Loading...
6191 Levy AssessmentsCON SOLIDATE D -S AL' N 4 I i ORDINANCE NUMBER 6191 (Published in The Salina Journal �� (- �) % j 1957) AN ORDINANCE relating to and apportioning and levying special assessments on certain lots andl pieces of ground in the City of Salina, Kansas, to pay the cost of construction of Main Sanitary Sewer District "AE" and Lateral Sanitary Sewer Districts Numbered 357, 358, 359, and 360, and relating to and providing for the collection and payment of such assessments. I BE IT ORDADED by the Board of Commissioners of the City of Salina, Kansas: Section 1. That for the purpose of paying for the cost of building and constructing Main Sanitary Sewer District "AE" and Lateral Sanitary Sewer Districts Numbered 357, 358, 359, and 360 and as authorized by the provisions of Ordinance Number 6134, the cost of which has been duly ascertained as shown by the City Engineer's final estimate of cost, which has been duly approved by the Board of Commissioners, there are hereby levied and assessed on i I I the property liable therefor, being all the lots and pieces of ground lying in the sewer i district mentioned above as created by Ordinance Number 6134, according to the appraised I i value of such lots and pieces of ground without regard to the buildings or improvements I thereon, special assessments covering the cost of such improvements constructed in said I ' sewer district, said special assessments being based on the special valuation and appraisement jmade by three disinterested appraisers appointed by the Board of Commissioners of the City of! Salina, Kansas, which said appraisement is hereby referred to and made a part of this ordinance I and the several amounts levied, and apportioned against the cost of improvements constructed in such district being hereby found and determined to be as set forth in the following sections of this ordinance. Section 2. That for the purpose of the payment of the cost of construction of Main Sanitary Sewer "AEI`, a ten inch clay pipe sewer beginning at an existing manhole at the i intersection of Wayne Avenue and Highland ghland Avenue; thence west along the center line of easement at the south line of Lot 17, Block 1, Gebhart Manor Addition and continuing west across Broadway Boulevard 457.0 feet where a manhole will be constructed; thence north along a line 5 feet east of the west right-of-way line of said Broadway Boulevard 1020.0 feet where a manhole will be built; thence north 70.0 feet with a 6 inch cast iron pressure line where a pump station will be installed; thence continuing north 5 feet east of west line of Broadway i Boulevard with a ten inch clay pipe sewer 1500.0 feet to a point 12.0 feet east of the west line of Hageman Avenue where a manhole will be built; thence south along a line 12 feet south of the north line of Garden Avenue where a manhole will be built which will be terminus of Main Sewer "AE", the amount levied, apportioned, and assessed against the lots and pieces of ground in said district are found and determined to be as follows; I i CON SOLIDAT EO -J ALINA 1 1 LAMER'S 1ST SUB -DIVISION Plat 1 Lot 1 - - - - - - - - - - - - - - - - - - - 320.33 Lot 2 and West 2 Lot 3 less tract 107' x bot -- - - - - - 415.01 Tract 107' x 60t in West 2 Lot 3 - - - - 71.09 West 50 feet E2 Lot 3 - - - - - - - - - - - 63.12 East 45 feet of West 95 feet of E- Lot 3 -- 56.81 E2 Lot 3 Less West 95 feet - - - - - - - - 41.03 Part W2 Lot 4 West of US 81 By-pass and North 25 feet W- Lot 7 - - - - 181.47 Part Lot 4 North of US 81 By-pass - - - - - 15.78 Lot 5 less By-pass - - - - - - - - - - - - 299.81 Part Lot 6 North and East of US 81 By-pass -165.69 Part of East 2 Lot 4 and East 2 Lot 7 add That part of Lot 6 West of US 81 By -pass -100.99 West z Lot 7 Less North 25 feet - - - - - 126.24 East -1Lot 8 - - - - - - ---------142.02 West 2Lot 8and all Lot 9 - - - - - - - - 424.47 Lot 10 - - - - - - - - - - - - - - - - - - -280.88 Plat 2 Lot 1 - - - - - - - - - - - - - - - - - - - 280.88 West 55 feet Lot 2 - - - - - - -- - - - - - 61.54 East 50 feet of West 105 feet Lot 2 - - - - 55.23 Lot 2 less West 105 feet and West 8 feet Lot 3 - - - - - - - - - - - - - 175.15 East 120 feet of West 128 feet Lot 3 - - - 132.55 West 78 feet of East 2 Lot 3 - - - - - - - 86.79 East 50 feet of Lot 3---- - - - - - -- 55.23 West 50 feet of Lot 4-- - - - - - - - -- 55.23 Lot 4 less West 50 feet - - - - - - - - - 227.23 Lot 5 less South 42 feet - - - - - - - - - 86.79 Lot 5 North of US 81 By-pass - - - - - - - - 1.58 South 42 feet of Lot 5 and North 33 feet Lot 6 - - - - - - - - - - - - - 119.93 Lot 6 Less North 33 feet - - - - - - - - - 211.45 Lot 7 - - - - - - - - - - - - - - - - - - - 282.46 Lot 8 - - - - - - - - - - - - - - - - - - - 282.46 Lot 9 - - - - - - - - - - - - - - - - - - - 282.46 East 60 feet of Lot l0---------- 66.27 Lot 10 less East 60 feet - - - - - - - - - 214.60 CON' SOLIDATED-,5.1L1NA I 1 1 LANER'S 2ND SUB -DIVISION i Plat 3 Lot 1 280.88 Lot2 ----------------------------------------- 282.46 West - Lot 3 -------------------------- 134.13 East 2 Lot 3 ---------------------------------- 134.13 Lot4 ----------------------------------------- 282.46 West 50 feet Lot 5 ---------------------------- 55.23 Lot 5 less West 50 feet and less East 96 feet of North 98 feet ----------------------- 121.50 East 96 feet of North 98 feet Lot 5 ----------- 105.72 Lot 6 less East 125 feet ---------------------- 142.02 North East 125 feet Lot 6 ------------------- 72.59 South2 East 125 feet Lot 6 ------------------- 69.43 Lot 7 less West 75 feet ----------------------- 200.40 West 75 feet of Lot 7 ------------------------- 83.63 Lot8 ----------------------------------------- 282.46 Lot9 ----------------------------------------- 282.46 Lot 10 ---------------------------------------- 280.88 PLAT 4 West 50 feet Lot 1-•�- ---------------------------- 55.23 East 100 feet Lot 6 --------------------------- 110.46 West 80 feet Lot 6 ---------------------------- 88.37 East 76 feet of West 156 feet Lot 6 ----------- 83.63 Lot7 ---------------------------------------- 282.46 West 50 feet Lot 8 ---------------------------- 55.�3 East 50 feet of West 100 feet Lot 8 ----------- 55.23 West 50 feet of East 156 feet Lot 8 ----------- 47.34 West 50 feet of East 106 feet Lot 8 ----------- 55.23 East 56 feet of Lot 8 ------------------------- 61.54 West 50 feet Lot 9 ---------------------------- 55.23 East 92 feet of West 142 feet Lot 9 ----------- 102.57 East 50 feet of West 192 feet Lot 9 ----------- 55.23 East 64 feet Lot 9 ---------------------------- 71.01 Lot10 ---------------------------------------- 280.88 North 200 feet of STS NE1 26-14-3 -----______1,136.14 East 50 feet of West 100 feet Lot 1 ----------- 55.23 East 50 feet of West 150 feet Lot 1 ----------- 55.23 East 50 feet of West 200 feet Lot 1 ----------- 55.23 1 1 CON SOLIDATED-3ALPNA 1 East 56 feet Lot 1 ---------------------------- 61.54 West 50 feet Lot 2 ---------------------------- 55.23 I' East 50 feet of West 100 feet Lot 2 ----------- 55.23 East 50 feet of West 150 feet Lot 2 ----------- 55.23 East 50 feet of West 200 feet Lot 2 ----------- 55.23 East 56 feet of Lot 2 ------------------------- 61-54 5 West 50 feet Lot 3 ---------------------------- 55.23 East 50 feet of West 100 feet Lot 3 ----------- 55.23 West 100 feet of East 156 feet Lot 3 ---------- 110.46 East 56 feet Lot 3 ---------------------------- 61.54 Lot4 ----------------------------------------- 282.46 West 156 feet of Lot 5 ------------------------ 172.00 East 100 feet of Lot 5 ------------------------ 110.46 200' X 200' tract of land in NE Corner N2 SEI less Highway 26-14-3 ---------- 252.48 Tract 175' X 200' in SE Corner El NEI 26-14-3-220.92 EZ NEI—, West of US 81 By-pass in City Limits Less Tract 175' X 200' in SE Corner 26-14-3 --------------------------------2,411.04 West 200' of North 770 feet NEI NEI 26-14-3 --less Highway--------- 773.21 100' triangular tract in SW Corner in North 770 feet of East 350 feet of West 750' NEI NEI 26-14-3 -----------------------126.24 200 feet strip East of US 81 By-pass in E2 NEI less North 770 feet 26-14-3 -------1,181.81 $17,111.50 Section 3. That for the purpose of the payment of the cost of construction of Lateral Sanitary Sewer Number 357, an eight inch clay pipe sewer beginning at an existing manhole at a point 5.0 feet south of the center line of Willis Avenue and 5.0 feet east of the west line of Broadway Boulevard; thence northwesterly following a line which is 5.0 feet east of the west line of Broadway to a manhole which is 5.0 feet south of the center line of Smith Avenue; thence west along a line 5.0 feet south of the center line of Smith Avenue 1075.0 feet where a manhole will be built which will be terminus of Lateral 357, the amount levied apportioned and assessed against the lots and pieces of ground in said district are found and determined to be as follows: j LAMER'S 1ST SUB -DIVISION Plat 1 East LLot 7 and that part of Lot 6 west of US 81 By-pass --------------------------- 145.81 West Lot 7 less North 25 feet ---------------- 188.14 North 25 feet of West - Lot 7 ------------------ 23.52 CONSOLIDATED -5 NUNA 1 1 East 2 Lot 8 ----------------------------------- 211.65 West 2 Lot 8 and all Lot 9 --------------------- 632.61 Lot10 ----------------------------------------- 418.60 PLAT 2 Lot1 -------------------------------------------418.60 West 55 feet Lot 2 ----------------------------- 91.72 East 50 feet of West 105 feet Lot 2 ------------- 82.31 Lot 2 less West 105 feet and West 8 feet Lot 3 --261.04 East 120 feet of West 128 feet Lot 1 . 3 ----------- 97 54 West 78 feet of East 2 Lot 3 ------------------- 129.34 East 50 feet Lot 3 ----------------------------- 82.31 West 50 feet Lot 4 ----------------------------- 82.31 Lot 4 less West 50 feet ------------------------ 338.64 Lot 5 less South 42 feet ----------------------- 129.34 South 42 feet Lot 5 ---------------------------- 117.58 $3,551.06 Section 4. That for the purpose of the payment of the cost of construction of Lateral Sanitary Sewer Number 358, an eight inch clay pipe sewer beginning at an existing manhole which is 5.0 feet east of the west line of Broadway Boulevard and 5.0 feet south of the center line of Willis Avenue; thence west 5.0 feet south of the center line of Willis Avenue 1250.0 feet where a manhole will be built which will be terminus of Lateral 358, the amount levied, apportioned and assessed against the lots and pieces of ground in said district are found and d6termined to be as fbllows; LAMER'S 1ST SUB -DIVISION Plat 2 North 33 feet Lot 6 ---------------------------- 69.23 Lot 6 less Notth 33 feet ----------------------- 356.80 Lot7 -------------------------------------------476.62 Lot8 ------------------------------------------ 476.62 Lot9 ------------------------------------------ 476.62 East 60 feet Lot 10 -----------------------------111.83 Lot 10 less East 60 feet ----------------------- 362.12 Plat 3 Lot1 ------------------------------------------ 473.96 Lot2 ------------------------------------------ 476.62 West 2 Lot 3 ----------------------------------- 226.32 East 2 Lot 3 ----------------------------------- 226.32 Lot4 ------------------------------------------ 476.62 West 50 feet Lot 5 ----------------------------- 93.19 Lot 5 less West 50 feet and less East 96 feet of N North 98 feet ------------------------------ 205.03 East 96 feet of North 98 feet Lot 5 ------------ 178.40 $4,686.30 CONSOLIDATEDD-S AL !NA. 1 1 Section 5. That for the purpose of the payment of the cost of construction of Lateral Sanitary Sewer Number 359, an eight inch clay pipe sewer beginning at an existing manhole which is 12.0 feet east of the west line of Hageman Avenue and 5.0 feet south of the center line of Maple Avenue; thence west along a line 5.0 feet south of the centet line of Maple Avenue 1250.0 feet where a manhole will be built which will be terminus of Lateral 359, the amount levied, apportioned and assessed against the lots and pieces of ground in said district are found and determined to be as follows: LAMEf?S 2ND SUB -DIVISION Plat 3 Lot 6 less East 125 feet ---------------------- feet 234.09 North 2 East 125 feet Lot 6 ------------------- 91.03 119.65 South 2 of East 125 feet Lot 6 ---------------- 114.44 Lot 7 less West 75 feet ----------------------- East 330.33 West ?5 feet Lot 7 ---------------------------- feet 137.85 Lot8 ----------------------------------------- East 50 feet of West 465.58 Lot9 ----------------------------------------- Lot 2 ------------ 91.04 East 56 465.58 Lot10 ---------------------------------------- 101.44 462.98 50 feet Lot 3 ----------------------------- PLAT 4 West 50 feet Lot 1 ---------------------------- feet 91.03 East 50 feet of West 100 feet Lot 1 ----------- 91.03 East 50 feet of West 100 feet Lot 1 ----------- 91.03 East 50 feet of West 200 feet Lot 1 ----------- 91.03 East 56 feet of Lot 1 ------------------------- 101.44 West 50 feet Lot 2 ---------------------------- 91.03 East 50 feet of West 100 feet Lot 2 ----------- 91.03 East 50 feet of West 150 feet Lot 2 ----------- 91.03 East 50 feet of West 200 feet Lot 2 ------------ 91.04 East 56 feet of Lot 2 ------------------------- 101.44 West 50 feet Lot 3 ----------------------------- 91.04 East 50 feet of West 100 feet Lot 3 ----------- 9m.04 West 100 feet of East 156 feet Lot 3 ---------- 182.07 East 56 feet Lot 3 ---------------------------- 101.44 Lot4 ----------------------------------------- 465.58 West 156 feet Lot 5 --------------------------- 283.51 East 100 feet Lot 5 --------------------------- 182.07 $4,658.38 CONSOLIDATED SALINA 1 1 Section 6. That for the purpose of the payment of the cost of construction of Lateral Sanitary Sewer Number 360, an eight inch clay pipe sewer beginning at an existing manhole which is 12.0 feet east of the west line of Hageman Avenue and 5.0 feet south of the center line of Garden Avenue; thence west along a line 5.0 feet north of the center line of Garden Avenue 1250.0 feet where a manhole will be built which will be terminus of Lateral 360, the amount levied, apportioned and assessed against the lots and pieces of ground in said district are found and determined to be as follows; LAMER'S 2ND SUB -DIVISION Plat 4 East 100 feet Lot 6 --------------------------- 214.68 West 80 feet Lot 6 ---------------------------- 171.74 I East 76 feet of West 156 feet Lot 6 ----------- 162.54 Lot7 ----------------------------------------- 548.96 West 50 feet Lot 8 ---------------------------- 107.34 East 50 feet of West 100 feet Lot 8 ----------- 107.34 West 50 feet of East 156 feet Lot 8 ----------- 92.00 West 59 feet of East 106 feet Lot 8 ----------- 107.34 East 56 feet Lot 8 ---------------------------- 119.61 West 50 feet Lot 9 ---------------------------- 107.34 East 92 feet of West 142 feet of Lot 9 -------- 199.34 East 50 feet of West 192 feet Lot 9 ----------- 107.34 East 64 feet of Lot 9 ------------------------- 138.01 Lot10 ---------------------------------------- 545.89 North 200 feet Std NE,—� 26-14_-3 -------------21208.10 $4,937.57 Section 7. Said amounts levied, apportioned and assessed as aforesaid shall be due and collectible in ten equal inttallments, the first becoming due with the taxes levied for 195$,' and one of said installments falling due each and every year thereafter until all are paid, all to be collected with interest as in this ordinance provided for, however, that the owner of any piece or parcel of property liable for any such assessment may redeem his property from any such assessment liability by paying into the City Treasury the entire amount chargeable against the same as in this ordinance designated at any time within thirty days from the publication of this ordinance, and before the issuance of bonds of said City, in payment of the cost of said improvements, and his property so paid shall not thereafter be liable for any further assessment for the cost of said improvements nor for any part of said bonds. CON SOLIDAT EO -SAUNA i i 1 i Section 8. There is hereby levied and assessed further against such lots and pieces of ground as described in this ordinance, interest at such rate per annum as shall be borne by the bonds hereafter to be issued for the payment of the remaining unpaid cost of such improvements, such rate to be hereafter determined and fixed by ordinances when such bonds are issued, on all of said installments mentioned and provided for in this ordinance, from the date of the bonds which may be issued at the end of thirty days, as specified in the preceding section hereof as by law provided, to the time of collection of the last installment as provided by law, which said interest shall be collected annually at the same time and in the same manner as said installments are collected, and after the taking effect of this i ordinance and the fixing of the interest rate when such bonds are authorized and issued, it ji shall be the duty of the City Clerk of said City to annually at the same time other taxes i are certified, to certify to the County Clerk of Saline County, Kansas, a full list of all property liable to assessment and taxation for such work and improvements, except such property on which the special assessments have been paid in full as hereinbefore provided, together with the respective amounts due on each of such lots and pieces of ground, which amouInts � shall include the annual installments of such special assessments together with the interest at one year at the rate to be fixed and provided for in this ordinance, being the rate borne by the bonds to be issued on all unpaid balances of such assessments and such amounts so certified as herein provided shall be placed upon the tax roll by the County Clerk of Saline County, Kansas, and collected as all other taxes are collected. Section 9. That this ordinance shall be in effect and force from and after its publication once in the official city paper. (SEAL) Attest: f; City Clerk Introduced: October 1, 1957 Passed: October 8, 1957