Loading...
96-9722 Levy Subdiv Asses(Published in The Salina Journal March ! , 1996) ORDINANCE NUMBER 96-9722 AN ORDINANCE LEVYING SPECIAL ASSESSMENTS ON LOTS, PIECES PARCELS OF GROUND IN THE CITY OF SALINA, KANSAS FOR THE )SE OF PAYING A PORTION OF THE COST OF PROJECT NO. 94-907 HOLIDAY RESORT ADDITION Curbing, guttering, paving and grading of DEBORAH DRIVE from the west line of Lot 1, Block 4 to Eastmoor Drive to serve Lots 1 and 2, Block 4 and Lots 7 through 12, Block 3, Holiday Resort Addition. Curbing, guttering, paving and grading of EASTMOOR DRIVE from Deborah Drive to Country Club Road to serve Lots 1 through 8, Block 1; Lots 1 and 2, Block 2; Lots 1 through 12, Block 3; and Lots 1, 2 and 3, Block 4, Holiday Resort Addition. Curbing, guttering, paving and grading of ARGONNE DRIVE from the west line of Lot 2, Block 2 to the east cul-de-sac to serve Lots 1 through 8, Block 1; Lots 1 and 2, Block 2; and Lots 1 through 6. Block 3. Holidav Resort Addition. Lateral sanitary sewer to serve Lots 1 through 8, Block 1; Lots 1 and 2, Block 2; and Lots 1, 2 and 3, Block 4, Holiday Resort Addition. The installation of a water main and service to serve Lots 1 through 8, Block 1; Lots 1 and 2, Block 2; Lots 1 through 12, Block 3; and Lots 1, 2 and 3, Block 4, Holiday Resort Addition. NORD SUBDIVISION AND WALLERIUS ADDITION NO. 2 Curbing, guttering, paving and grading of HAGEMAN AVENUE from the south line of the vacated Moon Drive to the south line of the vacated Sun Drive to serve Lot 1, Block 2, and the vacated Sun Drive, Nord Subdivision; part of Lots 7 and 8, Block 1, Wallerius Addition No. 2. TWIN OAKS SUBDIVISION, TWIN OAKS II SUBDIVISION, TWIN OAKS III SUBDIVISION AND JERRY IVEY PARK Curbing, guttering, paving and grading of CAROLINA DRIVE from Burr Oak Lane to Edward Street to serve Lots 7, 8 and 9, Block 9, Twin Oaks Subdivision; Lots 23 through 33, Block 2 and Lots 4, 5 and 6, Block 4 and Lots 1 through 4, 9 through 12, Block 7, Twin Oaks II Subdivision; Lots 3 and 10, Block 4 and Lots 18 through 22, Block 5, Twin Oaks III Subdivision; Jerry Ivey Park. Curbing, guttering, paving and grading of OAK LANE from Carolina Drive to Tara Lane to serve Lots 5 through 8, Block 4 and Lots 1 through 4, Block 7, Twin Oaks II Subdivision. Curbing, guttering, paving and grading of TARA LANE from Oak Lane to Twin Oaks Drive to serve Lots 7, 8 and 9, Block 4 and Lots 1, 2 and 3, Block 5, Twin Oaks II Subdivision; Lot 10, Block 4 and Lots 4, 5 and 6, Block 5, Twin Oaks III Subdivision. Curbing, guttering, paving and grading of TWIN OAKS DRIVE from Carolina Drive to Tara Lane to serve Lots 4 and 9, Block 4, Twin Oaks I1 Subdivision; Lots 3 and 10, Block 4 and Lots 18 through 22, Block 5, Twin Oaks III Subdivision. Installation of a sanitary sewer main to serve Lots 25 through 33, Block 2 and Lots 4 through 9, Block 4 and Lots 1, 2 and Conwlbat[d5alina 3, Block 5, Twin Oaks II Subdivision; Lots 3 and 10, Block 4 and Lots 4, 18 through 22, Block 5, Twin Oaks III Subdivision. Installation of a water main and service to serve Lots 23 through 33, Block 2 and Lots 4 through 9, Block 4 and Lots 1, 2 and 3, Block 5 and Lots 1 through 4, Block 7, Twin Oaks II Subdivision; Lots 3 and 10, Block 4 and Lots 4, 18 through 22, Block 5, Twin Oaks III Subdivision. All in the City of Salina, Saline County, Kansas. and such contracts have been duly performed, and WHEREAS, the Board of Commissioners has determined that the total cost of such improvements is Nine Hundred Ten Thousand Five Hundred Fifty-nine and 23/100 Dollars ($910,559.23) and that 70.362 percent in the amount of Six Hundred Forty Thousand Four Hundred Fifty-two and 25/100 Dollars ($640,452.25) be assessed against the improvement district and that 29.6638 percent in the amount of Two Hundred Seventy Thousand One Hundred Six and 98/100 Dollars ($270,106.98) be assessed against the City -at -large. WHEREAS, the Board of Commissioners has, after due notice, met and determined the amount of special assessments, SO NOW, THEREFORE, Kansas: BE IT ORDAINED by the Governing Body of the City of Salina, Section 1. That special assessments to pay the cost of such improvements, with accrued interest, be and the same are hereby levied against the several lots, pieces and parcels of land liable for special assessments for said improvements as follows: PROJECT NO. 94-907 HOLIDAY RESORT Block 001 27525 Lot 1 ............................................... 7,664.98 27525.A Lot 1 ............................................... 3,630.70 27524 Lot 2 ............................................... 7,664.98 27524.A Lot 2 ............................................... 3,630.70 15997 Lot 3 ............................................... 9,274.63 15997.A Lot 3 ............................................... 3,630.70 27530 Lot 4 ............................................... 10,884.28 27530.A Lot 4 ............................................... 3,630.70 27528 Lot 5 ............................................... 9,197.98 27528.A Lot 5 ............................................... 3,630.70 16001 Lot 6 ............................................... 7,664.98 16001.A Lot 6 ............................................... 3,630.70 27526 Lot 7 ............................................... 7,664.98 27526.A Lot 7 ............................................... 3,630.70 27531 Lot 8 ............................................... 27,603.10 27531.A Lot 8 ............................................... 3,630.64 Block 002 27533 Lot 1 ............................................... 6,131.98 27533.A Lot 1 ............................................... 3,630.70 27532 Lot 2 ............................................... 6,131.98 27532.A Lot 2 ................. ..... ...................... 3,630.70 Block 003 27545 Lot 1 ............................................... 6,898.48 27545.A Lot 1 ............................................... 3,630.70 27544 Lot 2 ............................................... 6,898.48 27544.A Lot 2 ............................................... 3,630.70 27543 Lot 3 ............................................... 6,515.23 27543.A Lot 3 ............................................... 3,630.70 27542 Lot 4 ............................................... 6,515.23 27542.A Lot 4 ............................................... 3,630.70 27541 Lot 5 ............................................... 6,898.48 27541.A Lot 5 ............................................... 3,630.70 27540 Lot 6 ............................................... 6,898.48 C�,.ddel� S*u 27540.A Lot 6 ............................................... 3,630.70 27539 Lot 7 ............................................... 6,350.58 27539.A Lot 7 ............................................... 3,630.70 27538 Lot 8 ............................................... 5,644.95 27538.A Lot 8 ............................................... 3,630.70 27537 Lot 9 ............................................... 5,644.95 27537.A Lot 9 ............................................... 3,630.70 27536 Lot 10 .............................................. 5,644.95 27536.A Lot 10 .............................................. 3,630.70 27535 Lot 11 .............................................. 5,997.77 27535.A Lot 11 .............................................. 3,630.70 27534 Lot 12 .............................................. 6,350.58 27534.A Lot 12 .............................................. 3,630.70 Block 004 27522 Lot 1 ............................................... 7,761.82 27522.A Lot 1 ............................................... 3,630.70 27523 . Lot 2 ............................................... 7,761.82 27523.A Lot 2 ............................................... 3,630.70 27527 Lot 3 ............................................... 19,243.00 27527.A Lot 3 ............................................... 3,630.70 NORD SUBDIVISION 14559 Lot 1 0 N 19.7 VAC ST ............................... Block 002 14558 14276 Lot 1 and vacated Sun Drive ......................... 8,764.30 Lot 3 ............................................... TWIN OAKS PHASE III Block 007 Block 004 14584 14546 Lot 3 ............................................... 9,545.93 14553 Lot 10 .............................................. 10,152.83 Lot 3 ............................................... Block 005 14581 27042 Lot 4 ............................................... 7,082.12 27043 Lot 5 ............................................... 3,290.42 27044 Lot 6 ............................................... 3,290.42 27056 Lot 18 .............................................. 91545.93 27057 Lot 19 .............................................. 9,545.93 27058 Lot 20 .............................................. 9,545.93 27059 Lot 21 .............................................. 9,545.93 27060 Lot 22 .............................................. 9,545.93 TWIN OAKS SUBDIVISION Block 009 14503 Lot PT NE 60 LT 7 & SW 40 LT 8 ...................... 3,229.30 14502 Lot 9 & NE 40' LOT 8 & LOT 9 ........................ 3,229.30 TWIN OAKS 2ND SUBDIVISION Block 002 14532 Lot 23 .............................................. 4,237.47 14533 Lot 24 .............................................. 4,237.47 14534 Lot 25 .............................................. 6,475.25 14535 Lot 26 .............................................. 6,475.25 14536 Lot 27 .............................................. 6,475.25 14537 Lot 28 .............................................. 6,475.25 14538 Lot 29 .............................................. 6,475.25 14539 Lot 30 .............................................. 6,475.25 14540 Lot 31 .............................................. 6,475.25 14541 Lot 32 .............................................. 6,475.25 14542 Lot 33 ............................................... 6,475.25 Block 004 14547 Lot 4 ............................................... 6,862.38 14548 Lot 5 ............................................... 6,416.00 14549 Lot 6 ............................................... 6,416.00 14550 Lot 7 ............................................... 9,706.42 14551 Lot 8 ............................................... 9,706.42 14552 Lot 9 ............................................... 10,152.80 Block 005 14559 Lot 1 0 N 19.7 VAC ST ............................... 7,082.12 14558 Lot 2 ............................................... 7,082.12 14557 Lot 3 ............................................... 7,082.12 Block 007 14584 Lot 1 ............................................... 6,861.77 14583 Lot 2 ............................................... 6,861.77 14582 Lot 3 ............................................... 6,861.77 14581 Lot 4 ............................................... 6,861.75 14588 Lot 9 ............................................... 2,683.55 C-11dated k1'18 14587 Lot 10 .............................................. 14586 Lot 11 .............................................. 14585 Lot 12 .............................................. WALLERIUS NUMBER 2 Block 001 14284.1 Lot N 1 ............................................. 14284 Lot S 1 ............................................. TOTAL PREPAID BY PETITIONER ** GRAND TOTAL ** 3,229.30 3,229.30 3,229.30 5,117.43 6,692.01 $586,876.90 53,275.35 $640,452.25 Section 2. Said amounts so levied, apportioned and assessed as aforesaid will be due and collectible in ten equal installments, the first becoming due with the taxes levied for the year 1996, and one of said installments falling due each and every year thereafter until all are paid and all to be collected with interest as in this ordinance provided; HOWEVER, that the owner of any piece or parcel of property liable for any such assessments may redeem his property, in whole or in part, from such liability by paying to the City Treasurer the entire amount, or a portion thereof, chargeable against the same, as in this ordinance provided, at any time within thirty days after the publication of this ordinance and before the issuance of bonds of said City in payment of the balance of the cost of said improvements, and to the extent of any such payment, the property so paid on shall not thereafter be liable for any further assessments for the cost of said improvements, nor for any part of said bonds. Section 3. There is hereby levied further and assessed against such lots and pieces of ground described in this ordinance, interest at such rate per annum as shall be borne by bonds hereinafter to be issued for the payment of the remaining unpaid cost of such improvements to be hereafter determined and fixed by ordinance. Section 4. That this ordinance shall be in full force and effect from and after its adoption and publication once in the official city newspaper. (SEAL) ATTEST: J0. D. ong, City 4,k Introduced: February 12, 1996 Passed: February 26, 1996 aAW John Divine, Mayor