00-9977 Corrected Levy Specials(Published in The Salina Journal May 18, 2000)
� S.S.W
ORDINANCE NUMBER 00-9977
AN ORDINANCE LEVYING SPECIAL ASSESSMENTS ON LOTS, PIECES AND
PARCELS OF GROUND IN THE CITY OF SALINA, KANSAS FOR THE PURPOSE OF
PAYING A PORTION OF THE COST OF
PROJECT NO. 98-1139
RIFFEL ADDITION
Curbing, guttering, paving, grading and drainage of:
Riffel Drive from South Ninth Street to a point 118 feet south of the south
line of Lot 3, Block 1
Installation of a sanitary sewer main
Installation of a water main system
PROJECT NO. 98-1139
EASTVIEW ESTATES ADDITION
Curbing, guttering, paving, grading and drainage of:
Sierra Drive from Magnolia Road to the east line of Lot 3, Block 1, to serve
Lots 1 through 3, Block 1
Blakemoore Drive from Lakeview Drive to the north line of Lot 10, Block
6, to serve Lot, 11 Block 5 and Lot 10, Block 6
Lakeview Drive from Ambassador Drive to the east property line of Lot 16,
Block 7, to serve Lots 16 through 21, Block 7
Ambassador Drive to serve Lots 11 through 20, Block 6 and Lots 22 through
32, Block 7, Eastview Estates Addition.
Installation of a sanitary sewer main
Installation of a water main
PROJECT NO. 98-1150
SIDEWALK IMPROVEMENTS
EAST AND WEST CRAWFORD STREET
Installation of public concrete sidewalks on the north side of Crawford Street
from Marymount Road to Fairdale Road
WEST SIDE SOUTH OHIO STREET
Installation of public concrete sidewalks on the west side of Ohio Street from
Prescott Avenue to Edison Place.
EAST SIDE SOUTH OHIO STREET
Installation of public concrete sidewalks on the east side of Ohio Street from
Cloud Street to Albert Avenue
ConWi0ere W'.
SOUTH NINTH STREET
Installation of public concrete sidewalks on the east side of Ninth Street from
Otto Avenue to Saturn Avenue
PACIFIC AVENUE
Installation of public concrete sidewalks on the south side of Pacific Avenue
from Second Street to Ninth Street
PROJECT NO. 99-1157
REPLAT OF PRESBYTERIAN MANOR INC., SUBDIVISION
Improvement of the drainage channel along the west property line of Lot 1,
Block 1, commencing at Crawford Street and terminating in the Presbyterian
Manor Pond
PROJECT NO. 99-1175
SCHILLING ROAD AT MARCELLA DRIVE AND VIRGINIA
DRIVE
Installation of a traffic signal system at the intersection of Schilling Road
with Virginia Drive and Marcella Drive, in the City of Salina
PROJECT NO. 99-1180
GOLDEN EAGLE ESTATES ADDITION PHASE III
The curbing, guttering, paving, grading and drainage of:
Redhawk Lane from Eaglecrest Avenue to the northwest property line of Lot
11, Block 4
A'Marie Court to serve Lots 5 through 8, Block 3, Golden Eagle Estates
Addition No. 2
Eaglecrest Avenue from the east property line of Lot 1, Block 4, Golden
Eagle Estates Addition No. 2 to a point 36 feet west of the east property line
of Lot 10, Block 1
Sherwood Lane from Redhawk Lane to the southwest property line of Lot 9,
Block 4, Golden Eagle Estates Addition
Installation of a water main
Installation of a sanitary sewer main
RIVER TRAIL ADDITION PHASE I
The curbing, guttering, paving and grading of:
Aidan Court to serve Lots 35 through 39, Block 4
River Trail Road from Magnolia Road to the north property line of Lot 4,
Block 2
Eaglecrest Avenue from the west property line of Lot 6, Block 1 to the east
property line of Lot 33, Block 4, River Trail Addition.
Installation of a drainage system
Installation of a sanitary sewer main
Installation of a water
PROJECT NO. 99-1192
FRANK INDUSTRIAL AREA ADDITION
Curbing, guttering, paving, grading and drainage of:
Sunflower Lane to serve Lots 1 through 4
Installation of a sanitary sewer main system
Installation of a water main system
Project No. 98-1139
RIFFEL ADDITION
Block 01
28467 Lot 4 ...............................................
28468 Lot 5 ...............................................
28469 Lot 6 ...............................................
28470 Lot 7 ...............................................
Block 02
28462 Lot 4 ...............................................
28463 Lot 5 LT 5 BLK 2 & VAC NINTH ST ADJ TO PROPERTY .....
EASTVIEW ESTATES ADDITION
Block 001
19,021.13
37,988.54
35,476.72
54,790.55
18,625.87
35,251.35
28689
Lot
1 ...............................................
12,194.46
28690
Lot
2 ...............................................
12,194.46
28692
Lot
4 ...............................................
3,221.89
28693
Lot
5 ...............................................
3,221.89
28694
Lot
6 ...............................................
3,221.90
28695
Lot
7 ...............................................
3,221.90
28696
Lot
8 ...............................................
1,373.02
28691
Lot
PT LT 3 BLK 1 DAF BEG NW COR LT 3 TH E 44.96 S
Lot
16 ..............................................
28740
145 W 48 N 145.02 TO POB ........................
12,194.46
Block 005
28766
Lot
11 ..............................................
28765
Lot
12 ..............................................
28764
Lot
13 ..............................................
28763
Lot
14 ..............................................
28762
Lot
15 ..............................................
Block 006
28751
Lot
6 ...............................................
28750
Lot
7 ...............................................
28749
Lot
8 ...............................................
28748
Lot
9 ...............................................
28747
Lot
10 ..............................................
28746
Lot
11 ..............................................
28745
Lot
12 ..............................................
28744
Lot
13 ..............................................
28743
Lot
14 ..............................................
28742
Lot
15 ..............................................
28741
Lot
16 ..............................................
28740
Lot
17 ..............................................
15,180.44
3,419.97
3,419.97
3,419.97
3,419.97
3,419.96
3,419.96
3,419.96
3,419.96
15,180.46
13,973.74
13,973.74
13,973.74
13,973.74
13,973.74
13,775.66
13,775.65
ConwltlerebLllre
28739 Lot 18 .............................................. 13,775.65
28738 Lot 19 .............................................. 13,775.65
28737 Lot 20 .............................................. 13,775.65
Block 007
28720
Lot
16
..............................................
11,019.53
28719
Lot
17
..............................................
12,392.55
28718
Lot
18
..............................................
12,392.55
28717
Lot
19
..............................................
12,392.55
28716
Lot
20
..............................................
12,392.55
28713
Lot
23
..............................................
13,775.66
28712
Lot
24
..............................................
13,775.67
28711
Lot
25
..............................................
13,775.68
28710
Lot
26
..............................................
13,775.68
28709
Lot
27
..............................................
13,775.68
28708
Lot
28
..............................................
13,775.68
28707
Lot
29
..............................................
13,775.68
28706
Lot
30
..............................................
13,775.68
28705
Lot
31
..............................................
13,775.68
28704
Lot
32
..............................................
13,775.68
28714
Lot
PT
LT 22 ELK 7 LESS TR BEG SW COR SD LT TH N 79.6
5 NE
107 SW 140.74 TO POB ...........................
13,775.66
28715
Lot
21
LT 21 & PT 22 BEG SW COR LT 22 N 79.65 NE 107
SW 140.74
TO POB .....................................
12,392.54
** TOTAL **
$672,980.42
Project No. 98-1150
GEORGETOWN ADDITION
Block 005
28526 ELK 5 LESS N 120 GEORGETOWN ADD ..................... 1,228.15
WILBUR PDD
Block 002
16878 Lot PT TR 6 OF LT 7 . ............................... 1,223.49
16880 Lot PT TR 7 OF LOT 7 ................................ 2,219.76
GARDEN HOME ADD
Block 002
06088 Lot 1 ............................................... 577.38
RIVERDALE ADD RPTBILS W75
Block 001
06071 Lot 6 ............................................... 724.37
27146 Lot 7 ............................................... 639.25
SURVEYOR'S PLAT 52 REPLAT
Block 001
06069 N 1/2 OF LOTS 9 & 10 IN REPLAT LT 3 & E 70 LT 4 &
PART OF LT 2 ........................................ 937.20
27078 S 145.83 LTS 9 & 10 ................................. 937.20
PARKWOOD VILLAGE (REPLAT)
Block 001
18859 S 60 S 110 LT 1 ...................................... 463.63
22729 N 131 LT 2 ........................................ 1,013.37
08859A
Lot
PT
N 50
S 110
LT 1 ............................
386.48
18858
Lot
PT
N 75'
LOT 1
................................
579.83
18860
Lot
PT
N 40
S 144
LOT 2 ...........................
309.33
18861
Lot
PT
S 104
LOT 2
.................................
804.70
SW COR
TH N .........................................
30,479.07
Block 006
** TOTAL **
18866
Lot
PT
N 75
LOT 1
...................................
579.76
18867
Lot
PT
S 70
N 145
LT 1 ..............................
541.59
18868
Lot
PT
N 115
S 285
LT 1 .............................
889.97
18869
Lot
PT
N 115
S 170
LT 1 .............................
889.97
18870
Lot
PT
W 100
S 55
LOT 1 .............................
425.46
Block 007
18872
BLK
7 ...............................................
1,236.73
PACIFIC
Block 007
03664
Lot
2 ...............................................
772.69
WOODLAND ADD
Block 004
03624
Lot
2 4
LTS
2 4 6&
8 ................................
857.68
03625
Lot
1 3
LOTS
1 3 5
7& 9 ............................
778.56
Block 005
03611
Lot
1 ...............................................
847.26
MEADOWLARK AC #3 REPL PT PDD
Block 001
12889
Lot
1 ...............................................
8,102.15
MEADOWLARK ACRES #3
Block 005
12883
Lot 1 &
L 1 & 2 ......................................
484.27
** TOTAL **
$28,450.23
Project No. 99-1157
SAL PRESBYTERIAN MANOR/SUB RPT
Block 001
16882
PT LT 1
LESS TR BEG 50 N & 230 E OF SW COR TH N 395 E 360
S 395 W
360 TO POB & TR BEG 50 N & 658.73 E OF
SW COR
TH N .........................................
30,479.07
** TOTAL **
$30,479.07
Project No. 99-1175
COUNTRY OAK ESTATES
Block 005
26470
Lot 17
..............................................
5,356.31
26471
Lot 18
..............................................
5,033.64
26467
Lot 14
..............................................
5,973.04
CamoYmiea Sahm
COUNTRY OAKS RP PT BLK 1,3,4
Block 001
26523 Lot 1 ............................................... 7,549.33
26524 Lot 2 ............................................... 5,862.54
26525 Lot 3 ............................................... 16,825.19
** TOTAL ** $46,600.05
Project No. 99-1180
Golden Eagle Estates No. 2
Block 001
Lot
10
...............................................
3,979.14
Lot
11
...............................................
16,535.41
Block 003
Lot2
...............................................
13,552.55
Lot3
...............................................
13,552.55
Lot4
...............................................
13,552.55
Lot
5
...............................................
16,535.41
Lot
6
...............................................
16,535.41
Lot7
...............................................
16,535.41
Lot
8
...............................................
16,535.41
Block 004
Lot1
...............................................
16,535.41
Lot
2
...............................................
16,535.41
Lot3
...............................................
16,535.41
Lot
4
...............................................
16,535.41
Lot
5
...............................................
16,535.41
Lot
6
...............................................
16,535.41
Lot
7
...............................................
16,535.41
Lot
8
...............................................
16,535.41
Lot9
...............................................
16,535.41
Lot
10
...............................................
16,535.41
Lot
11
...............................................
16,535.41
Golden Eagle Estates Addition
Block 004
Lot 9 ............................................... 11,267.93
Lot 10 ............................................... 16,535.40
Lot 11 ............................................... 16,535.40
Block 007
Lot 2 ............................................... 11,267.93
Lot 3 ............................................... 16,535.40
Lot4 ............................................... 16,535.40
River Trail Addition
Block 001
Lot1 ............................................... 16,572.73
Lot 2 ............................................... 16,572.73
Lot 3 ............................................... 16,572.73
Lot 4 ............................................... 16,572.73
Lot 5 ............................................... 16,572.73
Lot6 ............................................... 16,572.73
Block 002
Lot1
...............................................
16,572.73
Lot
2
...............................................
16,572.73
Lot
3
...............................................
16,572.73
Lot
4
...............................................
16,572.73
Lot
5
...............................................
2,322.97
Lot6
...............................................
2,322.97
Lot
7
...............................................
2,322.97
Lot8
...............................................
2,322.97
Lot
9
...............................................
2,322.97
Lot
10
...............................................
1,527.33
Lot11
27
...............................................
731.69
Lot
28
Block 004
731.69
Lot17
...............................................
731.69
Lot18
...............................................
731.69
Lot19
...............................................
731.69
Lot20
...............................................
731.69
Lot21
...............................................
731.69
Lot22
...............................................
731.69
Lot23
...............................................
731.69
Lot24
...............................................
731.69
Lot
25
...............................................
731.69
Lot
26
...............................................
731.69
Lot
27
...............................................
731.69
Lot
28
...............................................
731.69
Lot
29
...............................................
2,567.39
Lot
30
...............................................
4,403.31
Lot31
...............................................
4,403.31
Lot32
...............................................
4,403.31
Lot33
...............................................
16,572.73
Lot
34
...............................................
16,572.73
Lot
35
...............................................
16,572.73
Lot36
...............................................
16,572.72
Lot
37
...............................................
16,572.72
Lot
38
...............................................
16,572.72
Lot
39
...............................................
16,572.72
Block 006
Lot5
...............................................
731.70
Lot6
...............................................
731.70
Block 007
Lot
1
...............................................
16,572.72
Lot
2
...............................................
16,572.72
Lot
3
...............................................
16,572.72
Lot
4
...............................................
16,572.72
Lot
5
...............................................
731.70
.w um
Lot6
1
...............................................
731.70
Lot7
10
...............................................
731.70
Lot8
11
...............................................
731.70
Lot9
5 ...............................................
...............................................
731.70
Lot10
2
...............................................
731.70
Lot
21
...............................................
731.70
Lot22
4
...............................................
731.70
Lot
23
...............................................
731.70
Lot24
6
...............................................
731.70
Lot25
7
...............................................
731.70
Lot26
8
...............................................
731.70
Lot
27
...............................................
731.70
Lot28
...............................................
731.70
Lot29
...............................................
731.70
Lot
30
...............................................
731.70
Lot31
...............................................
731.70
Lot32
...............................................
731.70
Lot33
...............................................
731.70
Lot
34
...............................................
731.70
Lot35
...............................................
2,567.51
Lot
36
...............................................
4,403.32
Golden Eagle Estates Addition No. 2
Block 001
Lot
1
...............................................
20,996.56
Lot
10
...............................................
1,218.46
Lot
11
...............................................
1,218.46
Lot
5 ...............................................
Block 003
Lot6
Lot
2
...............................................
1,218.46
Lot3
Lot
...............................................
1,218.46
Lot
4
...............................................
1,218.46
Lot
5
...............................................
1,218.46
Lot
6
...............................................
1,218.46
Lot
7
...............................................
1,218.46
Lot
8
...............................................
1,218.46
Block 004
Lot
1 ...............................................
1,218.46
Lot
2 ...............................................
1,218.47
Lot
3 ...............................................
1,218.47
Lot
4 ...............................................
1,218.47
Lot
5 ...............................................
1,218.47
Lot6
...............................................
1,218.47
Lot7
...............................................
1,218.47
Lot
8 ...............................................
1,218.47
Lot
9 ...............................................
1,218.47
Lot
10 ...............................................
1,218.47
Lot
11 ...............................................
1,218.47
C. -W" SO
Golden Eagle Estates Addition
Block 004
Lot9
...............................................
1,218.47
Lot10
Lot
...............................................
1,218.47
Lot11
Lot
...............................................
1,218.47
28962
Lot
Block 007
34,690.15
Lot
2
...............................................
1,218.47
Lot
3
...............................................
1,218.47
Lot
4
...............................................
1,218.47
** TOTAL ** $860,084.36
Project No. 99-1192
Frank Industrial Area Addition
** Grand Total ** $1,831,270.78
Section 2. Said amounts so levied, apportioned and assessed as aforesaid will be due and
collectible in fifteen equal installments, the first becoming due with the taxes levied for the year 2000,
and one of said installments falling due each and every year thereafter until all are paid and all to be
collected with interest as in this ordinance provided; HOWEVER, that the owner of any piece or parcel
of property liable for any such assessments may redeem his property, in whole or in part, from such
liability by paying to the City Treasurer the entire amount, or a portion thereof, chargeable against the
same, as in this ordinance provided, at any time within thirty days after the publication of this ordinance
and before the issuance of bonds of said City in payment of the balance of the cost of said
improvements, and to the extent of any such payment, the property so paid on shall not thereafter be
liable for any further assessments for the cost of said improvements, nor for any part of said bonds.
Section 3. There is hereby levied further and assessed against such lots and pieces of
ground described in this ordinance, interest at such rate per annum as shall be borne by bonds
hereinafter to be issued for the payment of the remaining unpaid cost of such improvements to be
hereafter determined and fixed by ordinance.
Interest on these tracts shall begin to accrue in accordance with Section 3 above.
Section 4. That this ordinance shall be in full force and effect from and after its adoption
and publication once in the official city newspaper.
(SEAL)
ATTEST:
e�a
- ara R. Weber, Acting City Clerk
Introduced: May 8, 2000
Passed: May 15, 2000
OL"'n
Alan E. Jilka, ayor
Block 001
28963
Lot
1 ...............................................
35,010.57
28964
Lot
2 ...............................................
35,010.56
28962
Lot
3 ...............................................
34,690.15
28965
Lot
4 ...............................................
34,168.14
28961
Lot
5 ...............................................
17,932.41
28966
Lot
6 ...............................................
17,932.41
28960
Lot
7 ...............................................
17,932.41
** TOTAL **
$192,676.65
** Grand Total ** $1,831,270.78
Section 2. Said amounts so levied, apportioned and assessed as aforesaid will be due and
collectible in fifteen equal installments, the first becoming due with the taxes levied for the year 2000,
and one of said installments falling due each and every year thereafter until all are paid and all to be
collected with interest as in this ordinance provided; HOWEVER, that the owner of any piece or parcel
of property liable for any such assessments may redeem his property, in whole or in part, from such
liability by paying to the City Treasurer the entire amount, or a portion thereof, chargeable against the
same, as in this ordinance provided, at any time within thirty days after the publication of this ordinance
and before the issuance of bonds of said City in payment of the balance of the cost of said
improvements, and to the extent of any such payment, the property so paid on shall not thereafter be
liable for any further assessments for the cost of said improvements, nor for any part of said bonds.
Section 3. There is hereby levied further and assessed against such lots and pieces of
ground described in this ordinance, interest at such rate per annum as shall be borne by bonds
hereinafter to be issued for the payment of the remaining unpaid cost of such improvements to be
hereafter determined and fixed by ordinance.
Interest on these tracts shall begin to accrue in accordance with Section 3 above.
Section 4. That this ordinance shall be in full force and effect from and after its adoption
and publication once in the official city newspaper.
(SEAL)
ATTEST:
e�a
- ara R. Weber, Acting City Clerk
Introduced: May 8, 2000
Passed: May 15, 2000
OL"'n
Alan E. Jilka, ayor