ORDINANCE NUMBER 6430
(Published in The Salina Journal , 1960)
AN ORDINANCE ratifying and confirming a contract with Doerfler-Krapff Corporation doing
business as Doerfler-Krapff Construction Company for the construction of Lateral Sanitary
Sewer District 413, and providing for the issuance of Temporary Notes to pay the cosh
thereof, pending the issuance and sale of bonds.
BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas:
Section 1. That the acdeptance of the City of Salina, Kansas, of the proposal of the
Doerfler-Krapff Construction Company, hereinafter referred to as 6he "Contractor" as
submitted to the Board of Commissioners on March 22, 1960, which is hereby found to be
the lowest and best bid for such work, and the contract awarded by the Board of Commissioner
of said City to said contractor and signed on behalf of the City by its Mayor on March 29,
1960 for the construction of certain ptiblic improvements in the City of Salina, Kansas,
to -wit:
Lateral Sewer 413
An 81nch clay pipe sewer, consisting of Lines "A", "B", "C",
'W' "E"I "F" "G" "H" "I" each described as follows:
Line "A"
(1) Beginning at a manhole at the existing sewer in
Hageman Avenue and the extension of the center
line of easement between Lots 1 and 36 of Block 1,
Jarvis Addition
(2) thence west along the center line of utility easement
in said Block 1 to a point 10 feet west of the east
line of Lot 19 of said Block 1, where a manhole will
be built which will be terminus of Line "A".
Line "B"
(1) Beginning at a manhole on Line "A" which is at the
northwest corner of Lot 32 of said Block 1,
(2) thence south to the north corner of Lot 31 of said
Block 1,
(3) thence southwesterly to a point in Tulane Avenue on
line with center line of easement on west line of said
Lot 31,
(4) thence crossing Tulane Avenue to a point opposite the
center line of easement on west line of Lot 1, Block 2
of said Addition,
(5) thence southwesterly along backs of Lots 1 and 19 of
said Block 1 to the northwest corner of said Lot 19,
(6) thence west along north center line of easement in
Block 2 to a point 10 feet west of the east line of
Lot 10 of Block 2 where a manhole will be constructed
and which will be terminus of Line "B".
Line "C".
(1) Beginning at a manhole on Line "B" which is at the
northwest corner of Lot 18, Block 2,
(2) thence southwesterly along the west line of Lots 18,
17, and 16 of said Block 2 to a point in Yale Avenue
directly opposite the center line of easement on back
of said Lots 16, 17, and 18,
(3) thence crossing Yale Avenue to a point directly opposite
the center line of easement on back of Lot 11, Block 3
of said addition,
(4) thence following; the easement along the back of Lots
11, 10, 9, 8, 7, and 6 to a point 10 feet west of the
east line of said Lot 6, where a manhole will be built
which will be terminus of Line "C".
is
CONSOLIDATED-SALINA
n
11
Line I'D":
(1) Beginning at a manhole in Hageman Avenue directly
opposite the easement in the midway of Block 4 of
said addition,
(2) thence southwesterly following the easements along the
Midway of Blocks 4 and 5 to a point 10 feet west of the
east line of Lot 8 of Block 5 of said Addition, where
a manhole will be built which will be the terminus of
Line "D".
Line "E":
(1) Beginning at a manhole in Hageman Avenue directly
opposite the center line of easement in the midway
of Block 6 of said Addition,
(2) thence west and southwesterly following the said
easement along the midway of said Block 6 to a
point 10 feet southwest of the northeast corner of
Lot 5, Block 6, of Jarvis Addition, where a manhole
will be built which will be terminus of Line "E".
Line 'IF". -
(1)
F":(1) Beginning at a manhole in Hageman Avenue and directly
opposite the center line of easement in Block 7,
Jarvis Addition,
(1) thence west and southwesterly following the center line of
said easement to a point 10 feet south of the northeast
corner of Lot 10, Block 7, of Jarvis Addition where a
manhole will be built which will be terminus of Line 'IF".
Line IVI:
(1) Beginning at a manhole in Hageman Avenue which is
directly opposite the center line of easement in Block
7, Jarvis Addition,
(2) thence south along a line 10 feet west of the center
line of said Hageman Avenue to a point directly east of
the center line of easement on the south line of Block 8,
Jarvis Addition.
(3) thence west following the center line of said easement
on south line of said Block 8, to a point 10 feet west
of the east line of Lot 17, in said Block, where a
manhole will be constructed, which will be terminus of
Line IV'.
Line "H"
(1) Beginning at a manhole which is at the south corner of
Lot 7, Block 7, Jarvis Addition,
(2) thence northeasterly along the center line of easement
along the back line of Lot 7 and Lot 6 of said Block 7,
to a point 10 feet northeast of the south corner of said
Block 6, at which point a manhole will be constructed
which will be terminus of Line IIH".
Line "I":
(1) Beginning at a manhole which is at the southwest corner
of Lot 10, Block 8, Jarvis Addition.
(2) thence north on the center line of easement along the
west line of said Let 10, to the northwest corner
thereof where a manhole will be built which will be
terminus of Line "I" and also the terminus of Lateral
413.
at and for the unit price for said work contained in said proposal, which proposal and
contract are hereby referred to and made part of this ordinance, be and the same is
hereby ratified and confirmed, said proposal being within the estimated cost of said
improvements as shown by the sworn estimates of the City Engineer on file in -the Office of
the City Clerk which estimate is hereby referred to and made a part of this ordinance.
Section 2. Said improvements shall be built and constructed in accordance with the
plans and specifications therefore prepared by the City Engineer on file in the office of
the City Clerk and in accordance with the proposals of said contractor and under the terms
of said contract, all of which are hereby referred to and made a part of this ordinance.
CONSOLIDATED -SALIVA
�J
1
Section 3. That temporary notes signed by the Mayor and attest by the City Clerk be
issued from time to time as the work progresses in the manner and form as required by law,
the total amount thereof not to exceed the amount of $ 3 C, l/ i= .11D for such work, such
notes to bear interest at not to exceed 5 per cent per annum and to mature not later than
December 1, 1961, and to be issued in such amounts and at such times as may the money for
the payment of the cost of such work be required, such notes to be issued to said contractor
and to be redeemed and cancelled at the time that Internal Improvement Bonds are issued
in lieu thereof.
Section 4. That this ordinance shall take effect and be in full force from and after
its adoption and publication once in the official city paper.
(SEAL)
Attest:
City Clerk
Introduced: March 22, 1960
Passed: March 29, 1960
Mayor
Acting