ORDINANCE NUMBER 6447
(Published in The Salina Journal o , 1960)
AN ORDINANCE relating to and apportioning and levying special assessments on certain lots
and pieces of ground in the City of Salina, Kansas, to pay the cost of curbing, guttering,
paving and grading Clark Street (Thirty-three (33) feet wide from back of curb to back of
curb) with two (2) inch hot asphalt mix over a six (6) inch crushed rock base, from the
north line of Armory Road to a point 136.5 feet north of the north line of South Street,
paving and grading of Franklin Street (Twenty-eight (28) feet wide from toe of gutter to
toe of gutter) with two (2) inch hot asphalt mix over a six (6) inch crushed rock base,
from the east side of Custer Street to the west line of Sheridan Street; paving and grading
Fifth Street with two (2) inch hot asphalt mix over a six (6) inch crushed rock base, from
the north line of Harsh Avenue to the south line of Euclid Avenue; curbing, guttering,
paving and grading of Max Avenue with two (2) inch hot asphalt mix over a six (6) inch
crushed rock base, from the east line of Quincy Street to the west line of Norton Street;
curbing, guttering, paving and grading of Quincy Street (Thirty-three (33) feet wide from
back of curb to back of curb) with two (2) inch hot asphalt mix over a six (6) inch crushed
rock base, from the south line of Leslie Avenue to the north line of Wayne Avenue; and
relating to and providing for the collection and payment of such assessments.
BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas:
Section 1. For the purpose of paying for that part of the cost of improvements in
certain portions of certain streets as hereinafter set forth in the following sections of
this ordinance which is chargeable to the private property in the assessment districts for
each of such improvements, respectively, as set forth in the following sections of this
ordinance with respect to each of such improvements, there is hereby levied and assessed on
the property liable therefore, being all the lots and pieces of land lying on either side of
said street so improved, respectively, to the middle of the block for the distance improved
with respect to the improvements mentioned in Sections 2, 3, 4, 5, and 6 of this ordinance,
according to the appraised value of such lots and pieces of ground with respect to each suct
improvements, without regard to the buildings or improvements thereon, special assessments
covering the cost of such work and improvements, said special assessments being based on the
special valuation and appraisement of said lots and pieces of ground therefore made by three
disinterested appraisers appointed by the Board of Commissioners of the City of Salina,
Kansas, with respect to each such improvement which said appraisemants are hereby referred
to and made a part of this ordinance, and the several amounts so levied, apportioned and
assessed against the lots and pieces of ground for each such improvement, respectively, for
the purpose aforesaid, are hereby found and determined to be the amounts set forth in the
following sections of this ordinance with respect to each of said improvements.
Section 2. For that part of the cost of curbing, guttering, paving and grading Clark
Street (Thirty-three (33) feet wide from back of curb to back of curb) with two (2) inch
hot asphalt mix over a six (6) inch crushed rock base, from the north line of Armory Road
to a point 136.5 feet north of the north line of South Street, which is chargeable against t
private property within the district chargeable therefore, and which cost is hereby determin�
to be $11,603.79, there is hereby levied, apportioned and assessed against the following
described lots and pieces of land as provided for in Section 1 of this ordinance, the
following amounts:
CONEOMDATED-SALIN A
1
Block 1
East 152.5' Lot 1 - - - - - -
- - - - - 1,000.31
East 32.5' Lot 9 - - - - - -
- - - - - - - 81.69
HOLIDAY ADDITION
- - - - - - -150.05
Lot 11 - - - - - - - - - - -
Block 2
Lot
1 - - -
- - - - - - - - --- - - - - - 332.17
Lot
2 - - -
- - - - - - - - - - - - - - - 332.17
Lot
3 - - -
- - - - - - - - - - - - - - - 332.17
Lot
4 - - -
- - - - - - - - - - - - - - - 332.17
Lot
5 - - -
- - - - - - - - - - - - - - - 332.17
Lot
6 - - -
- - - - - - - - - - - - - - - 332.17
Lot
7 - - -
- - - - - - - - - - - - - - - 332.17
Lot
8 - - -
- - - - - - - - - - - - - - - 332.17
Lot
9 - - -
- - - - - - - - - - - - - - - 332.17
Lot
10 - -
- - - - - - - - - - - - - - - 332.17
Lot
11 - -
- - - - - - - - - - - - - - - 332.17
i
Lot
12 - -
- - - - - - - - - - - - - - - 332.17
Lot
13 - -
- - - - - - - - - - - - - - - 332.17
Lot
14 - -
- - - - - - - - - - - - - - - 332.17
Lot
15 - -
- - - - - - - - - - - - - - - 332.17
Lot
16 - -
- - - - - - - - - - - - - - - 484.45
$5,467.00
Block 1
East 152.5' Lot 1 - - - - - -
- - - - - 1,000.31
East 32.5' Lot 9 - - - - - -
- - - - - - - 81.69
Lot 10 - - - - - - - - - -
- - - - - - -150.05
Lot 11 - - - - - - - - - - -
- - - - - - 150.05
Lot 12 - - - - - - - - - - -
- - - - - - 150.05
Lot 13 - - - - - - - - - - -
- - - - - - 191.73
Lot 14 - - - - - - - - - - -
- - - - - - 188.39
Lot 15 - - - - - - - - - - -
- - - - - - 150.05
Lot 16 - - - - - - - - - - -
- - - - - - 150.05
Lot 17 - - - - - - - - - - -
- - - - - - 150.05
Lot 18 - - - - - - - - - - -
- - - - - - 150.05
Lot 19 - - - - - - - - - - -
- - - - - - 150.05
Lot 20 - - - - - - - - - - -
- - - - - - 210.07
Lot 21 - - - - - - - - - - -
- - - - - - 200.04
$3,072.63
CONSOLIDATED-SALINA
1
1
Block 3
East 47.5' Lot 9, East 47.5' Lot 10,
Lot 11, Lot 12 - - - - - - - - - - - - - - 695.03
Lot 13 - - - - - - - - - - - - - - - - - 265.49
Lot 14 - - - - - - - - - - - - - - - - - 211.53
Lot 15 - - - - - - - - - - - - - - - - - 211.53
Lot 16 - - - - - - - - - - - - - - - - - 343.20
i
$1,726.78
Block 5
South 136' Lot 10 - - - - - - - - - - - - 279.11
Lot 12 - - - - - - - - - - - - - - - - - 319.81
Lot 13 - - - - - - - - - - - - - - - - - 261.66
Lot "A' - - - - - - - - - - - - - - - - - 267.48
Lot "B" - - - - - - - - - - - - - - - - - 209.32 I
I
$1,337.38
i
Section 3. For that part of the cost of paving and grading Franklin Street (Twenty-
eight (28) feet wide from toe of gutter to toe of gutter) with two (2) inch hot asphalt mix
six (6) inch crushed rock base, from the east side of Custer Street to the west line of
Sheridan Street, which is chargeable against the private property within the district
chargeable therefore, and which cost is hereby determined to be $1,953.49, there is hereby
levied, apportioned and assessed against the following described lots and pieces of land as
provided for in Section 1 of this ordinance, the following amounts:
SOUTHERN HEIGHTS ADDITION
Block 12
Lot
5 - - - - - - - - -
- - - - - - - - - 10 2.7 5
Lot
6 - - - - - - - - -
- - - - - - - - - 102.75
Lot
7 - - - - - - - - -
- - - - - - - - - 102.75
Lot
9 - - - - - - - - -
- - - - - - - - - 108.47
Lot
10 - - - - - - - -
- - - - - - - - - 102.75
Lot
11 - - - - - - - -
- - - - - - - -- 102.75
Lot
12 - - - - - - - -
- - - - - - - - - 102.75
Block 19
Lot 1 - - - - - - - - - - - - - - - - - - 108.47
Lot 2 - - - - - - - - - - - - - - - - - - 102.75
Lot 3 - - - - - - - - - - - - - - - - - - 102.75
Lot 4 - - - - - - - - - - - - - - - - - - 10 2.7 5
Lot 5 - - - - - - - - .- - - - - - - - - - 102.75
North 20' Lot 6 - - - - - - - - - - - - 41.10
a
CONSOL?DATED-SALTNA
f
Ci
DIMICK"S ADDITION
Lot 25 - - - - - - - - - - - - - - - - - 108.47
Lot 26 - - - - - - - - - - - - - - - - - 106.19
North Lot 27 - - - - - - - - - - - - - 50.24
South ' Lot 27 and all Lot 28 - - - - - - 150.71
Lot 29 - - - - - - - - - - - - - - - - - 100.48
Lot 30 - - - - - - - - - - - - - - - - - 100.48
i
North 25' Lot 31 - - - - - - - - - - - - 51.38
$1,953.49
Section 4. For that part of the cost of paving and grading Fifth Street with two (2)
inch hot asphalt mix over a six (6) inch cuushed rock base, from the north line of Harsh
Avenue to the south line of Euclid Avenue, which is chargeable against the private property within
the district chargeable therefore, and which cost is hereby determined to be $14,373.09, there
i
is hereby levied, apportioned and assessed against the following described lots and pieces
of land as provided for in Section 1 of this ordinance, the following amounts:
E. M. I. ADDITION
Block 9
Lot 1 plus 10' vacated street - - - - - - 185.97
Lots 3, 5, 7 - - - - - - - - - - - - - - -446.32
I
Lot 9 - - - - - - - - - - - - - - - - - -148.77
i
Lots 11, 13 - - - - - - - - - - - - - - - 297.54
Lot 15 and South ' Lot 17 - - - - - - - - 223.16
i
Lot 19 and North Lot 17 - - - - - - - - 260.35 j
Block 10
Lot
2 plus
10' vacated street - - -
- - - 185.97
Lot
4 and South'k Lot 6 - - - - - -
- - - 223.16
North
� Lot
6 and all Lot 8 - - - -
- - - 223.16
Lots
10 and
12 - - - - - - - - - -
- - -297.54
Lot
14 - -
- - - - - - - - - - - -
- - - 148.77
Lot
16 - -
- - - - - - - - - - - -
- - - 148.77
Lot
18 - -
- - - - - - - - - - - -
- - - 148.77
Lot
20 plus
10' vacated street - -
- - - 185.97
$3,124,22
Block 16
Lot 1 plus 10' vacated street - - - - - - 185.97
Lot 3 - - - - - - - - - - - - - - - - - - 148.77
Lot 5 - - - - - - - - - - - - - - - - - - 148.77
Lot 7 - - - - - - - - - - - - - - - - - - 148.77
t
t
1
CONSOLIDATED-SALTNA
Dot
9 - - - -
- - - - - - - - - - -
I
- - 148.77
- - - 152.40
I
5 - - - - - - - - - - - - - - -
Lot
11 - - - -
- - - - - - - - - - -
- - 148.77
Lot
Lot
13 - - - -
- - - - - - - - - - -
-- 148.77
- - - 152.40
Lot
15 - - - -
- - - - - - - - - - -
- - 148.77
15 - - - - - - - - - - - - - -
Lot
17 - - - -
- - - - - - - - - - -
- - 148.77
Lot
Lot
19 plus 10'
vacated street - - -
- - 185.97
I
Lot
2 plus 10' vacated street - - -
Block 15
Lot
i
Lot
2 plus 10'
vacated street - -
- - 185.98
Lot
Lot
4 - - - - -
- - - - - - - - - - -
- - 148.77
�
I
i
Lot
I
6 - - - - -
- - - - - - - - - - -
- - 148.77
14 - - - - - - - - - - - - - -
Lot
8 - - - - -
- - - - - - - - - - -
- - 148.77
Lot
10 - - - -
- - - - - - - - - - -
- - 148.77
!
Lot
12 - - - -
- - - - - - - - - - -
- - 148.77
Lot
14 - - - -
- - - - - - - - - - -
I
- - 148.77
Lot
16 - - - -
- - - - - - - - - - -
- - 148.77
Lot
18 - - - -
- - - - - - - - - - -
- - 148.77
Lot
20 plus 10'
vacated street - - -
- - 185.98
$3,124.22
Block 21
Lot
1 plus 10' vacated street - - -
- - - 190.51
Lot
3 - - - - - - - - - - - - - - -
- - - 152.40
Lot
5 - - - - - - - - - - - - - - -
- - - 152.40
Lot
7 - - - - - - - - - - - - - - -
- - - 152.40
Lot
9 - - - - - - - - - - - - - - -
- - - 152.40
Lot
11 - - - - - - - - - - - - - -
- - - 152.40
Lot
13 - - - - - - - - - - - - - -
- -- 152.40
Lot
15 - - - - - - - - - - - - - -
- - - 152.40
Lot
17 - - - - - - - - - - - - - -
- - - 152.40
Lot
19 - - - - - - - - - - - - - -
- - - 152.40
Block 22
Lot
2 plus 10' vacated street - - -
- - - 190.51
Lot
4 - - - - - - - - - - - - - - -
- - - 152.40
Lot
6 - - - - - - - - - - - - - - -
- - - 152.40
Lot
8 - - - - - - - - - - - - - - -
- - - 152.40
Lot
10 - - - - - - - - - - - - - -
- -- 152.40
Lot
12 - - - - - - - - - - - - - -
- - - 152.40
Lot
14 - - - - - - - - - - - - - -
- - - 152.40
CONSOLIDATED-SALINA
1
C7
Lot 16 - - - - - - - - - - - - - - - - - 152.40
Lot 18 - - - - - - - - - - - - - - - - - 152.40
Lot 20 - - - - - - - - - - - - - - - - - 152.40
$3,124.22
Block 25
Lot 1 - - - - - - - - - - - - - - - - - - 173.63
Lot 3 - - - - - - - - - - - - - - - - - - 173.63
Lot 5 - - - - - - - - - - - - - - - - - - 173.63
Lot 7 - - - - - - - - - - - - - - - - - - 173.63
Lot 9 and Soutij k Lot 11 - - - - - - - - 260.64
North � Lot 11 and all Lot 13 - - - - - - 260.44
Lot 15 - - - - - - - - - - - - - - - - - 173.63
Lot 17 - - - - - - - - - - - - - - - - - 173.63
Lot ' 19 - - - - - - - - - - - - - - - - - 173.63
Lot 21 - - - - - - - - - - - - - - - - - 173.63
Lot 23 - - - - - - - - - - - - - - - - - 173.63
Lot 25 and 27 - - - - - - - - - - - - - 347.25
Lot 29 - - - - - - - - - - - - - - - - - 173.61
Lot 31 - - - - - - - - - - - - - - - - - 173.61
St. John's Military School Campus
in E. M. I. Addition - - - - - - - - - 2,222.41
$5,000."
Section 5. For that part of the cost of curbing, guttering, paving and grading Max
Avenue with two (2) inch hot asphalt mix over a six (6) inch crushed rock base, from the
east line of Quincy Street to the west line of Norton Avenue, which is chargeable against
the private property within the district chargeable therefore, and which cost is hereby
determined to be $6,591.20, there is hereby levied, apportioned and assessed against the
following described lots and pieces of land as provided for in section 1 of this ordinance,
the following amounts:
SOUTHERN VIEW ADDITION
Block 1
South 32.5' Lot 3 and North 44' Lot 4 - - 376.80
South 16' Lot 4 and North 52' Lot 5 - - - 333.11
South 8' Lot 5 and Lot 6 - - - - - - - -- 365.87
Lot ----------- - - - - -- 376.80
Lot 8 - - - - - - - - - - - - - - - - - - 376.80
South 222.5' Lot 9 - - - - - - - - - -- 480.55
CONSOLIDATED-SALINA
1
South 222.5' Lot 10 and Lots 11-12-13
and South 125' Lot 14 - - - - - - - - - 1,346.08
Block 3
Lot 1 - - - - - - - - - - - - - - - - - - 341.30
Lot 2 - - - - - - - - - - - - - - - - - - 319.46
Lot 3 - - - - - - - - - - - - - - - - - - 319.46
Lot 4 - - - - - - - - - - - - - - - - - - 294.88
i
Lot 5 - - - - - - - - - - - - - - - - - - 319.46
Lot 6 - - - - - - - - - - - - - - - - - - 319.46
Lot 7 - - - - - - - - - - - - - - - - - -
319.46
Lot 8 - - - - - - - - - - - - - - - - - - 319.46
Lot 9 - - - - - - - - - - - - - - - - - - 354.95
South 92.5' Lot 19 - - - - - - - - - - - 27.30
$6,591.20
Section 6. For that part of the cost of paving and grading Quincy Street (Thirty-three
(33) feet wide from back of curb to back of curb) with two (2) inch hot asphalt mix over a s
(6) inch crushed rock base, from the south line of Leslie Avenue to the north line of Wayne
Avenue, which is chargeable against the private property within the district chargeable
therefore, and which cost is hereby determined to be $10,733.58, there is hereby levied,
apportioned and assessed against the following described lots and pieces of land as provided
for in Section 1 of this ordinance, the following amounts:
(Approx)East 132' Southl NWk
East of UP Rwy 25-14-3 - - - - - - - - 52359.38
SOUTH FIELD ADDITION
Block 1
Lot
15 - - - - - - - -
- - - - - - - - - 436.14
Lot
16 - - - - - - - -
- - - - - - - - - 373.31
Lot
17 - - - - - - - -
- - - - - - - - - 377.01
Lot
18 - - - - - - - -
- - - - - - - - - 373.31
Lot
19 - - - - - - - -
- - - - - - - - - 377.01
Lot
20 - - - - - - - -
- - - - - - - - - 373.31
Lot
21 - - - - - - - -
- - - - - - - - - 377.01
Lot
22 - - - - - - - -
- - - - - - - - - 373.31
Lot
23 - - - - - - - -
- - - - - - - - - 377.01
Lot
24 - - - - - - - -
- - - -- ----373.31
Lot
25 - - - - - - - -
- - - - - - - - - 377.01
Lot
26 - - - - - - - -
- - - - - - - - - 373.31
Lot
27 - - - - - - - -
- - - - - - - - - 377.01
Lot
28 - - - - - - - -
- - - - - - - - - 436.14
$10,733.58
CONSOLIDATED -SALIVA
1
1
Section 7. Said amounts so levied, apportioned and assessed as aforesaid will be due
and collectible in ten equal installments, the first becoming due with the taxes levied for
the year 1960, and one of said installments falling due each and every year thereafter until
all are paid and all to be collected with interest as in this ordinance provided, HOWEVER,
that the owner of any piece of property liable for any such assessment may redeem his property
from such liability by paying to the City Treasury the entire amount chargeable against the
same, as in this ordinance provided, at any time within thirty days after the publication of!
this ordinance and before the issuance of bonds of said City in payment of the balance of th�
i
cost of said improvements, the property so paid on shall not hereafter be liable for any
further assessments for the cost of said improvements nor for any part of said bonds.
Section 8. There is hereby levied further and assessed against such lots and pieces of
ground described in this ordinance, interest at such rate per annum as shall be borne by the
bonds hereafter to be issued for the payment of the remaining unpaid cost of such improvemen
to be hereafter determined and fixed by ordinance when such bonds are issued on all of said
installments mentioned and provided for in this ordinance, from the date of the bonds which
may be issued at the end of thirty days as specified in the preceding sections hereof, as by
law provided, to the time of the collection of the installments as provided by law, which
said interest shall be collected annually at the same time and in the same manner as said
installment& are collected and after the taking effect of this ordinance and the fixing of
said interest rate when such bonds are authorized and issued, it shall be the duty of the
City Clerk of said City to annually at the same time other taxes are certified and until all
said assessments so apportioned and levied have been certified to the County Clerk of Saline
County, Kansas, a full list of all property liable to assessment and taxation for such work
and improvement, except such property on which the special assessments aforesaid have been
paid in full as hereinbefore provided, together with the respective amounts due on each of
said lots and pieces of ground which amounts shall include the annual installments of such
special assessments with interest for one year at the rate to be fixed as provided for in
this ordinance, on all unpaid balances of said assessments, and such amounts so certified
as herein provided shall be placed upon the tax roll by the County Clerk of Saline County,
Kansas, and collected as other taxes are collected.
Section 9. This ordinance shall take effect and be in full force from and after its
adoption and publication once in the official city paper.
(SEAL)
Attest:
i
City Clerk
Introduced: May 17, 1960
Passed: May 24, 1960
yj
Mayor /
t