Loading...
6447 Levy Assessmentsi:.ONSL'L1DATED-SALT A D ORDINANCE NUMBER 6447 (Published in The Salina Journal o , 1960) AN ORDINANCE relating to and apportioning and levying special assessments on certain lots and pieces of ground in the City of Salina, Kansas, to pay the cost of curbing, guttering, paving and grading Clark Street (Thirty-three (33) feet wide from back of curb to back of curb) with two (2) inch hot asphalt mix over a six (6) inch crushed rock base, from the north line of Armory Road to a point 136.5 feet north of the north line of South Street, paving and grading of Franklin Street (Twenty-eight (28) feet wide from toe of gutter to toe of gutter) with two (2) inch hot asphalt mix over a six (6) inch crushed rock base, from the east side of Custer Street to the west line of Sheridan Street; paving and grading Fifth Street with two (2) inch hot asphalt mix over a six (6) inch crushed rock base, from the north line of Harsh Avenue to the south line of Euclid Avenue; curbing, guttering, paving and grading of Max Avenue with two (2) inch hot asphalt mix over a six (6) inch crushed rock base, from the east line of Quincy Street to the west line of Norton Street; curbing, guttering, paving and grading of Quincy Street (Thirty-three (33) feet wide from back of curb to back of curb) with two (2) inch hot asphalt mix over a six (6) inch crushed rock base, from the south line of Leslie Avenue to the north line of Wayne Avenue; and relating to and providing for the collection and payment of such assessments. BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas: Section 1. For the purpose of paying for that part of the cost of improvements in certain portions of certain streets as hereinafter set forth in the following sections of this ordinance which is chargeable to the private property in the assessment districts for each of such improvements, respectively, as set forth in the following sections of this ordinance with respect to each of such improvements, there is hereby levied and assessed on the property liable therefore, being all the lots and pieces of land lying on either side of said street so improved, respectively, to the middle of the block for the distance improved with respect to the improvements mentioned in Sections 2, 3, 4, 5, and 6 of this ordinance, according to the appraised value of such lots and pieces of ground with respect to each suct improvements, without regard to the buildings or improvements thereon, special assessments covering the cost of such work and improvements, said special assessments being based on the special valuation and appraisement of said lots and pieces of ground therefore made by three disinterested appraisers appointed by the Board of Commissioners of the City of Salina, Kansas, with respect to each such improvement which said appraisemants are hereby referred to and made a part of this ordinance, and the several amounts so levied, apportioned and assessed against the lots and pieces of ground for each such improvement, respectively, for the purpose aforesaid, are hereby found and determined to be the amounts set forth in the following sections of this ordinance with respect to each of said improvements. Section 2. For that part of the cost of curbing, guttering, paving and grading Clark Street (Thirty-three (33) feet wide from back of curb to back of curb) with two (2) inch hot asphalt mix over a six (6) inch crushed rock base, from the north line of Armory Road to a point 136.5 feet north of the north line of South Street, which is chargeable against t private property within the district chargeable therefore, and which cost is hereby determin� to be $11,603.79, there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: CONEOMDATED-SALIN A 1 Block 1 East 152.5' Lot 1 - - - - - - - - - - - 1,000.31 East 32.5' Lot 9 - - - - - - - - - - - - - 81.69 HOLIDAY ADDITION - - - - - - -150.05 Lot 11 - - - - - - - - - - - Block 2 Lot 1 - - - - - - - - - - - --- - - - - - 332.17 Lot 2 - - - - - - - - - - - - - - - - - - 332.17 Lot 3 - - - - - - - - - - - - - - - - - - 332.17 Lot 4 - - - - - - - - - - - - - - - - - - 332.17 Lot 5 - - - - - - - - - - - - - - - - - - 332.17 Lot 6 - - - - - - - - - - - - - - - - - - 332.17 Lot 7 - - - - - - - - - - - - - - - - - - 332.17 Lot 8 - - - - - - - - - - - - - - - - - - 332.17 Lot 9 - - - - - - - - - - - - - - - - - - 332.17 Lot 10 - - - - - - - - - - - - - - - - - 332.17 Lot 11 - - - - - - - - - - - - - - - - - 332.17 i Lot 12 - - - - - - - - - - - - - - - - - 332.17 Lot 13 - - - - - - - - - - - - - - - - - 332.17 Lot 14 - - - - - - - - - - - - - - - - - 332.17 Lot 15 - - - - - - - - - - - - - - - - - 332.17 Lot 16 - - - - - - - - - - - - - - - - - 484.45 $5,467.00 Block 1 East 152.5' Lot 1 - - - - - - - - - - - 1,000.31 East 32.5' Lot 9 - - - - - - - - - - - - - 81.69 Lot 10 - - - - - - - - - - - - - - - - -150.05 Lot 11 - - - - - - - - - - - - - - - - - 150.05 Lot 12 - - - - - - - - - - - - - - - - - 150.05 Lot 13 - - - - - - - - - - - - - - - - - 191.73 Lot 14 - - - - - - - - - - - - - - - - - 188.39 Lot 15 - - - - - - - - - - - - - - - - - 150.05 Lot 16 - - - - - - - - - - - - - - - - - 150.05 Lot 17 - - - - - - - - - - - - - - - - - 150.05 Lot 18 - - - - - - - - - - - - - - - - - 150.05 Lot 19 - - - - - - - - - - - - - - - - - 150.05 Lot 20 - - - - - - - - - - - - - - - - - 210.07 Lot 21 - - - - - - - - - - - - - - - - - 200.04 $3,072.63 CONSOLIDATED-SALINA 1 1 Block 3 East 47.5' Lot 9, East 47.5' Lot 10, Lot 11, Lot 12 - - - - - - - - - - - - - - 695.03 Lot 13 - - - - - - - - - - - - - - - - - 265.49 Lot 14 - - - - - - - - - - - - - - - - - 211.53 Lot 15 - - - - - - - - - - - - - - - - - 211.53 Lot 16 - - - - - - - - - - - - - - - - - 343.20 i $1,726.78 Block 5 South 136' Lot 10 - - - - - - - - - - - - 279.11 Lot 12 - - - - - - - - - - - - - - - - - 319.81 Lot 13 - - - - - - - - - - - - - - - - - 261.66 Lot "A' - - - - - - - - - - - - - - - - - 267.48 Lot "B" - - - - - - - - - - - - - - - - - 209.32 I I $1,337.38 i Section 3. For that part of the cost of paving and grading Franklin Street (Twenty- eight (28) feet wide from toe of gutter to toe of gutter) with two (2) inch hot asphalt mix six (6) inch crushed rock base, from the east side of Custer Street to the west line of Sheridan Street, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $1,953.49, there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: SOUTHERN HEIGHTS ADDITION Block 12 Lot 5 - - - - - - - - - - - - - - - - - - 10 2.7 5 Lot 6 - - - - - - - - - - - - - - - - - - 102.75 Lot 7 - - - - - - - - - - - - - - - - - - 102.75 Lot 9 - - - - - - - - - - - - - - - - - - 108.47 Lot 10 - - - - - - - - - - - - - - - - - 102.75 Lot 11 - - - - - - - - - - - - - - - -- 102.75 Lot 12 - - - - - - - - - - - - - - - - - 102.75 Block 19 Lot 1 - - - - - - - - - - - - - - - - - - 108.47 Lot 2 - - - - - - - - - - - - - - - - - - 102.75 Lot 3 - - - - - - - - - - - - - - - - - - 102.75 Lot 4 - - - - - - - - - - - - - - - - - - 10 2.7 5 Lot 5 - - - - - - - - .- - - - - - - - - - 102.75 North 20' Lot 6 - - - - - - - - - - - - 41.10 a CONSOL?DATED-SALTNA f Ci DIMICK"S ADDITION Lot 25 - - - - - - - - - - - - - - - - - 108.47 Lot 26 - - - - - - - - - - - - - - - - - 106.19 North Lot 27 - - - - - - - - - - - - - 50.24 South ' Lot 27 and all Lot 28 - - - - - - 150.71 Lot 29 - - - - - - - - - - - - - - - - - 100.48 Lot 30 - - - - - - - - - - - - - - - - - 100.48 i North 25' Lot 31 - - - - - - - - - - - - 51.38 $1,953.49 Section 4. For that part of the cost of paving and grading Fifth Street with two (2) inch hot asphalt mix over a six (6) inch cuushed rock base, from the north line of Harsh Avenue to the south line of Euclid Avenue, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $14,373.09, there i is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: E. M. I. ADDITION Block 9 Lot 1 plus 10' vacated street - - - - - - 185.97 Lots 3, 5, 7 - - - - - - - - - - - - - - -446.32 I Lot 9 - - - - - - - - - - - - - - - - - -148.77 i Lots 11, 13 - - - - - - - - - - - - - - - 297.54 Lot 15 and South ' Lot 17 - - - - - - - - 223.16 i Lot 19 and North Lot 17 - - - - - - - - 260.35 j Block 10 Lot 2 plus 10' vacated street - - - - - - 185.97 Lot 4 and South'k Lot 6 - - - - - - - - - 223.16 North � Lot 6 and all Lot 8 - - - - - - - 223.16 Lots 10 and 12 - - - - - - - - - - - - -297.54 Lot 14 - - - - - - - - - - - - - - - - - 148.77 Lot 16 - - - - - - - - - - - - - - - - - 148.77 Lot 18 - - - - - - - - - - - - - - - - - 148.77 Lot 20 plus 10' vacated street - - - - - 185.97 $3,124,22 Block 16 Lot 1 plus 10' vacated street - - - - - - 185.97 Lot 3 - - - - - - - - - - - - - - - - - - 148.77 Lot 5 - - - - - - - - - - - - - - - - - - 148.77 Lot 7 - - - - - - - - - - - - - - - - - - 148.77 t t 1 CONSOLIDATED-SALTNA Dot 9 - - - - - - - - - - - - - - - I - - 148.77 - - - 152.40 I 5 - - - - - - - - - - - - - - - Lot 11 - - - - - - - - - - - - - - - - - 148.77 Lot Lot 13 - - - - - - - - - - - - - - - -- 148.77 - - - 152.40 Lot 15 - - - - - - - - - - - - - - - - - 148.77 15 - - - - - - - - - - - - - - Lot 17 - - - - - - - - - - - - - - - - - 148.77 Lot Lot 19 plus 10' vacated street - - - - - 185.97 I Lot 2 plus 10' vacated street - - - Block 15 Lot i Lot 2 plus 10' vacated street - - - - 185.98 Lot Lot 4 - - - - - - - - - - - - - - - - - - 148.77 � I i Lot I 6 - - - - - - - - - - - - - - - - - - 148.77 14 - - - - - - - - - - - - - - Lot 8 - - - - - - - - - - - - - - - - - - 148.77 Lot 10 - - - - - - - - - - - - - - - - - 148.77 ! Lot 12 - - - - - - - - - - - - - - - - - 148.77 Lot 14 - - - - - - - - - - - - - - - I - - 148.77 Lot 16 - - - - - - - - - - - - - - - - - 148.77 Lot 18 - - - - - - - - - - - - - - - - - 148.77 Lot 20 plus 10' vacated street - - - - - 185.98 $3,124.22 Block 21 Lot 1 plus 10' vacated street - - - - - - 190.51 Lot 3 - - - - - - - - - - - - - - - - - - 152.40 Lot 5 - - - - - - - - - - - - - - - - - - 152.40 Lot 7 - - - - - - - - - - - - - - - - - - 152.40 Lot 9 - - - - - - - - - - - - - - - - - - 152.40 Lot 11 - - - - - - - - - - - - - - - - - 152.40 Lot 13 - - - - - - - - - - - - - - - -- 152.40 Lot 15 - - - - - - - - - - - - - - - - - 152.40 Lot 17 - - - - - - - - - - - - - - - - - 152.40 Lot 19 - - - - - - - - - - - - - - - - - 152.40 Block 22 Lot 2 plus 10' vacated street - - - - - - 190.51 Lot 4 - - - - - - - - - - - - - - - - - - 152.40 Lot 6 - - - - - - - - - - - - - - - - - - 152.40 Lot 8 - - - - - - - - - - - - - - - - - - 152.40 Lot 10 - - - - - - - - - - - - - - - -- 152.40 Lot 12 - - - - - - - - - - - - - - - - - 152.40 Lot 14 - - - - - - - - - - - - - - - - - 152.40 CONSOLIDATED-SALINA 1 C7 Lot 16 - - - - - - - - - - - - - - - - - 152.40 Lot 18 - - - - - - - - - - - - - - - - - 152.40 Lot 20 - - - - - - - - - - - - - - - - - 152.40 $3,124.22 Block 25 Lot 1 - - - - - - - - - - - - - - - - - - 173.63 Lot 3 - - - - - - - - - - - - - - - - - - 173.63 Lot 5 - - - - - - - - - - - - - - - - - - 173.63 Lot 7 - - - - - - - - - - - - - - - - - - 173.63 Lot 9 and Soutij k Lot 11 - - - - - - - - 260.64 North � Lot 11 and all Lot 13 - - - - - - 260.44 Lot 15 - - - - - - - - - - - - - - - - - 173.63 Lot 17 - - - - - - - - - - - - - - - - - 173.63 Lot ' 19 - - - - - - - - - - - - - - - - - 173.63 Lot 21 - - - - - - - - - - - - - - - - - 173.63 Lot 23 - - - - - - - - - - - - - - - - - 173.63 Lot 25 and 27 - - - - - - - - - - - - - 347.25 Lot 29 - - - - - - - - - - - - - - - - - 173.61 Lot 31 - - - - - - - - - - - - - - - - - 173.61 St. John's Military School Campus in E. M. I. Addition - - - - - - - - - 2,222.41 $5,000." Section 5. For that part of the cost of curbing, guttering, paving and grading Max Avenue with two (2) inch hot asphalt mix over a six (6) inch crushed rock base, from the east line of Quincy Street to the west line of Norton Avenue, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $6,591.20, there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in section 1 of this ordinance, the following amounts: SOUTHERN VIEW ADDITION Block 1 South 32.5' Lot 3 and North 44' Lot 4 - - 376.80 South 16' Lot 4 and North 52' Lot 5 - - - 333.11 South 8' Lot 5 and Lot 6 - - - - - - - -- 365.87 Lot ----------- - - - - -- 376.80 Lot 8 - - - - - - - - - - - - - - - - - - 376.80 South 222.5' Lot 9 - - - - - - - - - -- 480.55 CONSOLIDATED-SALINA 1 South 222.5' Lot 10 and Lots 11-12-13 and South 125' Lot 14 - - - - - - - - - 1,346.08 Block 3 Lot 1 - - - - - - - - - - - - - - - - - - 341.30 Lot 2 - - - - - - - - - - - - - - - - - - 319.46 Lot 3 - - - - - - - - - - - - - - - - - - 319.46 Lot 4 - - - - - - - - - - - - - - - - - - 294.88 i Lot 5 - - - - - - - - - - - - - - - - - - 319.46 Lot 6 - - - - - - - - - - - - - - - - - - 319.46 Lot 7 - - - - - - - - - - - - - - - - - - 319.46 Lot 8 - - - - - - - - - - - - - - - - - - 319.46 Lot 9 - - - - - - - - - - - - - - - - - - 354.95 South 92.5' Lot 19 - - - - - - - - - - - 27.30 $6,591.20 Section 6. For that part of the cost of paving and grading Quincy Street (Thirty-three (33) feet wide from back of curb to back of curb) with two (2) inch hot asphalt mix over a s (6) inch crushed rock base, from the south line of Leslie Avenue to the north line of Wayne Avenue, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $10,733.58, there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: (Approx)East 132' Southl NWk East of UP Rwy 25-14-3 - - - - - - - - 52359.38 SOUTH FIELD ADDITION Block 1 Lot 15 - - - - - - - - - - - - - - - - - 436.14 Lot 16 - - - - - - - - - - - - - - - - - 373.31 Lot 17 - - - - - - - - - - - - - - - - - 377.01 Lot 18 - - - - - - - - - - - - - - - - - 373.31 Lot 19 - - - - - - - - - - - - - - - - - 377.01 Lot 20 - - - - - - - - - - - - - - - - - 373.31 Lot 21 - - - - - - - - - - - - - - - - - 377.01 Lot 22 - - - - - - - - - - - - - - - - - 373.31 Lot 23 - - - - - - - - - - - - - - - - - 377.01 Lot 24 - - - - - - - - - - - -- ----373.31 Lot 25 - - - - - - - - - - - - - - - - - 377.01 Lot 26 - - - - - - - - - - - - - - - - - 373.31 Lot 27 - - - - - - - - - - - - - - - - - 377.01 Lot 28 - - - - - - - - - - - - - - - - - 436.14 $10,733.58 CONSOLIDATED -SALIVA 1 1 Section 7. Said amounts so levied, apportioned and assessed as aforesaid will be due and collectible in ten equal installments, the first becoming due with the taxes levied for the year 1960, and one of said installments falling due each and every year thereafter until all are paid and all to be collected with interest as in this ordinance provided, HOWEVER, that the owner of any piece of property liable for any such assessment may redeem his property from such liability by paying to the City Treasury the entire amount chargeable against the same, as in this ordinance provided, at any time within thirty days after the publication of! this ordinance and before the issuance of bonds of said City in payment of the balance of th� i cost of said improvements, the property so paid on shall not hereafter be liable for any further assessments for the cost of said improvements nor for any part of said bonds. Section 8. There is hereby levied further and assessed against such lots and pieces of ground described in this ordinance, interest at such rate per annum as shall be borne by the bonds hereafter to be issued for the payment of the remaining unpaid cost of such improvemen to be hereafter determined and fixed by ordinance when such bonds are issued on all of said installments mentioned and provided for in this ordinance, from the date of the bonds which may be issued at the end of thirty days as specified in the preceding sections hereof, as by law provided, to the time of the collection of the installments as provided by law, which said interest shall be collected annually at the same time and in the same manner as said installment& are collected and after the taking effect of this ordinance and the fixing of said interest rate when such bonds are authorized and issued, it shall be the duty of the City Clerk of said City to annually at the same time other taxes are certified and until all said assessments so apportioned and levied have been certified to the County Clerk of Saline County, Kansas, a full list of all property liable to assessment and taxation for such work and improvement, except such property on which the special assessments aforesaid have been paid in full as hereinbefore provided, together with the respective amounts due on each of said lots and pieces of ground which amounts shall include the annual installments of such special assessments with interest for one year at the rate to be fixed as provided for in this ordinance, on all unpaid balances of said assessments, and such amounts so certified as herein provided shall be placed upon the tax roll by the County Clerk of Saline County, Kansas, and collected as other taxes are collected. Section 9. This ordinance shall take effect and be in full force from and after its adoption and publication once in the official city paper. (SEAL) Attest: i City Clerk Introduced: May 17, 1960 Passed: May 24, 1960 yj Mayor / t S,