOR ADDITION are found and detemined to be
as follows:
Block 16
El,ot 20- - - - 103.11
Lot 21 - - - - 103.10
lot 22 - - - - 103.11
Total - - - 309.32
Section 17. That for the purpose of the payment of the construction of Lateral
Sanitary Sewer DH -16, an eight inch clay pipe sewer beginning at a manhole to be
constructed in Cherokee Drive, midway between Commanche Avenue and Choctaw Avenue and
running southwesterly approximately 160 feet; thence southeasterly approximately 1140
1
feet; thence southwester7approximately 360 feet; thence south approximately 560 feet;
thence west 80 feet, where a manhole will be constructed which will be the terminus
Of Lateral DH -16, the amount levied, apportioned and assessed against the lots and pieces
of ground in said district are found and determined to be as follows:
SUNSET MANOR ADDITION
Block 17
Lot
2 - - - -
147.20
Lot
3----1147.20
Lot
4----1147.20
Lot
5----1147.20
Lot
6 - - - -
147.20
Lot
7 - - - -
147.20
Lot
8 - - - -
147.20
Lot
9 - - - -
147.20
Lot
10- - - -
147.20
Lot
11- - - -
147.20
Lot
12- - - -
147.20
Lot
13- - - -
220.79
Lot
14- - - -
220.79
C
1
1
SUNSET MANOR ADDITION
Block 17
Lot 15 -
- - - 206.07
Lot 16 -
- - - 147.20
Lot 17 -
- - - 147.20
Lot 18 -
- - - 147.20
lot 19----147.20
Lot 20 -
- - - 147.20
Lot 21 -
- - - 147.20
Lot 22 -
- - - 147.20
Lot 23 -
- - - 147.20
Lot 24 -
- - - 147.20
Lot 25 -
- - - 147.20
Lot 26 -
- - - 147.20
Lot 27 -
- - - 147.20
Lot 28 -
- - - 161.90
Total.
4,195.15
Section 18. That for the purpose
of the payment of the cost of construction
of Lateral Sanitary Sewer Number DH -17,
an eight inch clay pipe sewer beginning
at a manhole to be constructed in the
center of the easement and located at the
southwest corner of Lot 1 of Block 17,
Sunset Manor Addition, and running east 80
feet, where a manhole will be constructed
which will be the terminus of Lateral
DH -17, the amount levied, apportioned
and assessed against the lots and pieces of
ground in said district are found and
determined to be as follows:
SUNSET MANOR ADDITION
Block 17
Lot 1 - -
- - 97.20
Lot 29- -
- - 103.02
Lot 30- -
- - 106.90
Total -
- 307.12
Section 19.. That for the purpose
of the payment of the cost of construction
of Lateral Sanitary Sewer Number DH -18, an eight inch clad* pipe sewer beginning at
at a manhole to be constructed as the
terminus of Branch Main Sewer DH -B and
running south approximately 500 feet;
thence west approximately 20 feet; thence
south approximately 1,150 feet, where
a manhole will be constructed which will be
the terminus of Lateral DH -18, the amount levied, apportioned and assessed against
the lots and pieces of ground in said
district are found and determined to be as
follows:
SUNSET MANOR ADDITION
Block 7
Lot l -
- - - 463.31
Lot 2----379.08
Lot 3 -
- - - 379.08
Loth ----379.08
Lot 5
-- - - 379.08
Lot 6 -
- - - 379.08
Lot 7 -
- - - 379.08
Lot 8 -
- - - 379.08
Lot 9 -
- - - 379.08
Lot 10-
- - - 379.08
Lot 11-
- - - 379.08
Lot 12-
- - - 379.08
Lot 13-
- - - 379.08
Lot 14-
- - - 379.08
Lot 15-
- - - 379.08
Lot 16-
- - - 379.08
Lot 17-
- - - 379.08
Lot 18-
- - - 379.08
Lot 19-
- - - 505.44
Block 8
Lott ----463.31
Lot 2 -
- - - 421.20
Lot 3 -
- - - 463.31
Lot 4 -
- - 463.31
Total
- - 9,224.24
Section 20. That for the purpose
of the payment of the cost of construction
of Lateral Sanitary Sewer Number DH -19, an eight inch clay pipe sewer beginning
in a manhole to be constructed in the center of the easement and located at the
southeast corner of Lot 19, Block 7,
Sunset Manor Addition and running west
approximately 300 feet; thence south
approximately 735 feet; thence east 80 feet,
where a manhole will be constructed which will be the terminus of Lateral DH -19,
the amount levied, apportioned and assessed
against the lots and pieces of ground
in said district are found and determined to be as follows:
SUNSET MANOR ADDITION
Block 9
Lot 1 -
- - - 144.93
Lot 2 -
- - - 244.93
Lot 3 -
- - - 144.93
Lot 4----144.93
Lot 5----1411.93
1
L
SUNSET MANOR ADDITION
Block 9—
Lot
Lot 6 - - - - 144.93
j
Lot 7 - - - - 144.93
i
Lot 8----14.4.93
i
Lot 9 - - - - 144.93
I
Lot 10- - - - 144.93
i
Lot 11- - - - 144.93
Lot 12- - - - 144.93
i
Lot 13- - - - 159.42
Lot 14- - - - 153.63
Lot 16- - - - 144.93
Lot 17- - - - 144.93
Lot 18- - - - 144.93
Lot 19- _ _ - 144.93
i
Lot 20- - - - 144.93
Lot 21- - - - 144.93
Lot 22- -_ - 144.93
Lot 23- - - - 1.4.4.93
Lot 24- - - - 14.4.93
Lot 25- - - - 144.93
Lot 26- - - - 144.93
Lot 30- - - - 159.42
Total 3,805.86
Section 21. That for the purpose of the payment of the cost of construction
of Lateral Sanitary Sewer Number DH -20,, an eight inch clay pipe sewer, beginning
in a manhole to be constructed in the center of the easement and located at the
I
southeast corner of Lot 27 of Block 9, Sunset Manor Addition, and running west 80
feet, where a manhole will be constmated which will be the terminus of Lateral DH -20,
the amount levied, apportioned and assessed against the lots and pieces of ground in
said district are found and determined to be as follows:
SUNSET MANOR ADDITION
?Block 20
Lot 27- - - - 93.02
Lot 28- - _ - 102.33
Lot 29- - - - 98.611
Total - - 293.96
Section 22. That for the purpose of the payment of the cost of construction
of Lateral Sanitary Sewer Number DH -21, an eight inch clay pipe sewer, beginning
at a manhole to be constructed in the center of the easement and located at the
northeast corner of Lot 16, Block 9, Sunset Manor Addition and running west approx-
imately 300 feet; thence south approximately 735 feet; thence east 80 feet, where a
manhole will be constructed which will be the terminus of Mtteral DH -21, the amount
levied, apportioned and assessed against the lots and pieces of ground in said district
are found and determined to be as follows:
i
SUNSET MANOR ADDITION
Block
9
Lot 15 - -
- - 146.69
Bloom
Lot 1 - - -
- 133.37
Lot 2 - - -
i
- 133.37
Lot 3 - - -
- 133.37
Lot) ----133.37
Lot 5 - - -
- 133.37
Lot 6 - - -
- 133.37
Lot 7 - - -
- 133.37
Lot $- - -
- 133.37
Lot 9 - - -
- 133.37
Lot 10- - -
- 133.37
Lot 11- - -
- 133.37
Lot 12- - -
- 133.37
Lot 13- - -
- 116.69
Lot 1l4----141..36
Lot 16- - -
- 133.37
i
Lot 17- - -
- 133.37
Lot 18- - -
- 133.37
Lot 19-- -
- 133.37
Lot 20- - -
- 133.37
Lot 21- - -
- 133.37
Lot 22- - -
- 133.37
Lot 23- - -
- 133.37
Lot 24- - -
- 133.37
Lot 25- - -
- 133.37
Lot 26- - -
- 133.37
Lot 30- - -
- 146.69
Tcba - -
3,648.94
Section 23. That for the purpose of
the payment of the cost of construction
of Lateral Sanitary Sewer DH -22, an eight
inch clay pipe sewer beginning in a
manhole to be constructed in the center of the easement and located at the south-
east corner of Lot 27, Block 11, Sunset Manor Addition., and running west 80 feet,
where a manhole will be constructed. which
will be the terminus of Lateral DH -22,
the amount levied, apportioned and assessed against the lots and pieces of ground
in said district are found and determined
to be as follows:
SUNSET MANOR ADDITIDN
Block 11
Lot 27 - - - - 90.78
i
Lot 28 - - - - 99.86
Lot 29 - - - - 96.24
i
Total - 286.88
I
Section 24. That for the purpose of the payment of the cost of construction of
Lateral Sanitary Sewer DH -23, an eight inch clay pipe sewer beginning in a manhole to
be constructed in the center of the easement and located at the northeast corner of
Lot 16, Block 11, Sunset Manor Addition and running west approximately 285 feet; thence
jsouthwesterly approximately 120 feet; thence south approximately 615 feet; thence east
I
80 feet, where a manhole will be constructed which will be the terminus of DH -23,
i
the amount levied, apportioned and assessed against the lots and pieces of ground in
said district are found and determined to be as follows:
i
SUNSET MANOR ADDITION
Block 1.1
Lot 15 - - -- 163.54
Block 12
Lot 1 - - - - 148.67
Lot 2 - - - - 148.67
Lot 3 - - - - 148.67
Lot 4 - - - - 148.67
Lot 5 - - - - 148.67
Lot 6 -- - - 148.67
Lot 7 - - - - 148.67
Lot 8 - - - - 148.67
i
Lot 9 - - - - 148.67
Lot 10- - - - 148.67
Lot 11- - - - 148.67
Lot 12- - - - 148.67
�I Lot 13- - - - 208.15
Lot 14- - - - 208.15
Lot 15- - - - 148.67
Lot 16- - - - 148.67
Lot 17 - - - 148.67
Lot 18- - - - 148.67
Lot 19- - - - 148.67
Lot 20- - - - 148.67%
Lot 21- - - - 148.67
Lot 22- - - - 148.67
Lot 23- - - - 148.67
Lot 24- - - - 148.67
1
SUN% T MANOR ADDITION
Block 12
Lot 28 - - - 163.54
Total - 4,014.12
Section 25. That for the purpose of the payment of the cost of construction
of Lateral Sanitary Sewer DH -24, an eight inch clay pipe sewer beginning in a
manhole to be com tructed in the center of the easement and located at the southeast
corner of Lot 25, of Block 12, Sunset Marcor Addition, and running west 80 feet
where a manhole will be constructed which will be the terminus of Lateral DH -24,
against
the amount levied, apportioned and assessed/the lots and pieces of ground in said
district are found and determined to be as follows:
SUNSET MANOR ADDITION
Block 12
Lot 25 - - - - 97.70
Lot 26 - - - 107.47
Lot 27- - - - 103.56
Total - - 308.73
Section 26. That for the purpose of the payment of the cost of cors traction of
Lateral Sanitary Sewer DH -25, the eight inch clay pipe sewer beginning in a manhole
to be constructed as the terminus of Lateral DH -18, as aforesaid, and running west
approximately 270 felt, whence north approximately 150 feet; thence west approxi-
mately 660 feet; thence south 80 feet, where amanhole will be constructed which
will be the terminus of Lateral DH -25, the amount levied, apportioned and assessed
against the lots and pieces of ground in said district are found and determined to
be as follows:
SUNSET MANOR ADDITION
Block 13
Lot
1 - - - -
221.39
Lot
5 - - - -
201.21
Lot
6 - - - -
201.21
Lot
7 - - - -
201.21
Lot
8- - - -
201.21
Lot
9 - - - -
201.21
Lot
10- - - -
201.21
Lot
11- - - -
201.21
Lot
12- - - -
201.21
Lot
13- - - -
201.21
Lot
17- - - -
221.39
Lot
18- - - -
201.21
Lot
19- - - -
201.21
Lot
20- - - -
201.21
Lot
21- - - -
201.21
I
C
D
SUNSET MANOR ADDITION
Block 13
Lot 22----201.21
Lot 23 - - - - 201.21
Lot 24 - - - - 201.21
Lot 25 - - - - 201.21
Lot 26 - - - - 201.21
Lot 27 - - - - 201.21
Lot 28 - - - - 201.21
Total - - 4,466.98
Section 21. That for the purpose of the payment of the cost of the construction
of Lateral Sanitary Sewer DH -26, an eight inch clay pipe sewer beginning in a
manhole to be contructed in the center of the easement and located at the southeast
corner of Lot 4, Block 13, Sunset Manor Addition and running north 30 feet, where
a manhole will be constructed which will be the terminus of Lateral DH -261, the
amount levied, apportioned and assessed against the lots and pieces of ground in
said district are found and determined to be as fol4ows:
SUNSET MANOR ADDITION
Block 13
Lot 2 - - - - 118.58
Lot 3 - - - 123.06
Lot 4 - - - - 13-1.88
Total 353.52
Section 28. That for the purpose of the payment of the cost of cons#ruction of
Lateral Sanitary Sewer Number DH -27, an eight inch clay pipe sewer beginning in a
manhole to be constructed in the center of the easement and located at the southwest
corner of Lot 14 of Block 13 and running north 80 feet, where a manhole will be
constructed which will be the terminus of Lateral DH -27, the amount levied, apportioned
and assessed against the lots and pieces of ground in said district are found and
determined to be as follows:
SUNSET MANOR ADDITION
Block 13
Lot 14 - - - - 94.89
Lot 1X5-- - - 113.86
Lot 16- - - - 100.57
Total 309.32
Section 29. That for the os f th
Block
Lott- - 164,98
Lot 2 - - - - 149.98
Lot 3 - - - - 149.98
Lot 4 - - - - 149.98
Lots ----149.98
P'P e o e payment of the cost of construction
of Lateral Sanitary Sewer DH -28, an eight inch clay pipe sewer beginning at a
manhole to be constructed in the intersection of Republic Avenue and Osage Avenue
and running south approximately 145 feet; thence west approximately 1,180 feet;
thence southwesterly approximately 110 feet; thence west approximately 140 feet;
thence south approximately 890 feet; where a manhole will be constructed which will
be the terminus of Lateral DH -2$, the amount levied, apportioned and assessed against
the lots and pieces of ground in said district are found and determined to be as
I
follows:
LIKINS-FOSTER ADDITION
i
Block 1
Lott ----164.98
Lot 2 - - - - 149.98
i
Lot 3----164.98
Lot 4----164.98
i
Lot 5 - - - - 149.98
i
Lot 6----164.98
Lot 7 - - - - 149.98
i
Lot 8 - - - - 164.98
Lot 9 - - - - 164.98
Lot 10- - - - 149.98
Lot 11- - - - 164.98
Lot 12- - - - 164.98
Lot 13- - - - 149.98
Lot 14- - - - 149.98
Lot 15- - - - 149.98
i
Lot 16- - - - 149.98
Lot 17- - - - 149.98
Lot 18- - - - 149.98
Lot 19- - - - 149.98
Lot 20- - - - 149.98
Lot%21- - - - 164.98
Lot 22- - - - 164.98
Lot 23----1800
•1
Lot 24- - - - 180.01
Lot 25- - - - 189.01
Block
Lott- - 164,98
Lot 2 - - - - 149.98
Lot 3 - - - - 149.98
Lot 4 - - - - 149.98
Lots ----149.98
B3
Lot 2 - - - - 171.93
Lot 3 - - - - 171,93
Lot 4 - - - - 171.93
Lots ----191,04
Block
Lott ----210.14
Lot 2 - - - - 191.04
Block 2
Lot 6---_ 149.98
Lot 7 - - - - 164.98
Lot 8 - - - - 164.98
Lot 9 - - - - 149.98
Lot 10- - - - 149.98
Lot ].1- - - - 149.98
Lot 12- 149,98
i
Lot 13- - - - 164,98
j
Lot 14- - - - 164,98
I
i
Lot 15- - _ - 164,98
Lot 16- 149.98
Lot 17 - -- 149.98
Lot 18- - - - 149.98
Lot 19- - - - 164.98
Lot 20- - - - 164.98
Lot 21- - - - 149.98
Lot 22----149.98
Lot 23- - - - 149.98
Lot 24- - - - 149.98
Lot 25- - - - 149,98
i Lot 26- - - - 164,98
Block 3
Lot 1 - - - - 135.01
Total 8,168,08
Section 30. That for the purpose/ of the payment of the cost of construction of
Lateral Sanitary Sewer Number DH -29, an eight inch clay pipe sewer begirming in
a manhole to be constructed in Osage Avenue midway between Republic Avenue and
Arapohoe Avenue and running southeasterly approximately 250 feet; thence south-
westerly approximately 150 febt; thence west approximately 1,085 feet, where a
manhole will be constructed which will be the terminus of LateralDH-29, the
amount levied, apportioned and assessed against the lots and pieces of ground in
said district are found and determined to be as follows:
LIKINS-FOSTER ADDITION
B3
Lot 2 - - - - 171.93
Lot 3 - - - - 171,93
Lot 4 - - - - 171.93
Lots ----191,04
Block
Lott ----210.14
Lot 2 - - - - 191.04
Block
Lots ----103.10
Lot 6 - - -
_ 103.10
Lot 7- - -
- 103.10
Lot 8 - - -
- 113.42
Lot 9----103.10
Lot 10- - -
- 103.10
Lot 11- - -
- 103.10
Lot 12 - - -
- 113.42
Lot 13- - -
- 103.10
Lot 14- - -
- 103.10
Lot 15----103.1.0
Lot 16- - -
- 713.42
Lot 17- - -
- 103.10
Lot 18- - _
-113.42
Lot 19 - -
- - 103.10
Lot 20- - -
- 103.10
Lot 21- - -
- 123.74
Lot 22- - -
- 123.74
j
Lot 23- - -
- 113.42
Lot 24- - -
- 123.74
Lot 25- - -
- 111.35
Lot 26- - -
- 113.42
Lot 27- - -
- 103.10
Lot 28----1.3.42
Lot 29- - -
- 103.10
Lot 30- - -
_ 103.10
Lot 31- - -
- 103.10
i
Lot 32- - -
- 13.42
Lot 33- - -
- 103.10
Lot 34- _ _
_ 103.10
Lot 35- - -
- 103.10
I
Lot 36 : -
- 113.42
Lot 37- - -
- 103.10
Lot 38- - -
- 103.10
Lot 39- - -
- 103.14
Lot hD- - -
-113.42
Lot 41- - -
- 103.10
Lot 42-x- -
- 103.10
Lot 43- - -
- 3-13.42
Total
5,122.29
17
U
1
Block 4
Lot 3----191.04
Block 3
Lot 4----
•3.4
Lot 5 -
i
- _ _ 191.04
I
Lot 6 -
- _ - 191.04
I
j Lot 7 -
I
- - - 210.1.
Lot 8 -
- - - 191.04
Lot 9----191.04
9 - - - -
i
Lot 10-
- - - 210,14
Lot 11-
- - - 191.04
Lot 12-
- - - 191.04
Lot 13-
- - - 210.14
Lot 14----191.04
I
Lot 15-
- - - 191.04
Lot 16-
- - - 191.04
j Lot 17-
- - - 191.0.
I
j Lot 18-
- - - 191.04
Lot 19-
i
- _ _ 191.04
Lot 20-
i
- - - 210.14
Lot 21-
- - - 210.14
Lot 22-
- - - 229.22
5,081.50
Section 31. That for the purpose of the payment of the cost of cola truction
of Lateral Sanitary Sewer DH -30, an
eight inch clay pipe sewer beginning in a
manhole to be constructed in Osage Avenue midway between Arapohoe Avenue and Cheyenne
Avenue and running southeasterly approximately 285 feet; thence southwesterly
approximately 195 feet; thence west
approximately 1,125 feet, inhere a manhole will
be constructed which will be the terminus of Lateaal DH -30, the amount levied,
apportioned and assessed against the
lots and pieces of ground in said district
are found and determined to be as follows:
LIKINS-FOSTER ADDITION
Block 3
Lot
6----103.10
Lot
7 - - - -
92.82
Lot
8 - - - -
92.82
Lot
9 - - - -
92.82
Lot
10----103.10
Block
Lott
----113,42
Lot
2 - - - -
103.10
Lot
3 - - - -
103.10
Lot
4 - - - -
113.42
1
1
oecti.on 32. that for the purposeof the payment of the cost of construction
of Lateral Sanitary Sewer DH -31, an eight inch clay pipe sewer, beginning in
a manhole to be constructed in Os)k ge Avenue midway between Cheyenne Avenue and
Kiowa Avenue and running southeasterly approximately 285 feet thence southwesterly
i
approximately 195 feet; thence west approximately 1,270 feet, where a manhole will
be constructed which will be the terminus of Lateral DH -31, the amount levied,
i
apportioned and assessed against the lots and pieces of ground in said district
are found and determined to be as follows:
LIKINS-FOSTER ADDITION
i
Block 3
i
Lot 11- - - - 112.21
� Lot 12- - - - 100.99
Lot 13- - - - 89.77
Lot 14- - - - 89.77
i
Block 6
Lot 26- - - - 121.15
Lot 27- - - - 123.43
Lot 28- - - - 112.21
i
Lot 29- - - - 112.21
Lot 30- - - - 112.21
Lot 31- - - - 123.43
Lot 32- - - - 123.43
Lot 33- - - - 112.21
Lot 34--_-112.21
Lot 35 - - - - 112.21
Lot 36- - - - 123.43
Lot 37- - - - 112.21
Lot 38- - - - 123.43
Lot 39 - - - - 112.21
j Lot 40- - - - 112.21
Lot 41- - - - 112.21
Lot 42- - - - 123.43
Lot 43- _ _ _ 112.21
Lot 44- - - - 112.21
Lot 45 - - 123.43
Lot 46- - - - 123.43
Lot 1 - - - - 123.43
Lot 2- - - - 123.43
Lot 3 - - - _ 112.21
Lot 4- - - - 112.21
Lot 5 - - - - 123.43
Lot ----112.21
1
I: . Z
Lot 7 - - - - 112.21
Lot 8 - - - - 112.21
I
Lot 9 - - - - 123.43
Lot 10- _ _ _ 112.21
j Lot 11- - - - 123.43
Lot 12- - - - 112.21
Lot 13- - - - ]].2.21
Lot 14- - - - 112.21
Lot 15- - - _ 123.43
Lot 16- - - - 123.43
Lot 17- - - - 112.21
Lot 18- - - - 112.21
Lot 19- - - - 112.21
Lot 20- - - - 123.43
Lot 21- - - - 112.21
Lot 22- - - - 112.21
Lot 23- - - - 134.62
Lot 24- - - - 168.28
Lot 25- - - - 123.43
Total- 5,832.56
Section 33. That for the purpose of the payment of the cost of construction
of Lateral Sanitary Sewer DH -32, an eight inch clay pipe sewer, beginning in a
manhole to be constructed in Osage Avenue, approximately 140 feet southeast of
the intersection of Osage Avenue and Kiowa Avenue; thence running southeasterly
approximately 365 feet; thence west approximately 1,660 feet, where a manhole
will be constructed which will be the terminus of Lateral DH -32, the amount levied,
apportioned and assessed against the lots and pieces of ground in said district
are found and determined to be as follows:
LIKINS-FOSTER ADDITION
Block 3
Lot 15- - - - 198.07
Lot 16- - - - 206.31
Lot 17- - - - 206.31
Block 7
Lot 1 - - - - 226.94
Lot 2 - - - - 206.31
Lot 3----206.31
Lot 4 - - - - 206.31
Lot 5 - - - - 206.31
Lot 6 - - - - 206.31
Lot 7 - - - - 206.31
Block 7
Lot 8 - - - - 206.31
Lot 9 - - - - 206.31
Lot 10- - - - 206.31
Lot 11- - - - 206.31
Lot 12- - - - 206.31
Lot 13- - - - 206.31
Lot 14- - - - 206.31
Lot 15- - - - 206.31
i
Lot 16----206.31
Lot 17- - - - 206.31
i
Lot 18----206.31
Lot 19- - - - 206.31
Lot 20- - - - 206.3.
Lot 21- - - - 206.31
Lot 22- - - - 206.31
Lot 23- - - - 206.31
Lot 24- - - -206.31
Lot 25- - - - 206.31
Lot 26- - - - 206.31
Lot 27- - - - 206.31
Lot 28- - - 206.31
Total- 6,408.00
Section 34. Said amounts levied, apportioned and assessed as aforesaid shall
be due and coll.ectiUs in ten equal installments, the first becoming due with the
taxes levied for theyear 1953, and one of said installments falling due on each
and every year thereafter until all are paid, all to be collected with interest
as in this ordinance provided, provided however, that the owner of any property
liable for any such assessment may redeem his property from such liability by
paying into the City Treasury the entire amount chargeable against the same as in
j
this ordinance provided and designated, at any time within thirty days after the
publication of this ordinance, and before the issuance of the bonds of said city
in payment of the cost of said improvements, and his property so paid on shall
not thereafter be liable for any further assessment for the cost of said improvement
nor for any part of said bonds.
i
Section 35. There is hereby levied and assessed against such lots and pieces
of ground described in this ordinance interest at such rate per annum as shall be
borne by the bonds hereafter to be issued for the payment of the remaining unpaid
cost of such improvements, such rate to be hereafter determined and fixed by
ordinance when such bonds are issued, on all of said installments mentioned and
provided for in this ordinance, from the date of the bonds which may be issued at
the end of thirty days as specified in the preceding section hereof as by law
provided, to the time of collection of the last installment as provided by law,
i
which said interest shall be collected annually at the same time and in the same
i
manner as said installments are collected, and after the taking effect of this j
j ordinance and the fixing of the interest rate when such bonds are authorized and
issued, it shill be the duty of the City Clerk of said city to annually at the
same time other taxes are certified, and until all of said installments so
apportioned and levied herein have been certified, to certify to the County Clerk
of Saline County, Kansas, a full list of all property liable to assessment and
i
taxation for such work and improvements, except such property on which the speciX1
assessment aforesaid have been paid in full as hereinhefore provided, together with
the respective amounts due on each of such lots and pieces of ground, which amounts
shall include the annual installments of such special assessments together with
the interest for one year at the rate to be fixed and provided for in this ordianence,
being the rate borne by the bonds to be issued on all unpaid balances of such
i
assessments, and such amounts so certified as herein provided shall be placed upon
i
the tax roll by the County Clerk of Saline County, Kansas, and collected as all other
taxes are collected.
Section 36. This ordinance shall take effect and be in force from and after
its publication once in the official city paper.
Introduced: February 2, 1953
Passed: February 23, 1953
Mayor
Attest:
City -Clerk