ORDINANCE NUMBER 6128
(Published in The Salina Journal �{;� � -� P� , 1957 )
AN ORDINANCE ratifying and confirming a contract with C. N McCallum doing business as
McCollum Construction Company for the construction of a storm sewer in the City of Salina,
Kansas, heretofore designated as Gebhart Manor Storm Sewer, and providing for the issuance
of temporary notes to pay the cost thereof, pending the issuance and sale of bonds.
BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas:
Section 1. That the acceptance of the City of Salina, Kansas, of the proposal of the
McCollum Construction Company, hereinafter referred to as the "Contractor" as submitted to
the Board of Commissioners on March 12, 1957, which is hereby found to be the lowest and
best bid for such work, and the contract awarded by the Board of Commissioners of said City
to said contractor and signed on behalf of the City by its Mayor on March 19, 1957 for
the construction of certain public improvements in the City of Salina, Kansas, to --wit:
Beginning at an existing manhole at the intersection of Norton
Street and Wayne Avenue, which is 10 feet south of the center line
of Wayne Avenue and 16 feet east of the center line of Norton Street,
thence west on a line 10 feet south of the center line of Wayne Avenue
with a 48" storm sewer to the intersection of Wesley Street where a
manhole will be constructed, thence west with a 42" storm sewer to
the intersection of Quincy Street where a manhole will be constructed,
thence continue,west with a 36" storm sewer to the intersection of
Fourth Street where a manhole will be built, thence continue west
with a 30" storm sewer to the intersection of Simmons Street where
a manhole will be built, thence continue west with a 21" storm sewer
to the intersection of Highland Avenue where a manhole will be built,
thence running north with an 18" storm sewer on a line 10 feet east
of the center line of Highland Avenue to the intersection of Highland
Avenue and High Place where a manhole will be built, thence north
with a 19" storm sewer to the intersection of Leslie Avenue where
a manhole will be constructed which will be terminus of Job 356.
at and for the unit price for said work contained in said proposal, which proposal and
contract are hereby referred to and made a part of this ordinance, be add the same is
hereby ratified and confirmed, said proposal being within the estimated cost of said
improvements as shown by the sworn estimate of the City Engineer on file in the office
of the City Clerk which estimate is hereby referred to and made a part of this ordinance.
Section 2. Said improvements shall be built and constructed in accordance with the
plans and specifications therefore prepared by the City Engineer on file in the office of
the City Clerk and in accordance with the proposal of said contractor and under the terms
of said contract, all of which are hereby referred to and made a part of this ordinance.
Section 3. That temporary notes signed by the Mayor and attest by the City Clerk be
issued from time to time as the work progresses in the manner and form as required by law,
the total amount thereof not to exceed the amount of $ 41,104.80 for such work, such notes
to bear interest at not to exceed 5 per cent per annum and to mature not later that
December 1, 1958, and to be issued in such amounts and at such times as may the money for
the payment of the cost of such work be required, such notes to be issued to said contractor
and to be redeemed and cancelled at the time that Internal Improvement Bonds are issued in
Lieu thereof.
CON SOLIDATED- SALINA
Section 4. That this ordinance shall take effect and be in full force from and after
i
its publication oncd in the official city paper. j
i
Introduced: March 12, 1957
Passed: March 19, 1957
Mayor