Loading...
6679 Levy AssessmentsCONSOLIDATED-SALINA u ORDINANCE NUMBER (Published in The Salina Journal J 041 1962) AN ORDINANCE relating to and apportioning and levying special assessments on certain lots and pieces of ground in the City of Salina, Kansas, to pay the cost of paving and grading of Alley with concrete (Sixteen (16) feet wide) first north of Wayne Avenue from Roach Street to Lewis Street; paving and grading of Antrim Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the west side of Tenth Street to the west line of Eleventh Street; curbing, guttering, paving and grading of East Ash Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the east side of Ohio Street to the east line of Riverside Drive; curbing, guttering, paving and grading of Barney Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the north line of Broadway Boulevard to the south line of Grand Avenue,I curbing and guttering one side, and the paving and grading of Beverly Drive with concrete (Twenty-eight (28) feet wide from toe of gutter to toe of gutter) from the west line of Whittinghill Avenue to the west line of Viemont Avenue; curbing, guttering, paving and grading of DuVall Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the west line of Broadway Boulevard to the south line of Crawford Avenue; curbing, guttering, paving and grading of Eastborough Road with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of Country Club Road to the south line of Crestview Drive; curbing, guttering, paving and grading of Channel Road with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of Iron Avenue to the north edge of Upper Mill Drive; paving and grading of Front Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) From the south line of Lincoln Avenue to the south line of the Union Pacific right-of-way; curbing, guttering, paving and grading of Francis Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of York Avenue south 127 feet; paving and grading of Funston Avenue with concrete (Twenty-six (26) feet wide from toe of gutter to toe of gutter) from the south line of Ellsworth Street to the north line of Jewell Avenue; curbing, guttering, paving and grading of Fourth Street with concrete on both sides of Union Pacific Tracks, each 30 feet wide from back of curb to edge of slab, from the south line of Claflin Avenue to the north side of Cloud Street; curbing, guttering, paving and grading of The East side of Fourth Street with concrete (Thirty (30) feet wide from back of curb to edge of pavement) from the north line of Bond Street to the south line of Wilson Street; curbing, guttering, paving and grading of The East side of Fourth Street with concrete (Twenty-two (22) feet wide from edge of slab to back of curb) from the south side of Republic Avenue to the north side of Beloit Avenue; paving and grading of Fourth Street on the East side of Tracks with concrete (Twenty (20) feet wide from back of curb to edge of slab) from the south line of Lot 8 on Fourth Street of Jones Addition to the north line of Lincoln Avenue; paving and grading of Fourth Street on the East side of Tracks with concrete (Twenty (20) feet wide from back of curb to edge of slab) from the south line of Lamar Street to the north line of Republic Avenue; curbing, guttering, paving and grading of the East side of Fourth Street with concrete (Thirty (30) feet wide from back of curb to the edge of pavement) from the south line of Wilson Street to the south line of Lamar Street; paving and grading of Indiana Avenue with concrete (Thirty- three (33) feet wide from back of curb to back of curb) from the south line of Gypsum Avenue to the south line of Stack Avenue; paving and grading of Kansas Avenue with concrete (Twenty-eight (28) feet wide from toe of gutter to toe of gutter) from the north line of Elm Street to the south line of Riverside Boulevard; curbing, guttering, paving and grading of Lewis Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the north line of Millwood Avenue to the south line of Crawford Avenue; paving and grading of Lincoln Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the east line of Fourth Street to the west line of Third Street; paving and grading of Oakdale Avenue with concrete (Twenty-eight (28) feet wide from edge of curb to edge of curb) from the east end of Smoky Hill River Bridge East 900 feet more or less to west edge of existing paving; curbing, guttering, paving and grading of Ohio Street with concrete (Forty (40) feet wide from back of curb to back of curb) from the north line of Ash Street to the north line of Elm Street; paving and grading of Pershing Street with concrete (Twenty-seven (27) feet wide from toe of gutter to toe of gutter) from the south line of Beloit Street to the north line of Sunset Drive; paving and grading of Pershing Street with concrete (Twenty-seven (27) feet wide from toe of gutter to toe of gutter) from the south line of Sunset Drive to the north line of Ellsworth Street; paving and grading of Republic Avenue with concrete (Twenty-eight (28) feet wide from toe of gutter to toe of gutter) from the west line of Funston Avenue to the east line of the Missouri Pacific Railroad; paving and grading of Stapler Avenue with concrete (Twenty-eight (28) j feet wide from toe of gutter to toe of gutter) from the east line of Delaware Avenue to the west line of Indiana Avenue; curbing, guttering, paving and grading of Stack Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the west side of Missouri Avenue to the east side of Indiana Avenue; curbing, guttering, paving and grading of Seventh Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south property line of Lincoln Avenue to the north right- of-way line of the Union Pacific Railroad; paving and grading of South Second Street with concrete (Twenty-eight (28) feet wide from edge of gutter to edge of gutter) from 150 feet south of Wilson Street to a point 23 feet north of the south line of Lot 15, Block 6, 1 Hutchinson's Addition; curbing, guttering, paving and grading of South Second Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from a point 23 feet north of the south line of Lot 15, Block 7 Hutchinson's Addition to the south line of Lot 19 of said Block; curbing, guttering, paving and grading of Wayne Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the east line of Ohio Street to the west line of Huntington Road; and relating to and providing for the collection) and payment of such assessments: CONSOLIDATED-SALINA i 1 i BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas: � i Section 1. For the purpose of paying for that part of the cost of improvements in I certain portions of certain streets as hereinafter set forth in the following sections of this ordinance, which is chargeable to the private property in the assessment districts i i for each of such improvements, respectively, as set forth in the following sections of this ordinance with respect to each of such improvements, there is hereby levied and assessed I on the property liable therefore, being all the lots and pieces of land lying on either side of said streets so improved, respectively, to the middle of the block for the distance improved with respect to the improvements mentioned in Sections 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 of this ordinance, according to the appraised value of such lots and pieces of ground with respect to each such improvement, without regard to the buildings or improvements thereon, special assessments covering the cost of such work and improvements, said special assessmentsi being based on the special valuation and appraisement of said lots and pieces of ground therefore made by three disinterested appraisers appointed by the Board of Commissioners of the City of Salina, Kansas, with respect to each such improvement which said appraisements, are hereby referred to and made a part of this ordinance, and the several amounts so levied, apportioned and assessed against the lots and pieces of ground for each such improvement, respectively, for the purpose aforesaid, are hereby found and determined to be the amounts set forth in the following sections of this ordinance with respect to each of such improvements. Section 2. For that part of the cost of paving and grading of Alley with concrete (Sixteen (16) feet wide) first north of Wayne Avenue from Roach Street to Lewis Street, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $4,015.93, there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: SHALIMAR PLAZA ADDITION Block 3 i Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 275.77 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 241.30 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 241.30 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 241.30 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 241.30 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 241.30 Lot ------------------- - - - - -- 241.30 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 284.39 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 284.39 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 241.30 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 241.30 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 241.30 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 241.30 CONSOLIDATED-SALINA 1 L� TUCKER PARK ADDITION Block 2 Lot 11 Less W 2' - - - - - - - - - - - - - - - - - - - 269.18 W 45' Lot 12 Plus W 2' Lot 11 - - - - - - - - - - - - - 137.65 406.83 REIMOLD'S ADDITION N 10' Lot 29 - - - - - - - - - - - - - - - - - - - - - 20.39 Lot 30 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 31 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 32 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 33 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 N 36' Lots 34-35-36 - - - - - - - - - - - - - - - - - - 73.41 N 38' S 64' Lots 34-35-36 - - - - - - - - - - - - - - - 77.49 S 26' Lots 34-35-36 Plus 10' Pt Vac Antrim - - - - - - 83.61 581.18 MILITARY ADDITION Block 48 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lots 18 & 20 - - - - - - - - - - - - - - - - - - - - - 173.35 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 91.78 836.12 Section 4. For that part of the cost of curbing, guttering, paving and grading of East Ash Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the east side of Ohio Street to the east line of Riverside Drive, which is chargeable against the private property within the district chargeable therefore, and which Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 241.30 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 241.30 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 275.78 4,015.93 Section 3. For that part of the cost of paving and grading of Antrim Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the west side of Tenth Street to the west line of Eleventh Street, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to I be $1,824.13 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: 1 L� TUCKER PARK ADDITION Block 2 Lot 11 Less W 2' - - - - - - - - - - - - - - - - - - - 269.18 W 45' Lot 12 Plus W 2' Lot 11 - - - - - - - - - - - - - 137.65 406.83 REIMOLD'S ADDITION N 10' Lot 29 - - - - - - - - - - - - - - - - - - - - - 20.39 Lot 30 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 31 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 32 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 33 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 N 36' Lots 34-35-36 - - - - - - - - - - - - - - - - - - 73.41 N 38' S 64' Lots 34-35-36 - - - - - - - - - - - - - - - 77.49 S 26' Lots 34-35-36 Plus 10' Pt Vac Antrim - - - - - - 83.61 581.18 MILITARY ADDITION Block 48 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 81.57 Lots 18 & 20 - - - - - - - - - - - - - - - - - - - - - 173.35 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 91.78 836.12 Section 4. For that part of the cost of curbing, guttering, paving and grading of East Ash Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the east side of Ohio Street to the east line of Riverside Drive, which is chargeable against the private property within the district chargeable therefore, and which CONSOLIDATED-SALINA cost is hereby determined to be $6,154.17, there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: I RIVERVIEW ADDITION j Block 2 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 437.04 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - 407.91 i i Lot 9-10 - - - - - - - - - - - - - - - - - - - - - - - 815.80 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 407.91 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 407.91 Lots 13 & 14 Less Riverside Dr. - - - - - - - - - - - - I 524.45 , I, 3,001.02 i I RICHOLSON'S REPLAT OF PT. OF RIVERVIEW ADDITION Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 315.32 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 292.79 I I Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - ' 292.79 I Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 292.79 1,193.69 RIVERVIEW ADDITION Block 3 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 315.32 j Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 315.32 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 315.32 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 315.32 j Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 315.32 Lot 9 & 10 Less Riverside Dr. - - - - - - - - - - - - - 382.86 I � I 1,959.46 Section 5. For that part of the cost of curbing, guttering, paving and grading of Barney Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the north line of Broadway Boulevard to the south line of Grand Avenue, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $5,252.56 there is hereby levied, apportioned and assessed I against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: NORTH PARK ADDITION Block 1 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 129.67 Lots 6-8-10-12-14-16 - - - - - - - - - - - - - - - - - 833.61 II Lots 18 & 20 - - - - - - - - - - - - - - - - - - - - - 370.50 Lots 22 & 24 - - - - - - - - - - - - - - - - - - - - - 370.50 Lots 26-28-30 - - - - - - - - - - - - - - - - - - - - - 555.74 I I ' Lots 32 & 34 Less Hwy - - - - - - - - - - - - - - - - - 370.50 11 D 1 CONSOLIDATED-SALINA Lots 36-38-40-42 Less Hwy - - - - - - - - - - - - - - - NORTH PARK ADDITION Block 2 370.50 3,001.02 Lots 1-3-5-7-9-11 - - - - - - - - - - - - - - - - - - 1,173.88 Lots 13-15-17-19-21-23 Less Hwy - - - - - - - - - - - 1,077.66 2,251.54 Section 6. For that part of the cost of curbing and guttering one side, and the paving and grading of Beverly Drive with concrete (Twenty-eight (28) feet wide from toe of gutter to toe of gutter) from the west line of Whittinghill Avenue to the west line of Viemont Avenue, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $2,894.59 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: VANDERBILT ADDITION E 18.7' Lot 3 - - - - - - - - - - - - - - - - - - - - - 119.36 W 41.3' Lot 3 - - - - - - - - - - - - - - - - - - - - - 264.30 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 379.40 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 366.60 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 298.40 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 127.89 1,555.95 WEST HAVEN 1ST ADDITION Block 3 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 178.19 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 159.90 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 178.19 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 137.06 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 137.06 i Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 137.06 i Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 137.06 I j Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 137.06 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 137.06 1,338.64 Section 7. For that part of the cost of curbing, guttering, paving and grading of DuVall Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) i from the west line of Broadway Boulevard to the south line of Crawford Avenue, which is i chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $12,773.86 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of j this ordinance the following amounts: CONSOLIDATED-SALINA 1 1 1 BANKER ADDITION Blk 1 Plus Vac Banker St., DuVall Ave. & Broadway Place & Less Tr to General Public for Street - - - - - - - - 6,131.45 i Blk 2 Plus Adj Vac Broadway Place - - - - - - - - - - - 6,642.41 12,773.86 Section 8. For that part of the cost of curbing, guttering, paving and grading of Eastborough Road with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of Country Club Road to the south line of Crestview Drive, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $9,682.64 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: REPLAT COUNTRY CLUB HEIGHTS ADDITION NO. 2 Block 3 E 43' Lot 2 - - - - - - - - - - - - - - - - - - - - - - 298.39 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 641.89 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 693.93 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 589.84 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 624.54 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 624.54 Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 572.50 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 572.50 4,618.13 NEI 17-14-2 - - - - - - - - - - - - - - - - - - - - - - 5,064.51 Section 9. For that part of the cost of curbing, guttering, paving and grading of Channel Road with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of Iron Avenue to the north edge of Upper Mill Drive, which is i chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $39,958.93 there is hereby levied, apportioned and assessed it against the following described lots and pieces of land as provided for in Section 1 of lI this ordinance, the following amounts: SURVEYOR'S PLAT NO. 49 E 189.35' Lot 2 - - - - - - - - - - - - - - - - - - - - 538.53 E 125' of W. 242.5' Lot 2 - - - - - - - - - - - - - - - 355.85 W 117.5' Lot 2 - - - - - - - - - - - - - - - - - - - - 334.92 Beg. SW Corner Lot 2 W 150' N 275' E 150' S. to Beg - - 428.16 Beg. at a point 150' W of SW corner Lot 2 W 15' N 275' E 15' S 275' to Beg.- - - - - - - - - - - - - - - - - - 41.86 Beg. at a point 165' W of SW corner Lot 2 W 421.67' N. 275' E 421.67' S 275' to Beg. - - - - - - - - - - - - - 1,202.65 2,901.97 CONSOLIDATED-SALINA Il 1 1 MILLVIEW ADDITION Block 1 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 237.87 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 215.03 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 215.03 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 215.03 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 215.03 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 215.03 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 228.35 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 266.41 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 266.41 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 256.90 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 256.90 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 275.92 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 275.92 Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 266.41 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 285.44 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 285.44 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 285.44 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 285.44 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 285.44 Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 275.92 5,109.36 Block 2 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 256.90 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 285.44 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 285.44 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 285.44 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 285.44 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 313.98 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 313.98 Lot 8 - - - - - - - - - - - - -- - - - - - - - - - - - - 285.44 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 285.44 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 256.90 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 256.90 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 228.35 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 237.87 3,577.52 MOUNT BARBARA ADDITION Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 342.53 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 270.22 CONSOLIDATED-SALINA [i 1 1 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 270.22 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 270.22 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 270.22 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 270.22 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 285.44 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 371.07 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 371.07 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 285.44 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 270.22 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 270.22 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 270.22 j Lot 14 i - - - - - - - - - - - - - - - - - - - - - - - - 256.90 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 256.90 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 256.90 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 342.53 4,930.54 MOUNT BARBARA PARK ADDITION REPLAT LOT 1 Pt Lot 1 - - - - - - - - - - - - - - - - - - - - - - - 1,141.74 SURVEYOR'S PLAT 34 Triangle tract in Lot 2, So. & E. of Channel Rd. - - - 570.88 Tract in Lot 2, So. & E. of Channel Rd. 240'--x 160' - - 475.73 Tract in Lot 2, 378' x 200' Plus 40' Strip along So. line of Lot 2 to Channel Rd . - - - - - - - - - - - - - - - - 1,046.61 West side Channel Road - - - - - - - - - - - - - - - - 20,204.58 22,297.80 Section 10. For that part of the cost of paving and grading of Front Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of Lincoln Avenue to the south line of the Union Pacific right-of-way, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $6,826.05 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: JONES ADDITION All Railroad Reserve So. of UPRR to Railroad Ave. - - - 564.12 Lots 25-26-27-28 Front St. - - - - - - - - - - - - - - 887.78 Lots 23-22 Less RR & Lot 24 Front St. - - - - - - - - - 238.18 1,690.08 MORRIS ADDITION Block 4 Lots 1-17 Alt. - - - - - - - - - - - - - - - - - - - - 1,880.41 Block 13 Lots 23-25-27 Less RR 561.06 CONSOLIDATED-SALINA 1 �J Lots 1-19 Inc. Block 13 Morris Add. Lots 16-21 Inc. Front St. Jones Add. - - - - - - - - - - 2,694.50 Section 11. For that part of the cost of curbing, guttering, paving and grading of Francis Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of York Avenue south 127 feet, which is chargeable against the private I property within the district chargeable therefore, and which cost is hereby determined to be $1,903.33 there is hereby levied, apportioned and assessed against the following describedl�; i i lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts) EAST GARDENS ADDITION N 32' Less W 300' Lot 10 & 11 Less W 300' - - - - - - - 171.28 W 300' N 32' Lot 10 & W 300' Lot 11 - - - - - - - - - - - 1,154.70 Lot 19 & N 32' Lot 20 - - - - - - - - - - - - - - - - - 577.35 1,903.33 Section 12. For that part of the cost of paving and grading of Funston Avenue with concrete (Twenty-six (26) feet wide from toe of gutter to toe of gutter) from the south line of Ellsworth Street to the north line of Jewell Avenue, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $2,978.75 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance the following amounts: HIGHLAND COURT ADDITION Block 14 W 25' Lot 3 - - - - - - - - - - - - - - - - - - - - - - 106.21 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 212.42 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 233.67 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 233.67 Lot 7 - - - - - - ._ - - - - - - - - - - - - - - - - - - 212.42 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 212.42 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 212.42 W 22.5' Lot 10 - - - - - - - - - - - - - - - - - - - - 95.60 1,518.83 Block 16 S 24' Lot 7 - - - - - - - - - - - - - - - - - - - - - - 127.88 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 261.08 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 261.08 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 261.08 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 261.08 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 287.72 1,459.92 Section 13. For that part of the cost of curbing, guttering, paving and grading of Fourth Street with concrete on both sides of Union Pacific Tracks, each 30 feet wide from CONSOLIDATED-SALINA 1 1 back of curb to edge of slab, from the south line of Claflin Avenue to the north side of Cloud Street, which is chargeable against the private property within the district chargeable' therefore, and which cost is hereby determined to be $10,286.87 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: ADDITION TO GROUNDS OF KWU ADDITION Lots 1-19 Alt. Russell Ave. & Lots 2-20 Alt. Cloud Ave. 2,571.72 Ii Lots 1-19 Alt. Claflin Ave. & Lots 2-20 Alt. Russell Ave 2,571.71 5,143.43 GROUNDS OF KWU ADDITION Campus Santa Fe Ave. - - - - - - - - - - - - - - - - - 5,143.44 Section 14. For that part of the cost of curbing, guttering, paving and grading of The East side of Fourth Street with concrete (Thirty (30) feet wide from back of curb to edge of pavement) from the north line of Bond Street to the south line of Wilson Street, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $6,495.78 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: COLLEGE VIEW ADDITION Block 1 S 50' Lot 1 & S 50' W 44' Lot 3 - - - - - - - - - - - - 229.60 N 70' W 94' Lot 1 Plat F & N 5' S 55' Lot 1 & N 5' S 55' W 44' Lot 3 - - - - - - - - - - - - - - - - - - - - - - 367.36 N 70' E. 41' Lot 1 Plat F & E 6' S 55' Lot 3 & All Lot 5 257.15 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 252.56 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 229.60 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 229.60 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 229.60 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 229.60 W 25' Lot 9 - - - - - - - - - - - - - - - - - - - - - - 114.80 W 25' Lot 10 - - - - - - - - - - - - - - - - - - - - - 114 80 2,254.67 Block 3 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 269.58 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 269.58 Lot I 3 - - - - - - - - - - - - - - - - - - - - - - - - - 245.07 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 245.07 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 245.07 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 245.07 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 245.07 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 245.07 CONSOLIDATED-SALINA C W 25' Lot 9 - - - - - - - - - - - - - - - - - - - - - - 122.54 W 25' Lot 10 - - - - - - - - - - - - - - - - - - - - - 122.55 2,254.67 Block 5 j Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 237.50 Lot 2 Plus 10' Accreted St. - - - - - - - - - - - - - - 237.50 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 215.92 Lot 4 Plus 10' Accreted St. - - - - - - - - - - - - - - 215.92 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 215.92 Lot 6 Plus 10' Accreted St. - - - - - - - - - - - - - - 215.92 Lot 7 - - - - -- - - - - - - - - - - - - - - - - - - - - 215.92 Lot 8 & W 122' Lot 10 Plus 10' Accreted St. - - - - - - 269.90 W 25' Lot 9 - - - - - - - - - - - - - - - - - - - - - - 107.96 E 122' of W 25' Lot 10 - - - - - - - - - - - - - - - - 53.98 1,986.44 Section 15. For that part of the cost of curbing, guttering, paving and grading of the East side of Fourth Street with concrete (Twenty-two (22) feet wide from edge of slab to back of curb) from the south side of Republic Avenue to the north side of Beloit Avenue, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $2,165.90 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: ADDITION TO GROUNDS OF KWU ADDITION REPUBLIC STREET Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 233.58 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 212.34 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - 212.34 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 212.34 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 212.34 1,082.94 BELOIT STREET Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 233.58 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 212.34 Lot 6&A Lot 8 - - - - - - - - - - - - - - - - - -- 318.52 i E2 Lot 8 & All Lot 10 - - - - - - - - - - - - - - - - - 318.52 1,082.96 j Section 16. For that part of the cost of paving and grading of Fourth Street on the j East side of tracks with concrete (Twenty (20) feet wide from back of curb to edge of slab) from the south line of Lot 8 on Fourth Street of Jones Addition to the north line of Lincoln Avenue, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $2,482.37 there is hereby levied, 1 J 1 CO�NpS�OLIDATED-SALINA I I apportioned and assessed against the following described lots and pieces of land as provided i for in Section 1 of this ordinance, the following amounts: JONES ADDITION FOURTH STREET I Lot 10 Less RR - - - - - - - - - - - - - - - - - - - - 129.29 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 258,58 Lots 14 & 16 - - - - - - - - - - - - - - - - - - - - - 517.16 Lots 18-20-22 - - - - - - - - - - - - - - - - - - - - - 775.74 Lot 24 - - - - - - - - - - - - - - - - - - - - - - - - 258.58 Lots 26 & 28 - - - - - - - - - - - - - - - - - - - - - 543.02 2,482.37 Section 17. For that part of the cost of paving and grading of Fourth Street on the East side of Tracks with concrete (Twenty (20) feet wide from back of curb to edge of slab) from the south line of Lamar Street to the north line of Republic Avenue, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $4,034.47 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: HUTCHINSON ADDITION Block 3 Lot 1 Except S 351311 - - - - - - - - - - - - - - - - - 509.62 I i Lot 2 Except S 35'3 -- - - - - - - - - - - - - - - - - - 409.24 S 35'3" Lots 1 & 2 - - - - - - - - - - - - - - - - - - 270.25 i W 26.5' Lot 3 - - - - - - - - - - - - - - - - - - - - - 204.62 1,393.73 SUNNYSIDE ADDITION REPLAT BLOCKS 4-5 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 517.34 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 328.16 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 328.16 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 366.77 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 366.77 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 366.77 Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 366.77 2,640.74 Section 18. For that part of the cost of curbing, guttering, paving and grading of the East side of Fourth Street with concrete (Thirty (30) feet wide from back of curb to edge of pavement) from the south line of Wilson Street to the south line of Lamar Street, which is chargeable against the private property within the district chargeable therefore, I and which cost is hereby determined to be $2,648.47 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section i 1 of this ordinance, the following amounts: CONSOLIDATED -SAUNA i i II 1 1 -- - -- - _- - -- -- - _ =- - - - - - - - 249.80 E 85' Lot 4 - - - - - - - - - - - - - - - - - - - - - - 249.80 Lot 6 - - - - - - - - - - - - - - --- -- - - - - -- 297.38 Lot 8 - - - - - - - - - - _ - - - - - - - - - - - - - - 297.38 Lot 10 - - - - - - - - - - - - - - - - - - - - - - -- 297.38 Lot 12 - - - - - - - - - - - - - - - - - - - - - - -- 297.38 Lot 14 - - - - - - - - - - - - - - - - - - - - - - -- 297.38 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 20 - - - - - - - - - - - - - - - - i - - - - - - - - 297.38 Lot 22 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 24 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 26 - - - - - - - - - - - - - - - - - - - - - - -- 297.38 Lot 28 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 30 - - -------------- -- - - - - -- 297.38 Lot 32 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 34 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 36 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 E 98' Lot 38 & 40 - - - - - - - - - - - - - - - - - - - 297.38 W 67' Lot 38 & 40 - - - - - - - - - - - - - - - - - - - 208.20 6,2.39.08 Block 4 E 822' Lot 1 - - - - - - - - - - - - - - - - - - - - - 237.91 W 822' Lot 1 - - - - - - - - - - - - - - - - - - - - - 249.80 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 21 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 23 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 25 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 27 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 29 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 31 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 Lot 33 - - - - - - - - - - - - - - - - - - - - - - - - 297.38 CONSOLIDATED-SALINA 1 1 Lots 34 & 35 Less Riverside Blvd. - - - - - - - - - - - 386.60 i 5,632.39 I Section 21. For that part of the cost of curbing, guttering, paving and grading of Lewis Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the north line of Millwood Avenue to the south line of Crawford Avenue, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $6,485.16 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: RIKER ADDITION Block 1 W 41' Lot 5 - - - - - - - - - - - - - - - - - - - - - - 127.02 W 50' Lot 6 Plus E 32' Lot 5 - - - - - - - - - - - - - 254.08 E 23' Lot 6 & W 60' Lot 7 - - - - - - - - - - - - - - - 257.18 E 15' Lot 7 & All Lot 8 - - - - - - - - - - - - - - - - 278.87 917.15 Block 2 Lot 1 Plus W 15' Lot 2 - - - - - - - - - - - - - - - - 286.61 Lot 2 Less W 15' & W 33' Lot 3 - - - - - - - - - - - - 278.87 Lot 3 Less W 33' - - - - - - - - - - - - - - - - - - - 120.84 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 223.09 909.41 Block 9 W 294' - - - - - - - - - - - - - - - - - - - - - - - - 2,342.47 Block 10 E 290' - - - - - - - - - - - - - - - - - - - - - - - - 2,316.13 Section 22. For that part of the cost of paving and grading of Lincoln Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the east line of Fourth Street to the west line of Third Street, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $3,601.46 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, jthe following amounts: JONES ADDITION THIRD STREET Lot 23 - - - - - - - - - - - - - - - - - - - - - - - - 180.98 Lots 25 & 27 - - - - - - - - - - - - - - - - - - - - - 380.05 Lots 29-31-33 - - - - - - - - - - - - - - - - - - - - - 561.03 Lot 35 - - - - - - - - - - - - - - - - - - - - - - - - 180.98 Lot 37 - - - - - - - - - - - - - - - - - - - - - - - - 180.98 Lot 39 & S2 Lot 41 - - - - - - - - - - - - - - - - - - 271.47 1,755.49 CONSOLIDATED-SALINA FOURTH STREET N2 Lot 18 & All Lots 20-22 - - - - - - - - - - - - - 452.45 Lot 24 - - - - - - - - - - - - - - - - - - - - - - - 180.98 Lots 26 & 28 - - - - - - - - - - - - - - - - - - - - 380.05 Lot 30 - - - - - - - - - - - - - - - - - - - - - - - 199.08 Lots 32-34-36 & S2 Lot 38 - - - - - - - - - - - - - - 633.41 1,845.97 Section 23. For that part of the cost of paving and grading of Oakdale Avenue with concrete (Twenty-eight (28) feet wide from edge of curb to edge of curb) from the east end of Smoky Hill River Bridge East 900 feet more or less to west edge of existing paving, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $8,188.95 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: Oakdale Addition - - - - - - - - - - - - - - - - - - - 8,188.95 Section 24. For that part of the cost of curbing, guttering, paving and grading of Ohio Street with concrete (Forty (40) feet wide from back of curb to back of curb) from the north line of Ash Street to the north line of Elm Street which is chargeable against g g i the private property within the district chargeable therefore, and which cost is hereby determined to be $17,132.94 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance the following amounts: 10,235.50 RIVERSIDE PARK ADDITION Block 10 E2 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - 741.70 E 81' Lot 2 - - - - - - - - - - - - - - - - - - - - - - 660.79 EZ Lot 3 - - - - - - - - - - - - - - - - - - - - - - - 674.28 E2 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - 674.28 E2 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - 674.28 E2 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - 674.28 EZ Lot 7 - - - - - - - - - - - - - - - - - - - - - - - 674.28 El Lot ----------------------- 674.28 EZ Lot 9 - - - - - - - - - - - - - - - - - - - - - - - 674.28 E2 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - 674.28 EZ Lot 11 - - - - - - - - - - - - - - - - - - - - - - - 674.28 EZ Lot 12 - - - - - - - - - - - - - - - - - - - - - - - 674.28 EZ Lot 13 - - - - - - - - - - - - - - - - - - - - - - - 674.28 E 822' Lots 14-15 - - - - - - - - - - - - - - - - - - - 1,415.93 10,235.50 CONSOLIDATED-SALINA j RIVERVIEW ADDITION Block 1 I Lot 1 Less Riverside Drive - - - - - - - - - - - - - - 1,257.02 Lots 3&4 - - - - - - - - - - - - - - - - - - - - - - 2,430.24 i 3,687.26 Block 2 i Lots 1 & 2 - - - - - - - - - - - - - - - - - - - - - - 930.94 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 449.43 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 481.53 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 449.43 Lots 9-10 - - - - - - - - - - - - - - - - - - - - - - - 898.85 I 3,210.18 i Section 25. For that part of the cost of paving and grading of Pershing Street with concrete (Twenty-seven (27) feet wide from toe of gutter to toe of gutter) from the south j line of Beloit Street to the north line of Sunset Drive, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby i determined to be $1,984.67 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance I the following amounts: HIGHLAND COURT ADDITION Block 5 W 25' Lot 5 - - - - - - - - - - - - - - - - - - - - - - 53.93 I Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 107.86 Lots 7 & 8 - - - - - - - - - - - - - - - - - - - - - - 226.51 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 118.66 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 107.86 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 107.86 W 25' Lot 12 - - - - - - - - - - - - - - - - - - - - - 53.93 776.61 Block 9 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 118.66 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 107.86 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 107.86 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 107.86 I � I Lot 5 - - - - - - - - - - - - - - - - - - - - - - - ' - - 107.86 � I E 25' Lot 6 - - - - - - - - - - - - - - - - - - - - I - - 53.93 I E 25' Lot 17 - - - - - - - - - - - - - - - - - - - - - 53.93 I Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 107.86 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 107.86 Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 107.86 I Lot 21 - - - - - - - - - - - - - - - - - - - - - - - - 107.86 1 1 1 CONSOLIDATED-$&LINA Lot 22 - - - - - - - - - - - - - - - - - - - - - - - - 118.66 1,208.06 ' I Section 26. For that part of the cost of paving and grading of Pershing Street with i concrete (Twenty-seven (27) feet wide from toe of gutter to toe of gutter) from the south I line of Sunset Drive to the north line of Ellsworth Street, which is chargeable against I the private property within the district chargeable therefore, and which cost is hereby determined to be $2,270.34 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: HIGHLAND COURT ADDITION Block 6 W 25' Lot 5 - - - - - - - - - - - - - - - - - - - - - - 61.69 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 123.39 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 123.39 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 135.73 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 135.73 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 123.39 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 123.39 W 25' Lot 12 - - - - - - - - - - - - - - - - - - - - - 61.69 I ' I i 888.40 Block 10 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 135.72 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 123.39 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 123.39 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 123.39 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 123.39 E 25' Lot 6 - - - - - - - - - - - - - - - - - - - - - - 61.69 i E 25' Lot 17 - - - - - - - - - - - - - - - - - - - - - 61.69 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 123.39 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 123.39 I Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 123.39 Lot 21 - - - - - - - - - - - - - - - - - - - - - - - - 123.39 Lot 22 - - - - - - - - - - - - - - - - - - - - - - - - 135.72 II I 1,381.94 Section 27. For that part of the cost of paving and grading of Republic Avenue with concrete (Twenty-eight (28) feet wide from toe of gutter to toe of gutter) from the west line of Funston Avenue to the east line of the Missouri Pacific Railroad, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $8,145.84 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: CONSOLIDATED-SALINA SOUTHERN HEIGHTS ADDITION Block 24 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 100.38 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 100.38 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 100.38 l Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 100.38 Lot 11 & N 7' Lot 12 - - - - - - - - - - - - - - - - - 114.45 Lot 12 Less N 7' - - - - - - - - - - - - - - - - - - - 110.43 626.40 Block 23 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 115.35 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 115.35 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 115.35 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 115.35 W2 Lots 11-12 - - - - - - - - - - - - - - - - - - - - - 149.96 EZ Lots 11-12 - - - - - - - - - - - - - - - - - - - - - 149.96 E 622' Lots 13-14 - - - - - - - - - - - - - - - - - - - 149.96 W 622' Lots 13-14 - - - - - - - - - - - - - - - - - - - 149.96 S 45' Lot 15 - - - - - - - - - - - - - - - - - - - - - 103.82 N 5' Lot 15 & All Lot 16 & S 25' Lot 17 - - - - - - - - 184.57 N 25' Lot 17 & All Lot 18 - - - - - - - - - - - - - - - 173.04 1,522.67 Block 22 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 115.35 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 115.35 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 115.35 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 115.35 W2 Lots 11-12 - - - - - - - - - - - - - - - - - - - - - 149.97 E2 Lots 11-12 - - - - - - - - - - - - - - - - - - - - - 149.97 W2 Lots 13-14 - - - - - - - - - - - - - - - - - - - - - 149.97 E2 Lots 13-14 - - - - - - - - - - - - - - - - - - - - - 149.97 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 115.35 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 115.35 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 115.35 i Lot 18 I - - - - - - - - - - - - - - - - - - - - - - - - 115.35 1,522.68 HIGHLAND COURT ADDITION Block 15 Lot 12 - - - - - - - - - - - - - - - - - - - - - - -- 196.15 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 183.07 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 183.07 CONSOLIDATED-SALINA I Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 183.07 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 183.07 I I Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 183.07 j Tract West of Highland Court Addition - Sunset Park - - 3,362.59 4,474.09 Section 28. For that part of the cost of paving and grading of Stapler Avenue with concrete (Twenty-eight (28) feet wide from toe of gutter to toe of gutter) from the east line of Delaware Avenue to the west line of Indiana Avenue, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $4,322.01 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: i HANSON COURT ADDITION Block 1 Lots 10-22 Incl . - - - - - - - - - - - - - - - - - - - 2,227.15 UPPER MILL ADDITION Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 198.35 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 153.11 i Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 313.19 i Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 212.25 l A Lot 5 - - - - - - - - - - - - - - - - - - - - - - - 104.40 N 11' Lot 14 - - - - - - - - - - - - - - - - - - - - - 27.84 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 288.83 i Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 344.51 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 208.79 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 243.59 2,094.86 Section 29. For that part of the cost of curbing, guttering, paving and grading of Stack Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the west side of Missouri Avenue to the east side of Indiana Avenue, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $2,133.06 there is hereby levied, apportioned and assessed I against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: STACK PLACE Block 4 I I A Lots 6 & 7 - - - - - - - - - - - - - - - - - - - - - 106.15 A Lots 8 & 9 - - - - - - - - - - - - - - - - - - - - - 151.64 W2 Lots 10 & 11 - - - - - - - - - - - - - - - - - - - - 151.64 EZ Lots 6 & 7 - - - - - - - - - - - - - - - - - - - - - 92.67 III Ez Lots 8 & 9 - - - - - - - - - - - - - - - - - - - - - ' 151.64 CONSOLIDATED-SALINA E 71' Lots 10-11 - - - - - - - - - - - - - - - - - - - 151.64 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 160.06 965.44 Block 8 N 5' Lot 2 & All Lot 1 - - - - - - - - - - - - - - - - 176.90 S 40' Lot 2 & N 9' Lot 3 - - - - - - - - - - - - - - - 165.12 S 36' Lot 3 & N 13' Lot 4 - - - - - - - - - - - - - - - 165.12 S 32' Lot 4 & N 17' Lot 5 - - - - - - - - - - - - - - - 165.12 S 28' Lot 5 & N 21' Lot 6 - - - - - - - - - - - - - - - 165.12 S 24' Lot 6 & N 25' Lot 7 - - - - - - - - - - - - - - - 165.12 S 20' Lot 7 & N 29' Lot 8 - - - - - - - - - - - - - - - 165.12 j 1,167.62 Section 30. For that part of the cost of curbing, guttering, paving and grading of Seventh Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south property line of Lincoln Avenue to the north right-of-way line of the Union Pacific Railroad, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $3,960.77 there is hereby levied, apportioned and assessed against the following described lots and pieces of land i as provided for in Section 1 of this ordinance, the following amounts: CALKINS ADDITION i Block 4 Lot 36 - - - - - - - - - - - - - - - - - - - - - - - - 84.72 I jLots 37-38-39 - - - - - - - - - - - - - - - - - - - - - 635.42 j Lots 40 to 44 Incl. - - - - - - - - - - - - - - - - -- 1,059.03 Lots 45-46 - - - - - - - - - - - - - - - - - - - - - - 508.33 I 2,287.50 Block 9 Lots 1 & 2 - - - - - - - - - - - - - - - - - - - - - - 508.33 Lots 3-4-5 - - - - - - - - - - - - - - - - - - - - - - 635.42 Lots 6-7 - - - - - - - - - - - - - - - - - - - - - - - 423.61 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 105.91 1,673.27 Section 31. For that part of the cost of paving and grading of South Second Street with concrete (Twenty-eight (28) feet wide from edge of gutter to edge of gutter) from 150 feet south of Wilson Street to a point 23 feet north of the south line of Lot 15, i Block 6, Hutchinson's Addition, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $2,168.32 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: U CONSOLIDATED-SALINA it I HUTCHINSON ADDITION Block 6 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 305.48 j Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 305.48 I i Lot 13 & N 28' Lot 15 - - - - - - - - - - - - - - - - - 473.20 1,084.16 Block 5 Pt Lot 10 - - - - - - - - - - - - - - - - - - - - - - - 149.75 i Pt Lots 12 & 14 - - - - - - - - - - - - - - - - - - - - 74.87 Pt Lots 10-14-12-16 - - - - - - - - - - - - - - - - - 859.54 1,084.16 Section 32. For that part of the cost of curbing, guttering, paving and grading of South Second Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from a point 23 feet north of the south line of Lot 15, Block 7 Hutchinsons Addition to the south line of Lot 19 of said block, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $1,522.68 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: I HUTCHINSONS ADDITION Block 6 Lot 15 Less N 28' & Lots 17-19 - - - - - - - - - - - - 761.34 Lot 16 Less N 28' & Lots 18 & 20 - - - - - - - - - - - 761.34 i 1,522.68 Section 33. For that part of the cost of curbing, guttering, paving and grading of Wayne Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the east line of Ohio Street to the west line of Huntington Road, which is chargeable against the private property within the district chargeable therefore, and which cost is hereby determined to be $15,873.50 there is hereby levied, apportioned and assessed against the following described lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts: MAYFAIR ADDITION Block 3 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 612.48 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 593.91 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 519.67 � I i Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 519.67 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 519.67 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 612.48 3,377.88 Block 4 I Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 609.13 I CONSOLIDATED-SALINA 1 1 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 516.83 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 516.83 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 609.13 2,251.92 Block 5 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 679.81 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 613.67 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 679.81 1,973.29 3,377.88 Block 2 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 541.53 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 522.87 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 522.87 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 485.52 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 504.19 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 522.87 4,892.53 Section 34. Said amounts so levied, apportioned and assessed as aforesaid will be due and collectible in ten equal installments, the first becoming due with the taxes levied for the year 1963, and one of said installments falling due each and every year thereafter until all are paid and all to be collected with interest as in this ordinance provided, I HOWEVER, that the owner of any piece of property liable for any such assessment may redeem his property from such liability by paying to the City Treasury the entire amount chargeable I against the same, as in this ordinance provided, at any time within thirty days after the i publication of this ordinance and before the issuance of bonds of said City in payment of I the balance of the cost of said improvements, the property so paid on shall not hereafter be liable for any further assessments for the cost of such improvements nor for any part of said bonds. Block 1 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 612.48 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 593.91 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 519.67 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 519.67 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 519.67 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 612.48 3,377.88 Block 2 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 541.53 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 522.87 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 522.87 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 485.52 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 504.19 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 522.87 4,892.53 Section 34. Said amounts so levied, apportioned and assessed as aforesaid will be due and collectible in ten equal installments, the first becoming due with the taxes levied for the year 1963, and one of said installments falling due each and every year thereafter until all are paid and all to be collected with interest as in this ordinance provided, I HOWEVER, that the owner of any piece of property liable for any such assessment may redeem his property from such liability by paying to the City Treasury the entire amount chargeable I against the same, as in this ordinance provided, at any time within thirty days after the i publication of this ordinance and before the issuance of bonds of said City in payment of I the balance of the cost of said improvements, the property so paid on shall not hereafter be liable for any further assessments for the cost of such improvements nor for any part of said bonds. CONSOLIDATED-SALINA 1 Section 35, There is hereby levied further and assessed against such lots and pieces of ground described in this ordinance, interest at such rate per annum as shall be borne by the bonds which may be issued at the end of thirty days as specified in the preceding sections hereof, as by law provided, to the time of the collection of the installments as provided by law, which said interest shall be collected annually at the same time and in I the same manner as said installments are collected and after the taking effect of this I ordinance and the fixing of said interest rate when such bonds are authorized and issued, it shall be the duty of the City Clerk of said City to annually at the same time other taxes are certified and until all said assessments so apportioned and levied have been certified to the County Clerk of Saline County, Kansas, a full list of all property liable to assessment and taxation for such work and improvement, except such property on which the special assessments aforesaid have been paid in full as hereinbefore provided, together with II' the respective amounts due on each of said lots and pieces of ground which amounts shall include the annual installments of such special assessments with the interest for one year at the rate to be fixed as provided for in this ordinance, on all unpaid balances of said assessments, and such amounts so certified as herein provided shall be placed upon the tax roll by the County Clerk of Saline County, Kansas, and collected as other taxes are collected; Section 36, This ordinance shall take effect and be in full force from and after its adoption and publication once in the official city paper. (SEAL) Attest: City Clerk Introduced: December 4, 1962 Passed: December 11, 1962 �i Mayor