ORDINANCE NUMBER 6406
(Published in The Salina Journal oyiQ 1960)
AN ORDINANCE ratifying and confirming a contract with Brown and Brown Construction Company,
Inc. for the construction of South Ohio Street Smoky Hill River Crossing as designated
and authorized by Resolution Number 2284, and providing for the issuance of temporary
notes to pay the cost thereof, pending the issuance and sale of bonds.
BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas:
Section 1. That the acceptance of the City of Salina, of the proposal of the Brown and
Brown Construction Company, Inc. hereinafter referred to as the "Contractor" as submitted
to the Board of Commissioners on January 12, 1960, in the amount of $20,970.00 which
is hereby found to be the lowest and best bid for such work, and the contract awarded by
the Board of Commissioners of said City to said contractor and signed on behalf of the City
by its Mayor on January 19, 1960, for the construction of certain public improvements in
the City of Salina, Kansas, to -wit:
1. Work to be done consists of furnishing all labor, construction equipment,
materials, and performing all operations required to construct the
South Ohio Street Smoky Hill River Crossing, including construction
of temporary dikes, dewatering the construction site, stabilizing
the pipe bed, installation of drainage pipe, construction of
compacted fill and all other work not shown or specified but
essential to the proper completion of the project, including
precautionary work necessary for the protection of workmen,
general public and new and existing structures.
2. The site of the work is located within the city limits of
Salina, Kansas, approximately 1,000 feet north of the intersection
of East Crawford and South Ohio Street.
3. The drawings governing and controlling the work and to
which reference is made throughout these specifications
consists of two sheets dated November 1959, identified under
Project No. 155-86H, titled and indexed as follows:
1. Location Map
2. Plan and Details
at and for the unit price for said work contained in said proposal, which proposal and
contract are hereby referred to and made a part of this ordinance, be and the same is
hereby ratified and confirmed, said proposal being within the estimated cost of said
improvements as shown by the sworn estimate of the City Engineer on file in the office of
the City Clerk which estimate is hereby referred to and made a part of this ordinance.
Section 2. Said improvements shall be built and constructed in accordance with the
plans and specifications therefore prepared by the City Engineer on file in the office
of the City Clerk and in accordance with the proposal of said contractor and under the
terms of said contract, all of which are hereby referred to and made a part of this
ordinance.
Section 3. That temporary notes signed by the Mayor and attest by the City Clerk be
issued from time to time as the work progresses in the manner and form as required by law,
the total amount thereof not to exceed the amount of $20,970.00 for such work, such notes
to bear interest at not to exceed 5 per cent per annum and to mature not later than April
1, 1961, and to be issued in such amounts and at such times as may the money for the
CONSOLIDATED-SALINA
1
J
payment of the cost of such work be required, such notes to be issued to said contractor
I,
and to be redeemed and cancelled at the time that Internal Improvement Bonds are
i
issued in lieu thereof.
i
i
Section 4. That this ordinance shall take effect and be in full force from and after
its publication once in the official city paper.
Introduced: January 12, 1960
I
Passed: January 19, 1960