Loading...
6054 Authorize Contract7,TF.__'s V S:1;ANr_ C iJ 1 ORDINANCE NUMBER 6051 (Published in the Salina Journal OPL 7 , 1956) AN ORDINANCE ratifying and confirming a contract with the H. J. Taylor Construction Company for the construction of certain curbing, guttering, paving and grading improvements on certain streets in the City of Salina, Kansas, and providing for the issuance of temporary notes to pay the cost thereof pending the issuance and sale of bonds. BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas: Section 1. That the acceptance by the City of Salina, Kansas, of the proposal of the H. J. Taylor Construction Company, hereinafter referred to as the `Contractor" as submitted to the Board of Commissioners on April 17, 1956, which is hereby found to be the lowest and best bid for such work, and the contract awarded by the Board of Commissioners of said city to said contractor and signed on behalf of the City by its Mayor on April 24, 1956, for the construction of certain public improvements in the City of Salina, Kansas, to -wit: Paving and grading of Delaware Avenue, (twenty-eight (28) feet wide toe of gutter to toe of gutter) with concrete from the south line of Iron Avenue to the south line of Stapler Avenue, as provided for by Resolution Number 1619 and Ordinance Number 6047. Paving and grading of Eleventh Street, (twenty-eight (28) feet wide toe of gutter to toe of gutter) with concrete from the north line of Lincoln Avenue to the South line of Grand Avenue, as provided for by Resolution Number 1636 and Ordinance Number 6047. Paving and grading of Haven Avenue, (twenty-eight (28) feet wide toe of gutter to toe of gutter) with concrete from the east line of Duvall Avenue to the west line of Steahlin Avenue, as provided for by Resolution Number 1627 and Ordinance Number 6047. Paving and grading of Johnstown Avenue, (twenty-eight (28) feet from toe of gutter to toe of gutter) with concrete, from the east line of Columbia Avenue to the east line of Kansas Avenue, as provided for by resolution Number 1600 and Ordinance Number 6047. Paving and Grading of Lincoln Avenue, (twenty-eight (28) feet wide from toe of gutter to toe of gutter) with concrete from the west line of Twelfth Street to the east line of Thirteenth Street as,p:^ovided for by Resolution Number 1615 and Ordinance Num�ier 7. Paving and grading of McAdams Road, (twenty-eight (28) feet wide from toe of gutter to toe of gutter) with concrete from the east line of Roach Street to the west line of Pearl Street, as provided for by Resolution Number 1610 and Ordinance Number 6047. Paving and grading of Roach Street, (twenty-eight (28) feet wide from toe of gutter to toe of gutter) with concrete, from the north line of Martin Avenue to the south line of Republic Avenue, as provided for by Resolution Number 1605 and Ordinance Number 6047. Curbing, Guttering, Paving and Grading of Second Street (thirty-three (33) feet back of curb to back of curb) with concrete, from the north line of Crawford Avenue to the south line of Prescott Avenue, as provided for by Resolution Number 1611 and Ordinance Number 6047. CONN -z.1 -1.77r; SnL_'NA 1 I Curbing, Guttering, Paving and Grading of Eighth Street I (thirty-three (33) feet back of curb to back of curb I with concrete, from the north line of Lincoln Avenue to the south line of Decatur Avenue 9 as provided by Resolu- tion Number 1612 and Ordinance Number 6047. Paving and Grading of Viemont Avenue (twenty-eight (38) feet wide from toe of gutter to toe of gutter) with con- crete from the south line of Haven Avenue to the south line of Beverly Drive, as provided for by Resolution Number 1618 and Ordinance Number 6047. j Curbing, Guttering and Grading of the south side of Haven Avenue from the center line of Duvall Avenue to the center line of Steahlin Avenue., as provided by Resolution Number 1628 and Ordinance Number 6047. at and for the unit price for said work contained in said proposal, which proposal and con- tractors hereby referred to and made parts of this ordinance, be and the same is hereby rati- fied and confirmed, said proposal being within the estimated cost of said improvements as shown by the sworn estimates of the City Engineer on file in the office of the City Clerk, which estimates are hereby referred to and made a part of this ordinance. Section 2, Said improvements shall be built and constructed in accordance with the (plans and specifications therefore prepared by the City Engineer on file in the office of the City Clerk and in accordance with the proposal of said contractor and under the terms of said contract, all of which are hereby referred to and made parts of this ordinance. Section 3. That temporary notes signed by the Mayor and attested by the City Clerk be issued from time to time as the work progresses in the manner and form as required by law, the total amount thereof not to exceed the amount of $92,977.50, for such work, such notes ,to bear interest not to exceed 42 per cent per annum, and to mature not later than December ,1, 1957, and to be issued in such amounts and at such time as money for the payment of the cost of such notes being issued to said contractor and to be redeemed and cancelled at the time that permanent bonds are issued in lieu thereof. Section 4. This ordinance shall take effect and be in force from and after its adoption and publication once in the official city paper. Introduced: April 17, 1956 Passed: April 24, 1956 ( SEAL) I Attest: City Clerk Mayor