6679 Levy AssessmentsCONSOLIDATED-SALINA
u
ORDINANCE NUMBER
(Published in The Salina Journal J 041 1962)
AN ORDINANCE relating to and apportioning and levying special assessments on certain lots
and pieces of ground in the City of Salina, Kansas, to pay the cost of paving and grading
of Alley with concrete (Sixteen (16) feet wide) first north of Wayne Avenue from Roach
Street to Lewis Street; paving and grading of Antrim Avenue with concrete (Thirty-three
(33) feet wide from back of curb to back of curb) from the west side of Tenth Street to
the west line of Eleventh Street; curbing, guttering, paving and grading of East Ash Street
with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the
east side of Ohio Street to the east line of Riverside Drive; curbing, guttering, paving
and grading of Barney Street with concrete (Thirty-three (33) feet wide from back of curb
to back of curb) from the north line of Broadway Boulevard to the south line of Grand Avenue,I
curbing and guttering one side, and the paving and grading of Beverly Drive with concrete
(Twenty-eight (28) feet wide from toe of gutter to toe of gutter) from the west line of
Whittinghill Avenue to the west line of Viemont Avenue; curbing, guttering, paving and
grading of DuVall Avenue with concrete (Thirty-three (33) feet wide from back of curb to
back of curb) from the west line of Broadway Boulevard to the south line of Crawford Avenue;
curbing, guttering, paving and grading of Eastborough Road with concrete (Thirty-three (33)
feet wide from back of curb to back of curb) from the south line of Country Club Road to
the south line of Crestview Drive; curbing, guttering, paving and grading of Channel Road
with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the
south line of Iron Avenue to the north edge of Upper Mill Drive; paving and grading of
Front Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb)
From the south line of Lincoln Avenue to the south line of the Union Pacific right-of-way;
curbing, guttering, paving and grading of Francis Street with concrete (Thirty-three (33)
feet wide from back of curb to back of curb) from the south line of York Avenue south 127
feet; paving and grading of Funston Avenue with concrete (Twenty-six (26) feet wide from
toe of gutter to toe of gutter) from the south line of Ellsworth Street to the north line
of Jewell Avenue; curbing, guttering, paving and grading of Fourth Street with concrete
on both sides of Union Pacific Tracks, each 30 feet wide from back of curb to edge of slab,
from the south line of Claflin Avenue to the north side of Cloud Street; curbing, guttering,
paving and grading of The East side of Fourth Street with concrete (Thirty (30) feet wide
from back of curb to edge of pavement) from the north line of Bond Street to the south line
of Wilson Street; curbing, guttering, paving and grading of The East side of Fourth Street
with concrete (Twenty-two (22) feet wide from edge of slab to back of curb) from the south
side of Republic Avenue to the north side of Beloit Avenue; paving and grading of Fourth
Street on the East side of Tracks with concrete (Twenty (20) feet wide from back of curb
to edge of slab) from the south line of Lot 8 on Fourth Street of Jones Addition to the
north line of Lincoln Avenue; paving and grading of Fourth Street on the East side of
Tracks with concrete (Twenty (20) feet wide from back of curb to edge of slab) from the
south line of Lamar Street to the north line of Republic Avenue; curbing, guttering,
paving and grading of the East side of Fourth Street with concrete (Thirty (30) feet wide
from back of curb to the edge of pavement) from the south line of Wilson Street to the
south line of Lamar Street; paving and grading of Indiana Avenue with concrete (Thirty-
three (33) feet wide from back of curb to back of curb) from the south line of Gypsum
Avenue to the south line of Stack Avenue; paving and grading of Kansas Avenue with concrete
(Twenty-eight (28) feet wide from toe of gutter to toe of gutter) from the north line of
Elm Street to the south line of Riverside Boulevard; curbing, guttering, paving and grading
of Lewis Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of
curb) from the north line of Millwood Avenue to the south line of Crawford Avenue; paving
and grading of Lincoln Avenue with concrete (Thirty-three (33) feet wide from back of curb
to back of curb) from the east line of Fourth Street to the west line of Third Street;
paving and grading of Oakdale Avenue with concrete (Twenty-eight (28) feet wide from edge
of curb to edge of curb) from the east end of Smoky Hill River Bridge East 900 feet more
or less to west edge of existing paving; curbing, guttering, paving and grading of Ohio
Street with concrete (Forty (40) feet wide from back of curb to back of curb) from the
north line of Ash Street to the north line of Elm Street; paving and grading of Pershing
Street with concrete (Twenty-seven (27) feet wide from toe of gutter to toe of gutter)
from the south line of Beloit Street to the north line of Sunset Drive; paving and grading
of Pershing Street with concrete (Twenty-seven (27) feet wide from toe of gutter to toe of
gutter) from the south line of Sunset Drive to the north line of Ellsworth Street; paving
and grading of Republic Avenue with concrete (Twenty-eight (28) feet wide from toe of gutter
to toe of gutter) from the west line of Funston Avenue to the east line of the Missouri
Pacific Railroad; paving and grading of Stapler Avenue with concrete (Twenty-eight (28) j
feet wide from toe of gutter to toe of gutter) from the east line of Delaware Avenue to
the west line of Indiana Avenue; curbing, guttering, paving and grading of Stack Avenue
with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the
west side of Missouri Avenue to the east side of Indiana Avenue; curbing, guttering,
paving and grading of Seventh Street with concrete (Thirty-three (33) feet wide from back
of curb to back of curb) from the south property line of Lincoln Avenue to the north right-
of-way line of the Union Pacific Railroad; paving and grading of South Second Street with
concrete (Twenty-eight (28) feet wide from edge of gutter to edge of gutter) from 150 feet
south of Wilson Street to a point 23 feet north of the south line of Lot 15, Block 6, 1
Hutchinson's Addition; curbing, guttering, paving and grading of South Second Street with
concrete (Thirty-three (33) feet wide from back of curb to back of curb) from a point 23
feet north of the south line of Lot 15, Block 7 Hutchinson's Addition to the south line of
Lot 19 of said Block; curbing, guttering, paving and grading of Wayne Avenue with concrete
(Thirty-three (33) feet wide from back of curb to back of curb) from the east line of Ohio
Street to the west line of Huntington Road; and relating to and providing for the collection)
and payment of such assessments:
CONSOLIDATED-SALINA
i
1
i
BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas:
� i
Section 1. For the purpose of paying for that part of the cost of improvements in
I
certain portions of certain streets as hereinafter set forth in the following sections of
this ordinance, which is chargeable to the private property in the assessment districts
i
i
for each of such improvements, respectively, as set forth in the following sections of this
ordinance with respect to each of such improvements, there is hereby levied and assessed
I
on the property liable therefore, being all the lots and pieces of land lying on either
side of said streets so improved, respectively, to the middle of the block for the distance
improved with respect to the improvements mentioned in Sections 2, 3, 4, 5, 6, 7, 8, 9, 10,
11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 of
this ordinance, according to the appraised value of such lots and pieces of ground with
respect to each such improvement, without regard to the buildings or improvements thereon,
special assessments covering the cost of such work and improvements, said special assessmentsi
being based on the special valuation and appraisement of said lots and pieces of ground
therefore made by three disinterested appraisers appointed by the Board of Commissioners
of the City of Salina, Kansas, with respect to each such improvement which said appraisements,
are hereby referred to and made a part of this ordinance, and the several amounts so levied,
apportioned and assessed against the lots and pieces of ground for each such improvement,
respectively, for the purpose aforesaid, are hereby found and determined to be the amounts
set forth in the following sections of this ordinance with respect to each of such improvements.
Section 2. For that part of the cost of paving and grading of Alley with concrete
(Sixteen (16) feet wide) first north of Wayne Avenue from Roach Street to Lewis Street,
which is chargeable against the private property within the district chargeable therefore,
and which cost is hereby determined to be $4,015.93, there is hereby levied, apportioned
and assessed against the following described lots and pieces of land as provided for in
Section 1 of this ordinance, the following amounts:
SHALIMAR PLAZA ADDITION
Block 3
i
Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 275.77
Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 241.30
Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 241.30
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 241.30
Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 241.30
Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 241.30
Lot ------------------- - - - - -- 241.30
Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 284.39
Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 284.39
Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 241.30
Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 241.30
Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 241.30
Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 241.30
CONSOLIDATED-SALINA
1
L�
TUCKER PARK ADDITION
Block 2
Lot 11 Less W 2' - - - - - - - - - - - - - - - - - - - 269.18
W 45' Lot 12 Plus W 2' Lot 11 - - - - - - - - - - - - - 137.65
406.83
REIMOLD'S ADDITION
N 10' Lot 29 - - - - - - - - - - - - - - - - - - - - - 20.39
Lot 30 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 31 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 32 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 33 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
N 36' Lots 34-35-36 - - - - - - - - - - - - - - - - - - 73.41
N 38' S 64' Lots 34-35-36 - - - - - - - - - - - - - - - 77.49
S 26' Lots 34-35-36 Plus 10' Pt Vac Antrim - - - - - - 83.61
581.18
MILITARY ADDITION
Block 48
Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lots 18 & 20 - - - - - - - - - - - - - - - - - - - - - 173.35
Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 91.78
836.12
Section 4. For that part of the cost of curbing, guttering, paving and grading of
East Ash Street with concrete (Thirty-three (33) feet wide from back of curb to back of
curb) from the east side of Ohio Street to the east line of Riverside Drive, which is
chargeable against the private property within the district chargeable therefore, and which
Lot 14 - - - - -
- - - - - - - - - - - -
- - - - - - - 241.30
Lot 15 - - - - -
- - - - - - - - - - - -
- - - - - - - 241.30
Lot 16 - - - - -
- - - - - - - - - - - -
- - - - - - - 275.78
4,015.93
Section 3. For that part
of the cost of paving
and grading of Antrim Avenue with
concrete (Thirty-three (33)
feet wide from back of curb to back of curb) from the west side
of Tenth Street to the west
line of Eleventh Street,
which is chargeable against the private
property within the district
chargeable therefore, and which cost is hereby determined to
I
be $1,824.13 there is hereby
levied, apportioned and
assessed against the following
described lots and pieces of
land as provided for in
Section 1 of this ordinance, the
following amounts:
1
L�
TUCKER PARK ADDITION
Block 2
Lot 11 Less W 2' - - - - - - - - - - - - - - - - - - - 269.18
W 45' Lot 12 Plus W 2' Lot 11 - - - - - - - - - - - - - 137.65
406.83
REIMOLD'S ADDITION
N 10' Lot 29 - - - - - - - - - - - - - - - - - - - - - 20.39
Lot 30 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 31 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 32 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 33 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
N 36' Lots 34-35-36 - - - - - - - - - - - - - - - - - - 73.41
N 38' S 64' Lots 34-35-36 - - - - - - - - - - - - - - - 77.49
S 26' Lots 34-35-36 Plus 10' Pt Vac Antrim - - - - - - 83.61
581.18
MILITARY ADDITION
Block 48
Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 81.57
Lots 18 & 20 - - - - - - - - - - - - - - - - - - - - - 173.35
Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 91.78
836.12
Section 4. For that part of the cost of curbing, guttering, paving and grading of
East Ash Street with concrete (Thirty-three (33) feet wide from back of curb to back of
curb) from the east side of Ohio Street to the east line of Riverside Drive, which is
chargeable against the private property within the district chargeable therefore, and which
CONSOLIDATED-SALINA
cost is hereby determined to be $6,154.17, there is hereby levied, apportioned and assessed
against the following described lots and pieces of land as provided for in Section 1 of
this ordinance, the following amounts:
I
RIVERVIEW ADDITION
j Block 2
Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - -
437.04
Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - 407.91
i
i
Lot 9-10 - - - - - - - - - - - - - - - - - - - - - - - 815.80
Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 407.91
Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 407.91
Lots 13 & 14 Less Riverside Dr. - - - - - - - - - - - - I 524.45 , I,
3,001.02
i I
RICHOLSON'S REPLAT OF PT. OF RIVERVIEW ADDITION
Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 315.32
Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 292.79
I I
Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - -
' 292.79
I
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 292.79
1,193.69
RIVERVIEW ADDITION
Block 3
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 315.32
j
Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 315.32
Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 315.32
Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 315.32
j Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 315.32
Lot 9 & 10 Less Riverside Dr. - - - - - - - - - - - - - 382.86
I � I
1,959.46
Section 5. For that part of the cost of curbing, guttering, paving and grading of
Barney Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb)
from the north line of Broadway Boulevard to the south line of Grand Avenue, which is
chargeable against the private property within the district chargeable therefore, and which
cost is hereby determined to be $5,252.56 there is hereby levied, apportioned and assessed
I
against the following described lots and pieces of land as provided for in Section 1 of
this ordinance, the following amounts:
NORTH PARK ADDITION
Block 1
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 129.67
Lots 6-8-10-12-14-16 - - - - - - - - - - - - - - - - - 833.61
II
Lots 18 & 20 - - - - - - - - - - - - - - - - - - - - - 370.50
Lots 22 & 24 - - - - - - - - - - - - - - - - - - - - - 370.50
Lots 26-28-30 - - - - - - - - - - - - - - - - - - - - - 555.74
I I '
Lots 32 & 34 Less Hwy - - - - - - - - - - - - - - - - - 370.50
11
D
1
CONSOLIDATED-SALINA
Lots 36-38-40-42 Less Hwy - - - - - - - - - - - - - - -
NORTH PARK ADDITION
Block 2
370.50
3,001.02
Lots 1-3-5-7-9-11 - - - - - - - - - - - - - - - - - - 1,173.88
Lots 13-15-17-19-21-23 Less Hwy - - - - - - - - - - - 1,077.66
2,251.54
Section 6. For that part of the cost of curbing and guttering one side, and the
paving and grading of Beverly Drive with concrete (Twenty-eight (28) feet wide from toe of
gutter to toe of gutter) from the west line of Whittinghill Avenue to the west line of
Viemont Avenue, which is chargeable against the private property within the district
chargeable therefore, and which cost is hereby determined to be $2,894.59 there is hereby
levied, apportioned and assessed against the following described lots and pieces of land
as provided for in Section 1 of this ordinance, the following amounts:
VANDERBILT ADDITION
E 18.7' Lot 3 - - - - - - - - - - - - - - - - - - - - - 119.36
W 41.3' Lot 3 - - - - - - - - - - - - - - - - - - - - - 264.30
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 379.40
Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 366.60
Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 298.40
Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 127.89
1,555.95
WEST HAVEN 1ST ADDITION
Block 3
Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 178.19
Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 159.90
Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 178.19
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 137.06
Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 137.06
i
Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 137.06
i
Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 137.06
I
j Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 137.06
Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 137.06
1,338.64
Section 7. For that part of the cost of curbing, guttering, paving and grading of
DuVall Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb)
i
from the west line of Broadway Boulevard to the south line of Crawford Avenue, which is
i
chargeable against the private property within the district chargeable therefore, and which
cost is hereby determined to be $12,773.86 there is hereby levied, apportioned and assessed
against the following described lots and pieces of land as provided for in Section 1 of
j this ordinance the following amounts:
CONSOLIDATED-SALINA
1
1
1
BANKER ADDITION
Blk 1 Plus Vac Banker St., DuVall Ave. & Broadway Place
& Less Tr to General Public for Street - - - - - - - - 6,131.45
i
Blk 2 Plus Adj Vac Broadway Place - - - - - - - - - - - 6,642.41
12,773.86
Section 8. For that part of the cost of curbing, guttering, paving and grading of
Eastborough Road with concrete (Thirty-three (33) feet wide from back of curb to back of
curb) from the south line of Country Club Road to the south line of Crestview Drive, which
is chargeable against the private property within the district chargeable therefore, and
which cost is hereby determined to be $9,682.64 there is hereby levied, apportioned and
assessed against the following described lots and pieces of land as provided for in Section
1 of this ordinance, the following amounts:
REPLAT COUNTRY CLUB HEIGHTS ADDITION NO. 2
Block 3
E 43' Lot 2 - - - - - - - - - - - - - - - - - - - - - - 298.39
Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 641.89
Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 693.93
Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 589.84
Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 624.54
Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 624.54
Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 572.50
Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 572.50
4,618.13
NEI 17-14-2 - - - - - - - - - - - - - - - - - - - - - - 5,064.51
Section 9. For that part of the cost of curbing, guttering, paving and grading of
Channel Road with concrete (Thirty-three (33) feet wide from back of curb to back of curb)
from the south line of Iron Avenue to the north edge of Upper Mill Drive, which is
i
chargeable against the private property within the district chargeable therefore, and which
cost is hereby determined to be $39,958.93 there is hereby levied, apportioned and assessed
it
against the following described lots and pieces of land as provided for in Section 1 of
lI
this ordinance, the following amounts:
SURVEYOR'S PLAT NO. 49
E 189.35' Lot 2 - - - - - - - - - - - - - - - - - - - - 538.53
E 125' of W. 242.5' Lot 2 - - - - - - - - - - - - - - - 355.85
W 117.5' Lot 2 - - - - - - - - - - - - - - - - - - - - 334.92
Beg. SW Corner Lot 2 W 150' N 275' E 150' S. to Beg - - 428.16
Beg. at a point 150' W of SW corner Lot 2 W 15' N 275'
E 15' S 275' to Beg.- - - - - - - - - - - - - - - - - - 41.86
Beg. at a point 165' W of SW corner Lot 2 W 421.67' N.
275' E 421.67' S 275' to Beg. - - - - - - - - - - - - - 1,202.65
2,901.97
CONSOLIDATED-SALINA
Il
1
1
MILLVIEW ADDITION
Block 1
Lot
1 - - - - - - - - - - - - - - - - - - - - - - -
- - 237.87
Lot
2 - - - - - - - - - - - - - - - - - - - - - - -
- - 215.03
Lot
3 - - - - - - - - - - - - - - - - - - - - - - -
- - 215.03
Lot
4 - - - - - - - - - - - - - - - - - - - - - - -
- - 215.03
Lot
5 - - - - - - - - - - - - - - - - - - - - - - -
- - 215.03
Lot
6 - - - - - - - - - - - - - - - - - - - - - - -
- - 215.03
Lot
7 - - - - - - - - - - - - - - - - - - - - - - -
- - 228.35
Lot
8 - - - - - - - - - - - - - - - - - - - - - - -
- - 266.41
Lot
9 - - - - - - - - - - - - - - - - - - - - - - -
- - 266.41
Lot
10 - - - - - - - - - - - - - - - - - - - - - -
- - 256.90
Lot
11 - - - - - - - - - - - - - - - - - - - - - -
- - 256.90
Lot
12 - - - - - - - - - - - - - - - - - - - - - -
- - 275.92
Lot
13 - - - - - - - - - - - - - - - - - - - - - -
- - 275.92
Lot
14 - - - - - - - - - - - - - - - - - - - - - -
- - 266.41
Lot
15 - - - - - - - - - - - - - - - - - - - - - -
- - 285.44
Lot
16 - - - - - - - - - - - - - - - - - - - - - -
- - 285.44
Lot
17 - - - - - - - - - - - - - - - - - - - - - -
- - 285.44
Lot
18 - - - - - - - - - - - - - - - - - - - - - -
- - 285.44
Lot
19 - - - - - - - - - - - - - - - - - - - - - -
- - 285.44
Lot
20 - - - - - - - - - - - - - - - - - - - - - -
- - 275.92
5,109.36
Block 2
Lot
1 - - - - - - - - - - - - - - - - - - - - - - -
- - 256.90
Lot
2 - - - - - - - - - - - - - - - - - - - - - - -
- - 285.44
Lot
3 - - - - - - - - - - - - - - - - - - - - - - -
- - 285.44
Lot
4 - - - - - - - - - - - - - - - - - - - - - - -
- - 285.44
Lot
5 - - - - - - - - - - - - - - - - - - - - - - -
- - 285.44
Lot
6 - - - - - - - - - - - - - - - - - - - - - - -
- - 313.98
Lot
7 - - - - - - - - - - - - - - - - - - - - - - -
- - 313.98
Lot
8 - - - - - - - - - - - - -- - - - - - - - - - -
- - 285.44
Lot
9 - - - - - - - - - - - - - - - - - - - - - - -
- - 285.44
Lot
10 - - - - - - - - - - - - - - - - - - - - - -
- - 256.90
Lot
11 - - - - - - - - - - - - - - - - - - - - - -
- - 256.90
Lot
12 - - - - - - - - - - - - - - - - - - - - - -
- - 228.35
Lot
13 - - - - - - - - - - - - - - - - - - - - - -
- - 237.87
3,577.52
MOUNT BARBARA ADDITION
Lot
1 - - - - - - - - - - - - - - - - - - - - - - -
- - 342.53
Lot
2 - - - - - - - - - - - - - - - - - - - - - - -
- - 270.22
CONSOLIDATED-SALINA
[i
1
1
Lot 3 -
- - - - - - - - - - - - - - - - - - - - - - - -
270.22
Lot 4 -
- - - - - - - - - - - - - - - - - - - - - - - -
270.22
Lot 5 -
- - - - - - - - - - - - - - - - - - - - - - - -
270.22
Lot 6 -
- - - - - - - - - - - - - - - - - - - - - - - -
270.22
Lot 7 -
- - - - - - - - - - - - - - - - - - - - - - - -
285.44
Lot 8 -
- - - - - - - - - - - - - - - - - - - - - - - -
371.07
Lot 9 -
- - - - - - - - - - - - - - - - - - - - - - - -
371.07
Lot 10
- - - - - - - - - - - - - - - - - - - - - - - -
285.44
Lot 11
- - - - - - - - - - - - - - - - - - - - - - - -
270.22
Lot 12
- - - - - - - - - - - - - - - - - - - - - - - -
270.22
Lot 13
- - - - - - - - - - - - - - - - - - - - - - - -
270.22
j Lot 14
i
- - - - - - - - - - - - - - - - - - - - - - - -
256.90
Lot 15
- - - - - - - - - - - - - - - - - - - - - - - -
256.90
Lot 16
- - - - - - - - - - - - - - - - - - - - - - - -
256.90
Lot 17
- - - - - - - - - - - - - - - - - - - - - - - -
342.53
4,930.54
MOUNT BARBARA PARK ADDITION
REPLAT LOT 1
Pt Lot 1
- - - - - - - - - - - - - - - - - - - - - - -
1,141.74
SURVEYOR'S PLAT 34
Triangle
tract in Lot 2, So. & E. of Channel Rd. - - -
570.88
Tract in
Lot 2, So. & E. of Channel Rd. 240'--x 160' - -
475.73
Tract in Lot 2, 378' x 200' Plus 40' Strip along So. line
of Lot 2 to Channel Rd . - - - - - - - - - - - - - - - - 1,046.61
West side Channel Road - - - - - - - - - - - - - - - - 20,204.58
22,297.80
Section 10. For that part of the cost of paving and grading of Front Street with
concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south
line of Lincoln Avenue to the south line of the Union Pacific right-of-way, which is
chargeable against the private property within the district chargeable therefore, and which
cost is hereby determined to be $6,826.05 there is hereby levied, apportioned and assessed
against the following described lots and pieces of land as provided for in Section 1 of
this ordinance, the following amounts:
JONES ADDITION
All Railroad Reserve So. of UPRR to Railroad Ave. - - - 564.12
Lots 25-26-27-28 Front St. - - - - - - - - - - - - - - 887.78
Lots 23-22 Less RR & Lot 24 Front St. - - - - - - - - - 238.18
1,690.08
MORRIS ADDITION
Block 4
Lots 1-17 Alt. - - - - - - - - - - - - - - - - - - - - 1,880.41
Block 13
Lots 23-25-27 Less RR
561.06
CONSOLIDATED-SALINA
1
�J
Lots 1-19 Inc. Block 13 Morris Add.
Lots 16-21 Inc. Front St. Jones Add. - - - - - - - - - - 2,694.50
Section 11. For that part of the cost of curbing, guttering, paving and grading of
Francis Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb)
from the south line of York Avenue south 127 feet, which is chargeable against the private
I
property within the district chargeable therefore, and which cost is hereby determined to
be $1,903.33 there is hereby levied, apportioned and assessed against the following describedl�;
i
i
lots and pieces of land as provided for in Section 1 of this ordinance, the following amounts)
EAST GARDENS ADDITION
N 32' Less W 300' Lot 10 & 11 Less W 300' - - - - - - - 171.28
W 300' N 32' Lot 10 & W 300' Lot 11 - - - - - - - - - - - 1,154.70
Lot 19 & N 32' Lot 20 - - - - - - - - - - - - - - - - - 577.35
1,903.33
Section 12. For that part of the cost of paving and grading of Funston Avenue with
concrete (Twenty-six (26) feet wide from toe of gutter to toe of gutter) from the south
line of Ellsworth Street to the north line of Jewell Avenue, which is chargeable against
the private property within the district chargeable therefore, and which cost is hereby
determined to be $2,978.75 there is hereby levied, apportioned and assessed against the
following described lots and pieces of land as provided for in Section 1 of this ordinance
the following amounts:
HIGHLAND COURT ADDITION
Block 14
W 25' Lot 3 - - - - - - - - - - - - - - - - - - - - - - 106.21
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 212.42
Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 233.67
Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 233.67
Lot 7 - - - - - - ._ - - - - - - - - - - - - - - - - - - 212.42
Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 212.42
Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 212.42
W 22.5' Lot 10 - - - - - - - - - - - - - - - - - - - - 95.60
1,518.83
Block 16
S 24' Lot 7 - - - - - - - - - - - - - - - - - - - - - - 127.88
Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 261.08
Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 261.08
Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 261.08
Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 261.08
Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 287.72
1,459.92
Section 13. For that part of the cost of curbing, guttering, paving and grading of
Fourth Street with concrete on both sides of Union Pacific Tracks, each 30 feet wide from
CONSOLIDATED-SALINA
1
1
back of curb to edge of slab, from the south line of Claflin Avenue to the north side of
Cloud Street, which is chargeable against the private property within the district chargeable'
therefore, and which cost is hereby determined to be $10,286.87 there is hereby levied,
apportioned and assessed against the following described lots and pieces of land as provided
for in Section 1 of this ordinance, the following amounts:
ADDITION TO GROUNDS OF KWU ADDITION
Lots 1-19 Alt. Russell Ave. & Lots 2-20 Alt. Cloud Ave. 2,571.72
Ii
Lots 1-19 Alt. Claflin Ave. & Lots 2-20 Alt. Russell Ave 2,571.71
5,143.43
GROUNDS OF KWU ADDITION
Campus Santa Fe Ave. - - - - - - - - - - - - - - - - - 5,143.44
Section 14. For that part of the cost of curbing, guttering, paving and grading of
The East side of Fourth Street with concrete (Thirty (30) feet wide from back of curb to
edge of pavement) from the north line of Bond Street to the south line of Wilson Street,
which is chargeable against the private property within the district chargeable therefore,
and which cost is hereby determined to be $6,495.78 there is hereby levied, apportioned and
assessed against the following described lots and pieces of land as provided for in Section
1 of this ordinance, the following amounts:
COLLEGE VIEW ADDITION
Block 1
S 50' Lot 1 & S 50' W 44' Lot 3 - - - - - - - - - - - - 229.60
N 70' W 94' Lot 1 Plat F & N 5' S 55' Lot 1 & N 5' S 55'
W 44' Lot 3 - - - - - - - - - - - - - - - - - - - - - - 367.36
N 70' E. 41' Lot 1 Plat F & E 6' S 55' Lot 3 & All Lot 5 257.15
Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 252.56
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 229.60
Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 229.60
Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 229.60
Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 229.60
W 25' Lot 9 - - - - - - - - - - - - - - - - - - - - - - 114.80
W 25' Lot 10 - - - - - - - - - - - - - - - - - - - - - 114 80
2,254.67
Block 3
Lot
1 - - - - - - - - - - - - - - - - - - - -
- - - - - 269.58
Lot
2 - - - - - - - - - - - - - - - - - - - -
- - - - - 269.58
Lot
I
3 - - - - - - - - - - - - - - - - - - - -
- - - - - 245.07
Lot
4 - - - - - - - - - - - - - - - - - - - -
- - - - - 245.07
Lot
5 - - - - - - - - - - - - - - - - - - - -
- - - - - 245.07
Lot
6 - - - - - - - - - - - - - - - - - - - -
- - - - - 245.07
Lot
7 - - - - - - - - - - - - - - - - - - - -
- - - - - 245.07
Lot
8 - - - - - - - - - - - - - - - - - - - -
- - - - - 245.07
CONSOLIDATED-SALINA
C
W 25' Lot 9 - - - - - - - - - - - - - - - - - - - - - - 122.54
W 25' Lot 10 - - - - - - - - - - - - - - - - - - - - - 122.55
2,254.67
Block 5
j Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 237.50
Lot 2 Plus 10' Accreted St. - - - - - - - - - - - - - - 237.50
Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 215.92
Lot 4 Plus 10' Accreted St. - - - - - - - - - - - - - - 215.92
Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 215.92
Lot 6 Plus 10' Accreted St. - - - - - - - - - - - - - - 215.92
Lot 7 - - - - -- - - - - - - - - - - - - - - - - - - - - 215.92
Lot 8 & W 122' Lot 10 Plus 10' Accreted St. - - - - - - 269.90
W 25' Lot 9 - - - - - - - - - - - - - - - - - - - - - - 107.96
E 122' of W 25' Lot 10 - - - - - - - - - - - - - - - - 53.98
1,986.44
Section 15. For that part of the cost of curbing, guttering, paving and grading of
the East side of Fourth Street with concrete (Twenty-two (22) feet wide from edge of slab
to back of curb) from the south side of Republic Avenue to the north side of Beloit Avenue,
which is chargeable against the private property within the district chargeable therefore,
and which cost is hereby determined to be $2,165.90 there is hereby levied, apportioned
and assessed against the following described lots and pieces of land as provided for in
Section 1 of this ordinance, the following amounts:
ADDITION TO GROUNDS OF KWU ADDITION
REPUBLIC STREET
Lot
1 - - - - - - - - - - - - - - - - - - - - -
- - - - 233.58
Lot
3 - - - - - - - - - - - - - - - - - - - - -
- - - - 212.34
Lot
5 - - - - - - - - - - - - - - - - - - - -
- - - - 212.34
Lot
7 - - - - - - - - - - - - - - - - - - - - -
- - - - 212.34
Lot
9 - - - - - - - - - - - - - - - - - - - - -
- - - - 212.34
1,082.94
BELOIT STREET
Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 233.58
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 212.34
Lot 6&A Lot 8 - - - - - - - - - - - - - - - - - -- 318.52
i
E2 Lot 8 & All Lot 10 - - - - - - - - - - - - - - - - - 318.52
1,082.96 j
Section 16. For that part of the cost of paving and grading of Fourth Street on the j
East side of tracks with concrete (Twenty (20) feet wide from back of curb to edge of slab)
from the south line of Lot 8 on Fourth Street of Jones Addition to the north line of Lincoln
Avenue, which is chargeable against the private property within the district chargeable
therefore, and which cost is hereby determined to be $2,482.37 there is hereby levied,
1
J
1
CO�NpS�OLIDATED-SALINA
I I
apportioned and assessed against the following described lots and pieces of land as provided
i
for in Section 1 of this ordinance, the following amounts:
JONES ADDITION
FOURTH STREET
I
Lot 10 Less RR - - - - - - - - - - - - - - - - - - - - 129.29
Lot 12 - - - - - - - - - - - - - - - - - - - - - - - -
258,58
Lots 14 & 16 - - - - - - - - - - - - - - - - - - - - - 517.16
Lots 18-20-22 - - - - - - - - - - - - - - - - - - - - - 775.74
Lot 24 - - - - - - - - - - - - - - - - - - - - - - - - 258.58
Lots 26 & 28 - - - - - - - - - - - - - - - - - - - - - 543.02
2,482.37
Section 17. For that part of the cost of paving and grading of Fourth Street on the
East side of Tracks with concrete (Twenty (20) feet wide from back of curb to edge of slab)
from the south line of Lamar Street to the north line of Republic Avenue, which is
chargeable against the private property within the district chargeable therefore, and which
cost is hereby determined to be $4,034.47 there is hereby levied, apportioned and assessed
against the following described lots and pieces of land as provided for in Section 1 of
this ordinance, the following amounts:
HUTCHINSON ADDITION
Block 3
Lot 1 Except S 351311 - - - - - - - - - - - - - - - - - 509.62
I i
Lot 2 Except S 35'3 -- - - - - - - - - - - - - - - - - - 409.24
S 35'3" Lots 1 & 2 - - - - - - - - - - - - - - - - - - 270.25
i
W 26.5' Lot 3 - - - - - - - - - - - - - - - - - - - - - 204.62
1,393.73
SUNNYSIDE ADDITION
REPLAT BLOCKS 4-5
Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 517.34
Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 328.16
Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 328.16
Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 366.77
Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 366.77
Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 366.77
Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 366.77
2,640.74
Section 18. For that part of the cost of curbing, guttering, paving and grading of
the East side of Fourth Street with concrete (Thirty (30) feet wide from back of curb to
edge of pavement) from the south line of Wilson Street to the south line of Lamar Street,
which is chargeable against the private property within the district chargeable therefore,
I
and which cost is hereby determined to be $2,648.47 there is hereby levied, apportioned and
assessed against the following described lots and pieces of land as provided for in Section
i
1 of this ordinance, the following amounts:
CONSOLIDATED -SAUNA
i
i
II
1
1
-- - -- - _- - -- -- - _ =- -
- - - - - - 249.80
E 85' Lot 4 - - - - - - - - - - - - - -
- - - - - - - - 249.80
Lot 6 - - - - - - - - - - - - - - ---
-- - - - - -- 297.38
Lot 8 - - - - - - - - - - _ - - - - - -
- - - - - - - - 297.38
Lot 10 - - - - - - - - - - - - - - - -
- - - - - - -- 297.38
Lot 12 - - - - - - - - - - - - - - - -
- - - - - - -- 297.38
Lot 14 - - - - - - - - - - - - - - - -
- - - - - - -- 297.38
Lot 16 - - - - - - - - - - - - - - - -
- - - - - - - - 297.38
Lot 18 - - - - - - - - - - - - - - - -
- - - - - - - - 297.38
Lot 20 - - - - - - - - - - - - - - - -
i
- - - - - - - - 297.38
Lot 22 - - - - - - - - - - - - - - - -
- - - - - - - - 297.38
Lot 24 - - - - - - - - - - - - - - - -
- - - - - - - - 297.38
Lot 26 - - - - - - - - - - - - - - - -
- - - - - - -- 297.38
Lot 28 - - - - - - - - - - - - - - - -
- - - - - - - - 297.38
Lot 30 - - --------------
-- - - - - -- 297.38
Lot 32 - - - - - - - - - - - - - - - -
- - - - - - - - 297.38
Lot 34 - - - - - - - - - - - - - - - -
- - - - - - - - 297.38
Lot 36 - - - - - - - - - - - - - - - -
- - - - - - - - 297.38
E 98' Lot 38 & 40 - - - - - - - - - - -
- - - - - - - - 297.38
W 67' Lot 38 & 40 - - - - - - - - - - -
- - - - - - - - 208.20
6,2.39.08
Block 4
E 822' Lot 1 - - - - - - - - - - - - - - - - -
- - - - 237.91
W 822' Lot 1 - - - - - - - - - - - - - - - - -
- - - - 249.80
Lot 3 - - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 5 - - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 7 - - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 9 - - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 11 - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 13 - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 15 - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 17 - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 19 - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 21 - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 23 - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 25 - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 27 - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 29 - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 31 - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
Lot 33 - - - - - - - - - - - - - - - - - - - -
- - - - 297.38
CONSOLIDATED-SALINA
1
1
Lots 34 & 35 Less Riverside Blvd. - - - - - - - - - - - 386.60
i
5,632.39
I
Section 21. For that part of the cost of curbing, guttering, paving and grading of
Lewis Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb)
from the north line of Millwood Avenue to the south line of Crawford Avenue, which is
chargeable against the private property within the district chargeable therefore, and which
cost is hereby determined to be $6,485.16 there is hereby levied, apportioned and assessed
against the following described lots and pieces of land as provided for in Section 1 of
this ordinance, the following amounts:
RIKER ADDITION
Block 1
W 41'
Lot
5 - - - - - - - - - - - - - - - - -
- - - - - 127.02
W 50'
Lot
6 Plus E 32' Lot 5 - - - - - - - -
- - - - - 254.08
E 23'
Lot
6 & W 60' Lot 7 - - - - - - - - - -
- - - - - 257.18
E 15'
Lot
7 & All Lot 8 - - - - - - - - - - -
- - - - - 278.87
917.15
Block 2
Lot 1 Plus W 15' Lot 2 - - - - - - - - - - - - - - - - 286.61
Lot 2 Less W 15' & W 33' Lot 3 - - - - - - - - - - - - 278.87
Lot 3 Less W 33' - - - - - - - - - - - - - - - - - - - 120.84
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 223.09
909.41
Block 9
W 294' - - - - - - - - - - - - - - - - - - - - - - - - 2,342.47
Block 10
E 290' - - - - - - - - - - - - - - - - - - - - - - - - 2,316.13
Section 22. For that part of the cost of paving and grading of Lincoln Avenue with
concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the east
line of Fourth Street to the west line of Third Street, which is chargeable against the
private property within the district chargeable therefore, and which cost is hereby
determined to be $3,601.46 there is hereby levied, apportioned and assessed against the
following described lots and pieces of land as provided for in Section 1 of this ordinance,
jthe following amounts:
JONES ADDITION
THIRD STREET
Lot 23 - - - - - - - - - - - - - - - - - - - - -
- - - 180.98
Lots 25 & 27 - - - - - - - - - - - - - - - - - -
- - - 380.05
Lots 29-31-33 - - - - - - - - - - - - - - - - - -
- - - 561.03
Lot 35 - - - - - - - - - - - - - - - - - - - - -
- - - 180.98
Lot 37 - - - - - - - - - - - - - - - - - - - - -
- - - 180.98
Lot 39 & S2 Lot 41 - - - - - - - - - - - - - - -
- - - 271.47
1,755.49
CONSOLIDATED-SALINA
FOURTH STREET
N2 Lot 18 & All Lots 20-22 - - - - - - - - - - - - - 452.45
Lot 24 - - - - - - - - - - - - - - - - - - - - - - - 180.98
Lots 26 & 28 - - - - - - - - - - - - - - - - - - - - 380.05
Lot 30 - - - - - - - - - - - - - - - - - - - - - - - 199.08
Lots 32-34-36 & S2 Lot 38 - - - - - - - - - - - - - - 633.41
1,845.97
Section 23. For that part of the cost of paving and grading of Oakdale Avenue with
concrete (Twenty-eight (28) feet wide from edge of curb to edge of curb) from the east
end of Smoky Hill River Bridge East 900 feet more or less to west edge of existing paving,
which is chargeable against the private property within the district chargeable therefore,
and which cost is hereby determined to be $8,188.95 there is hereby levied, apportioned
and assessed against the following described lots and pieces of land as provided for in
Section 1 of this ordinance, the following amounts:
Oakdale Addition - - - - - - - - - - - - - - - - - - - 8,188.95
Section 24. For that part of the cost of curbing, guttering, paving and grading of
Ohio Street with concrete (Forty (40) feet wide from back of curb to back of curb) from
the north line of Ash Street to the north line of Elm Street which is chargeable against
g g
i
the private property within the district chargeable therefore, and which cost is hereby
determined to be $17,132.94 there is hereby levied, apportioned and assessed against the
following described lots and pieces of land as provided for in Section 1 of this ordinance
the following amounts:
10,235.50
RIVERSIDE PARK ADDITION
Block 10
E2 Lot
1 - - - - - - - - - - - - - - - - - - - - -
- - 741.70
E 81'
Lot 2 - - - - - - - - - - - - - - - - - - - -
- - 660.79
EZ Lot
3 - - - - - - - - - - - - - - - - - - - - -
- - 674.28
E2 Lot
4 - - - - - - - - - - - - - - - - - - - - -
- - 674.28
E2 Lot
5 - - - - - - - - - - - - - - - - - - - - -
- - 674.28
E2 Lot
6 - - - - - - - - - - - - - - - - - - - - -
- - 674.28
EZ Lot
7 - - - - - - - - - - - - - - - - - - - - -
- - 674.28
El Lot
-----------------------
674.28
EZ Lot
9 - - - - - - - - - - - - - - - - - - - - -
- - 674.28
E2 Lot
10 - - - - - - - - - - - - - - - - - - - - -
- - 674.28
EZ Lot
11 - - - - - - - - - - - - - - - - - - - - -
- - 674.28
EZ Lot
12 - - - - - - - - - - - - - - - - - - - - -
- - 674.28
EZ Lot
13 - - - - - - - - - - - - - - - - - - - - -
- - 674.28
E 822'
Lots 14-15 - - - - - - - - - - - - - - - - -
- - 1,415.93
10,235.50
CONSOLIDATED-SALINA
j
RIVERVIEW ADDITION
Block 1
I
Lot 1 Less Riverside
Drive - - - - - - - - - - - - -
- 1,257.02
Lots 3&4 - - -
- - - - - - - - - - - - - - - - - -
- 2,430.24
i
3,687.26
Block 2
i
Lots 1 & 2 - - -
- - - - - - - - - - - - - - - - - -
- 930.94
Lot 3 - - - - - -
- - - - - - - - - - - - - - - - - -
- 449.43
Lot 7 - - - - - -
- - - - - - - - - - - - - - - - - -
- 481.53
Lot 8 - - - - - -
- - - - - - - - - - - - - - - - - -
- 449.43
Lots 9-10 - - - -
- - - - - - - - - - - - - - - - - -
- 898.85
I
3,210.18
i
Section 25. For that
part of the cost of paving and grading of Pershing Street with
concrete (Twenty-seven (27)
feet wide from toe of gutter to toe of gutter) from the south
j
line of Beloit Street to the
north line of Sunset Drive, which
is chargeable against the
private property within the
district chargeable therefore, and
which cost is hereby
i
determined to be $1,984.67
there is hereby levied, apportioned
and assessed against the
following described lots and
pieces of land as provided for in
Section 1 of this ordinance
I
the following amounts:
HIGHLAND COURT ADDITION
Block 5
W 25' Lot 5 - - -
- - - - - - - - - - - - - - - - - -
- 53.93
I
Lot 6 - - - - - -
- - - - - - - - - - - - - - - - -
- - 107.86
Lots 7 & 8 - - -
- - - - - - - - - - - - - - - - - -
- 226.51
Lot 9 - - - - - -
- - - - - - - - - - - - - - - - - -
- 118.66
Lot 10 - - - - -
- - - - - - - - - - - - - - - - -
- - 107.86
Lot 11 - - - - -
- - - - - - - - - - - - - - - - - -
- 107.86
W 25' Lot 12 - -
- - - - - - - - - - - - - - - - - -
- 53.93
776.61
Block 9
Lot 1 - - - - - -
- - - - - - - - - - - - - - - - -
- - 118.66
Lot 2 - - - - - -
- - - - - - - - - - - - - - - - -
- - 107.86
Lot 3 - - - - - -
- - - - - - - - - - - - - - - - -
- - 107.86
Lot 4 - - - - - -
- - - - - - - - - - - - - - - - -
- - 107.86
I �
I
Lot 5 - - - - - -
- - - - - - - - - - - - - - - - -
'
- - 107.86
�
I
E 25' Lot 6 - - -
- - - - - - - - - - - - - - - - -
I
- - 53.93
I
E 25' Lot 17 - -
- - - - - - - - - - - - - - - - -
- - 53.93
I
Lot 18 - - - - -
- - - - - - - - - - - - - - - - -
- - 107.86
Lot 19 - - - - -
- - - - - - - - - - - - - - - - -
- - 107.86
Lot 20 - - - - -
- - - - - - - - - - - - - - - - -
- - 107.86
I
Lot 21 - - - - -
- - - - - - - - - - - - - - - - -
- - 107.86
1
1
1
CONSOLIDATED-$&LINA
Lot 22 - - - - - - - - - - - - - - - - - - - - - - - - 118.66
1,208.06
'
I
Section 26. For that part of the cost of paving and grading of Pershing Street with
i
concrete (Twenty-seven (27) feet wide from toe of gutter to toe of gutter) from the south
I
line of Sunset Drive to the north line of Ellsworth Street, which is chargeable against
I
the private property within the district chargeable therefore, and which cost is hereby
determined to be $2,270.34 there is hereby levied, apportioned and assessed against the
following described lots and pieces of land as provided for in Section 1 of this ordinance,
the following amounts:
HIGHLAND COURT ADDITION
Block 6
W 25' Lot 5 - - - - - - - - - - - - - - - - - - - - - - 61.69
Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 123.39
Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 123.39
Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 135.73
Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 135.73
Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 123.39
Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 123.39
W 25' Lot 12 - - - - - - - - - - - - - - - - - - - - - 61.69
I ' I
i
888.40
Block 10
Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 135.72
Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 123.39
Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 123.39
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 123.39
Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 123.39
E 25' Lot 6 - - - - - - - - - - - - - - - - - - - - - - 61.69
i
E 25' Lot 17 - - - - - - - - - - - - - - - - - - - - - 61.69
Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 123.39
Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 123.39
I
Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 123.39
Lot 21 - - - - - - - - - - - - - - - - - - - - - - - - 123.39
Lot 22 - - - - - - - - - - - - - - - - - - - - - - - - 135.72
II I
1,381.94
Section 27. For that part of the cost of paving and grading of Republic Avenue with
concrete (Twenty-eight (28) feet wide from toe of gutter to toe of gutter) from the west
line of Funston Avenue to the east line of the Missouri Pacific Railroad, which is chargeable
against the private property within the district chargeable therefore, and which cost is
hereby determined to be $8,145.84 there is hereby levied, apportioned and assessed against
the following described lots and pieces of land as provided for in Section 1 of this
ordinance, the following amounts:
CONSOLIDATED-SALINA
SOUTHERN HEIGHTS ADDITION
Block 24
Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 100.38
Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 100.38
Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 100.38
l Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 100.38
Lot 11 & N 7' Lot 12 - - - - - - - - - - - - - - - - - 114.45
Lot 12 Less N 7' - - - - - - - - - - - - - - - - - - - 110.43
626.40
Block 23
Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 115.35
Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 115.35
Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 115.35
Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 115.35
W2 Lots 11-12 - - - - - - - - - - - - - - - - - - - - - 149.96
EZ Lots 11-12 - - - - - - - - - - - - - - - - - - - - - 149.96
E 622' Lots 13-14 - - - - - - - - - - - - - - - - - - - 149.96
W 622' Lots 13-14 - - - - - - - - - - - - - - - - - - - 149.96
S 45' Lot 15 - - - - - - - - - - - - - - - - - - - - - 103.82
N 5' Lot 15 & All Lot 16 & S 25' Lot 17 - - - - - - - - 184.57
N 25' Lot 17 & All Lot 18 - - - - - - - - - - - - - - - 173.04
1,522.67
Block 22
Lot 7 -
- - - - - - - - - - - - - - - - - - - - - -
- - 115.35
Lot 8 -
- - - - - - - - - - - - - - - - - - - - - -
- - 115.35
Lot 9 -
- - - - - - - - - - - - - - - - - - - - - -
- - 115.35
Lot 10
- - - - - - - - - - - - - - - - - - - - - -
- - 115.35
W2 Lots
11-12 - - - - - - - - - - - - - - - - - - -
- - 149.97
E2 Lots
11-12 - - - - - - - - - - - - - - - - - - -
- - 149.97
W2 Lots
13-14 - - - - - - - - - - - - - - - - - - -
- - 149.97
E2 Lots
13-14 - - - - - - - - - - - - - - - - - - -
- - 149.97
Lot 15
- - - - - - - - - - - - - - - - - - - - - -
- - 115.35
Lot 16
- - - - - - - - - - - - - - - - - - - - - -
- - 115.35
Lot 17
- - - - - - - - - - - - - - - - - - - - - -
- - 115.35
i
Lot 18
I
- - - - - - - - - - - - - - - - - - - - - -
- - 115.35
1,522.68
HIGHLAND COURT ADDITION
Block 15
Lot 12
- - - - - - - - - - - - - - - - - - - - -
- -- 196.15
Lot 11
- - - - - - - - - - - - - - - - - - - - -
- - - 183.07
Lot 10
- - - - - - - - - - - - - - - - - - - - - -
- - 183.07
CONSOLIDATED-SALINA
I
Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - -
183.07
Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - -
183.07
I
I
Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - -
183.07 j
Tract West of Highland Court Addition - Sunset Park - -
3,362.59
4,474.09
Section 28. For that part of the cost of paving and grading
of Stapler Avenue with
concrete (Twenty-eight (28) feet wide from toe of gutter to toe of
gutter) from the east
line of Delaware Avenue to the west line of Indiana Avenue, which
is chargeable against
the private property within the district chargeable therefore, and
which cost is hereby
determined to be $4,322.01 there is hereby levied, apportioned and
assessed against the
following described lots and pieces of land as provided for in Section
1 of this ordinance,
the following amounts:
i
HANSON COURT ADDITION
Block 1
Lots 10-22 Incl . - - - - - - - - - - - - - - - - - - -
2,227.15
UPPER MILL ADDITION
Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - -
198.35
Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - -
153.11
i
Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - -
313.19
i
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - -
212.25
l
A Lot 5 - - - - - - - - - - - - - - - - - - - - - - -
104.40
N 11' Lot 14 - - - - - - - - - - - - - - - - - - - - -
27.84
Lot 15 - - - - - - - - - - - - - - - - - - - - - - - -
288.83
i
Lot 16 - - - - - - - - - - - - - - - - - - - - - - - -
344.51
Lot 17 - - - - - - - - - - - - - - - - - - - - - - - -
208.79
Lot 18 - - - - - - - - - - - - - - - - - - - - - - - -
243.59
2,094.86
Section 29. For that part of the cost of curbing, guttering,
paving and grading of
Stack Avenue with concrete (Thirty-three (33) feet wide from back
of curb to back of curb)
from the west side of Missouri Avenue to the east side of Indiana
Avenue, which is
chargeable against the private property within the district chargeable
therefore, and which
cost is hereby determined to be $2,133.06 there is hereby levied,
apportioned and assessed
I
against the following described lots and pieces of land as provided
for in Section 1 of
this ordinance, the following amounts:
STACK PLACE
Block 4
I
I
A Lots 6 & 7 - - - - - - - - - - - - - - - - - - - - -
106.15
A Lots 8 & 9 - - - - - - - - - - - - - - - - - - - - -
151.64
W2 Lots 10 & 11 - - - - - - - - - - - - - - - - - - - -
151.64
EZ Lots 6 & 7 - - - - - - - - - - - - - - - - - - - - -
92.67
III
Ez Lots 8 & 9 - - - - - - - - - - - - - - - - - - - - -
'
151.64
CONSOLIDATED-SALINA
E 71' Lots 10-11 - - - - - - - - - - - - - - - - - - - 151.64
Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 160.06
965.44
Block 8
N 5' Lot 2 & All Lot 1 - - - - - - - - - - - - - - - - 176.90
S 40' Lot 2 & N 9' Lot 3 - - - - - - - - - - - - - - - 165.12
S 36' Lot 3 & N 13' Lot 4 - - - - - - - - - - - - - - - 165.12
S 32' Lot 4 & N 17' Lot 5 - - - - - - - - - - - - - - - 165.12
S 28' Lot 5 & N 21' Lot 6 - - - - - - - - - - - - - - - 165.12
S 24' Lot 6 & N 25' Lot 7 - - - - - - - - - - - - - - - 165.12
S 20' Lot 7 & N 29' Lot 8 - - - - - - - - - - - - - - - 165.12
j 1,167.62
Section 30. For that part of the cost of curbing, guttering, paving and grading of
Seventh Street with concrete (Thirty-three (33) feet wide from back of curb to back of
curb) from the south property line of Lincoln Avenue to the north right-of-way line of the
Union Pacific Railroad, which is chargeable against the private property within the district
chargeable therefore, and which cost is hereby determined to be $3,960.77 there is hereby
levied, apportioned and assessed against the following described lots and pieces of land
i
as provided for in Section 1 of this ordinance, the following amounts:
CALKINS ADDITION
i
Block 4
Lot 36 - - - - - - - - - - - - - - - - - - - - - - - - 84.72
I
jLots 37-38-39 - - - - - - - - - - - - - - - - - - - - - 635.42
j
Lots 40 to 44 Incl. - - - - - - - - - - - - - - - - -- 1,059.03
Lots 45-46 - - - - - - - - - - - - - - - - - - - - - - 508.33
I
2,287.50
Block 9
Lots 1 & 2 - - - - - - - - - - - - - - - - - - - - - - 508.33
Lots 3-4-5 - - - - - - - - - - - - - - - - - - - - - - 635.42
Lots 6-7 - - - - - - - - - - - - - - - - - - - - - - - 423.61
Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 105.91
1,673.27
Section 31. For that part of the cost of paving and grading of South Second Street
with concrete (Twenty-eight (28) feet wide from edge of gutter to edge of gutter) from
150 feet south of Wilson Street to a point 23 feet north of the south line of Lot 15,
i
Block 6, Hutchinson's Addition, which is chargeable against the private property within
the district chargeable therefore, and which cost is hereby determined to be $2,168.32
there is hereby levied, apportioned and assessed against the following described lots and
pieces of land as provided for in Section 1 of this ordinance, the following amounts:
U
CONSOLIDATED-SALINA
it I
HUTCHINSON ADDITION
Block 6
Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 305.48
j
Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 305.48
I
i
Lot 13 & N 28' Lot 15 - - - - - - - - - - - - - - - - - 473.20
1,084.16
Block 5
Pt Lot 10 - - - - - - - - - - - - - - - - - - - - - - - 149.75
i
Pt Lots 12 & 14 - - - - - - - - - - - - - - - - - - - - 74.87
Pt Lots 10-14-12-16 - - - - - - - - - - - - - - - - - 859.54
1,084.16
Section 32. For that part of the cost of curbing, guttering, paving and grading of
South Second Street with concrete (Thirty-three (33) feet wide from back of curb to back
of curb) from a point 23 feet north of the south line of Lot 15, Block 7 Hutchinsons
Addition to the south line of Lot 19 of said block, which is chargeable against the private
property within the district chargeable therefore, and which cost is hereby determined to
be $1,522.68 there is hereby levied, apportioned and assessed against the following
described lots and pieces of land as provided for in Section 1 of this ordinance, the
following amounts:
I
HUTCHINSONS ADDITION
Block 6
Lot 15 Less N 28' & Lots 17-19 - - - - - - - - - - - - 761.34
Lot 16 Less N 28' & Lots 18 & 20 - - - - - - - - - - - 761.34
i
1,522.68
Section 33. For that part of the cost of curbing, guttering, paving and grading of
Wayne Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb)
from the east line of Ohio Street to the west line of Huntington Road, which is chargeable
against the private property within the district chargeable therefore, and which cost is
hereby determined to be $15,873.50 there is hereby levied, apportioned and assessed against
the following described lots and pieces of land as provided for in Section 1 of this
ordinance, the following amounts:
MAYFAIR ADDITION
Block 3
Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 612.48
Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 593.91
Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 519.67
� I
i
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - -
519.67
Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 519.67
Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 612.48
3,377.88
Block 4
I
Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 609.13
I
CONSOLIDATED-SALINA
1
1
Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 516.83
Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 516.83
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 609.13
2,251.92
Block 5
Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 679.81
Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 613.67
Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 679.81
1,973.29
3,377.88
Block 2
Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 541.53
Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 522.87
Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 522.87
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 485.52
Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17
Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17
Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17
Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17
Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 504.19
Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 522.87
4,892.53
Section 34. Said amounts so levied, apportioned and assessed as aforesaid will be
due and collectible in ten equal installments, the first becoming due with the taxes levied
for the year 1963, and one of said installments falling due each and every year thereafter
until all are paid and all to be collected with interest as in this ordinance provided,
I
HOWEVER, that the owner of any piece of property liable for any such assessment may redeem
his property from such liability by paying to the City Treasury the entire amount chargeable
I
against the same, as in this ordinance provided, at any time within thirty days after the
i
publication of this ordinance and before the issuance of bonds of said City in payment of
I
the balance of the cost of said improvements, the property so paid on shall not hereafter
be liable for any further assessments for the cost of such improvements nor for any part
of said bonds.
Block 1
Lot
1 - - - - - - - - - - - - - - - - - - - - -
- - - - 612.48
Lot
2 - - - - - - - - - - - - - - - - - - - - -
- - - - 593.91
Lot
3 - - - - - - - - - - - - - - - - - - - - -
- - - - 519.67
Lot
4 - - - - - - - - - - - - - - - - - - - - -
- - - - 519.67
Lot
5 - - - - - - - - - - - - - - - - - - - - -
- - - - 519.67
Lot
6 - - - - - - - - - - - - - - - - - - - - -
- - - - 612.48
3,377.88
Block 2
Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 541.53
Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 522.87
Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 522.87
Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 485.52
Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17
Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17
Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17
Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 448.17
Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 504.19
Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 522.87
4,892.53
Section 34. Said amounts so levied, apportioned and assessed as aforesaid will be
due and collectible in ten equal installments, the first becoming due with the taxes levied
for the year 1963, and one of said installments falling due each and every year thereafter
until all are paid and all to be collected with interest as in this ordinance provided,
I
HOWEVER, that the owner of any piece of property liable for any such assessment may redeem
his property from such liability by paying to the City Treasury the entire amount chargeable
I
against the same, as in this ordinance provided, at any time within thirty days after the
i
publication of this ordinance and before the issuance of bonds of said City in payment of
I
the balance of the cost of said improvements, the property so paid on shall not hereafter
be liable for any further assessments for the cost of such improvements nor for any part
of said bonds.
CONSOLIDATED-SALINA
1
Section 35, There is hereby levied further and assessed against such lots and pieces
of ground described in this ordinance, interest at such rate per annum as shall be borne
by the bonds which may be issued at the end of thirty days as specified in the preceding
sections hereof, as by law provided, to the time of the collection of the installments as
provided by law, which said interest shall be collected annually at the same time and in
I
the same manner as said installments are collected and after the taking effect of this
I
ordinance and the fixing of said interest rate when such bonds are authorized and issued,
it shall be the duty of the City Clerk of said City to annually at the same time other
taxes are certified and until all said assessments so apportioned and levied have been
certified to the County Clerk of Saline County, Kansas, a full list of all property liable
to assessment and taxation for such work and improvement, except such property on which the
special assessments aforesaid have been paid in full as hereinbefore provided, together with II'
the respective amounts due on each of said lots and pieces of ground which amounts shall
include the annual installments of such special assessments with the interest for one year
at the rate to be fixed as provided for in this ordinance, on all unpaid balances of said
assessments, and such amounts so certified as herein provided shall be placed upon the tax
roll by the County Clerk of Saline County, Kansas, and collected as other taxes are collected;
Section 36, This ordinance shall take effect and be in full force from and after its
adoption and publication once in the official city paper.
(SEAL)
Attest:
City Clerk
Introduced: December 4, 1962
Passed: December 11, 1962
�i
Mayor