Loading...
6558 Street ImprovementsCONSOLIDATED-SALINA 11 1 ORDINANCE NUMBER 6558 (Published in The Salina Journal i % , 1961) AN ORDINANCE ratifying and confirming a contract with the 0. D. Wilmoth Construction Company for the construction of certain improvements on certain streets in the City of Salina, Kansas, and providing for the issuance of temporary notes to pay the cost thereof pending the issuance and sale of bonds. BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas: Section 1. That the acceptance by the City of Salina, Kansas, of the proposal of the 0. D. W ilmoth Construction Company hereinafter referred to as the "Contractor" as submitted to the Board of Commissioners on July 25, 1961, which is hereby found to be the lowest and best bid for such work, and the contract awarded by the Board of Commissioners of the City of Salina, to said contractor and signed on behalf of the City by its Mayor on August 1, 196: for the construction of certain public improvements in the City of Salina, Kansas, to -wit: The paving and grading of Alley with concrete (Sixteen (16) feet wide) first north of Wayne Avenue from Roach Street to Lewis Street. The paving and grading of Antrim Avenue with concrete (Thirty- three (33) feet wide from back of curb to back of curb) from the west side of Tenth Street to the west line of Eleventh Street. The curbing, guttering, paving and grading of East Ash Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the east side of Ohio Street to the east line of Riverside Drive. The curbing, guttering, paving and grading of Barney Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the north line of Broadway Boulevard to the south line of Grand Avenue. The curbing and guttering one side, and the paving and grading of Beverly Drive with concrete (Twenty-eight (28) feet wide from toe of gutter to toe of gutter) from the west line of Whittinghill Avenue to the west line of Viemont Avenue. The Curbing, guttering, paving and grading of Channel Road with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of Iron Avenue to the north edge of Upper Mill Drive. The curbing, guttering, paving and grading of DuVall Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the west line of Broadway Boulevard to the south line of Crawford Avenue. The curbing, guttering, paving and grading of Eastborough Road with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of Country Club Road to the south line of Crestview Drive. The paving and grading of Front Street with concrete (Thirty- three (33) feet wide from back of curb to back of curb) from the south line of Lincoln Avenue to the south line of the Union Pacific right-of-way. The curbing, guttering, paving and grading of Francis Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of York Avenue south 127 feet. The paving and grading of Funston Avenue with concrete (Twenty- six (26) feet wide from toe of gutter to toe of gutter) from the south line of Ellsworth Street to the north line of Jewell Avenue. CONSOLIDATED-SALINA 1 u The curbing, guttering, paving and grading of Fourth Street with concrete on both sides of Union Pacific Tracks, each 30 feet wide from back of curb to edge of slab, from the south line of C laf 1 in Avenue to the north side of Cloud Street. The curbing, guttering, paving and grading of the East side of Fourth Street with concrete (Thirty -30-- feet wide from back of Qurb to edge of pavement) from the north line of Bond Street to the south line of Wilson Street. The curbing, guttering, paving and grading of the East side of Fourth Street with concrete (Twenty-two (22) feet wide from edge of slab to back of curb) from the south side of Republic Avenue to the north side of Beloit Avenue. The paving and grading of Fourth Street on the East side of tracks with concrete (Twenty (20) feet wide from back of curb to edge of slab) from the south line of Lot 8 on Fourth Street of Jones Addition to the north line of Lincoln Avenue. The Paving and grading of Fourth Street on the East side of tracks with concrete (Twenty (20) feet wide from back of curb to edge of slab) from the south line of Lamar Street to the north line of Republic Avenue. The curbing, guttering, paving and grading of the East side of Fourth Street with concrete (Thirty (30) feet wide from back of curb to the edge of pavement) from the south line of Wilson Street to the south line of Lamar Street. The paving and grading of Indiana Avenue with concrete (Thirty- three (33) feet wide from back of curb to back of curb) from the south line of Gypsum Avenue to the south line of Stack Avenue. The paving and grading of Kansas Avenue with concrete (Twenty-- eight (28) feet wide from toe of gutter to toe of gutter) from the north line of Elm Street to the south line of Riverside Boulevard. The curbing, guttering, paving and grading of Lewis Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the north line of Millwood Avenue to the south line of Crawford Avenue. The paving and grading of Lincoln Avenue with concrete (Thirty- three (33) feet wide from back of curb to back of curb) from the east line of Fourth Street to the west line of Third Street. The paving and grading of Oakdale Avenue with concrete (Twenty- eight (28) feet wide from edge of curb to edge of curb) from the east end of Smoky Hill River Bridge East 900 feet more or less too west edge of existing paving. The curbing, guttering, paving and grading of Ohio Street with concrete (Forty (40) feet wide from back of curb to back of curb) from the north line of Ash Street to the north line of Elm Street. The paving and grading of Pershing Street with concrete (Twenty- seven (27) feet wide from toe of gutter to toe of gutter) from the south line of Beloit Street to the north line of Sunset Drive. The paving and grading of Pershing Street with concrete (Twenty- seven (27) feet wide from toe of gutter to toe of gutter) from the south line of Sunset Drive to the north line of Ellsworth Street. The paving and grading of Republic Avenue with concrete (Twenty- eight (28) feet wide from toe of gutter to toe of gutter) from the west line of Funston Avenue to the east line of the Missouri Pacific Railroad. The paving and grading of Stapler Avenue with concrete (Twenty- eight (28) feet wide from toe of gutter to toe of gutter) from the east line of Delaware Avenue to the west line of Indiana Avenue. CONSOLIDA?ED-SALINA F, Fj 1 The curbing, guttering, paving and grading of Stack Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the west side of Missouri Avenue to the east side of Indiana Avenue. The curbing, guttering, paving and grading of Seventh Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south property line of Lincoln Avenue to the north right-of-way line of the Union Pacific Railroad. The paving and grading of Sauth Second Street with concrete (Twenty-eight (28) feet wide from edge of gutter to edge of gutter) from 150 feet south of Wilson Street to a point 23 feet north of the south line of Lot 15, Block 6, Hutchinson's Addition. The curbing, guttering, paving and grading of South Second Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from a point 23 feet north of the south line of Lot 15, Block 7, Hutchinson's Addition to the south line of Lot 19 of said block. The curbing, guttering, paving and grading of Wayne Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the east line of Ohio Street to the west line of Huntington Road. at and for the unit price for said work contained in said proposal, which proposal and contract are hereby referred to and made parts of this ordinance, be and the same is hereby ratified and confirmed, said proposal being within the estimated cost of said improvements as shown by the sworn estimates of the City Engineer on file in the Office of the City Clerk, which estimates are hereby referred to and made a part of this ordinance. Section 2. Said improvements shall be built and constructed in accordance with the plans and specifications therefore prepared by the City Engineer on file in the Office of the City Clerk and in accordance with the proposal of said contractor and under the terms of said contract, all of which are hereby referred to and made a part of this ordinance. Section 3. That temporary notes signed by the Mayor and attest by the City Clerk be issued from time to time as the work progresses in the manner and form as required by law, the total amount thereof not to exceed the amount of $354,517.10 for such work, such notes to bear interest not to exceed 5 per cent per annum and to mature not later than December 13, 19632 and to be issued in such amounts and at such times as money for the payment of the cost of such notes being issued to said contractor and to be redeemed and cancelled at the time that permanent bonds are issued in lieu thereof. Section 4. That this ordinance shall take effect and be in full force from and after its adoption and publication once in the official city paper. (SEAL) Attest: City Clerk Introduced: July 25, 1961 Passed: August 1, 1961 Mayor