Loading...
6675 Levy AssessmentsCONSOLIDATED-SALINA ORDINANCE NUMBER (Published in The Salina Journal PAZ/- 1962) AN ORDINANCE levying assessments on lots, pieces and parcels of ground in the City of Salina, Kansas, for the purpose of paying a portion of the cost of: 1. This improvement consists of the curbing, guttering and paving of: (a) Quincy Avenue from the north line of Lot 7, Block 6 Belmont Addition to the north line of Magnolia Road. (b) Magnolia Road from the west line of Quincy to the east line of Ohio Street. (c) Ohio Street from the south line of Oxford to the north line of Magnolia Road. (d) Saxwood Drive from the east line of Belmont Boulevard to the north line of Magnolia Road. (e) Montclair Drive from the east line of Quincy Avenue to the west line of Belmont Boulevard and from the east line of Belmont Boulevard to the north line of Magnolia Road. (f) Belmont Boulevard from the south line of Mayfair Drive to the north line of Magnolia Road. (g) Mayfair Drive from the north line of Lot 30, Block 20, Belmont Addition to the north line of Magnolia Road. (h) Kensington Road from the north line of Lot 11, Block 20, Belmont Addition to the north line of Magnolia Road. (i) Wesley Avenue from the north line of Lot 9, Block 18 Belmont Addition to the west line of Edward Street. (j) Edward Street from the north line of LaShalle to the north line of Magnolia Road. (k) Brentwood Drive from the south line of Roach Street to the north line of Magnolia Road. (1) LaShalle Lane from the east line of Kensington to the west line of Wesley, and from the east line of Wesley to the west line of Edward, and from the east line of Edward to the west line of Roach Street, and from the east line of Roach to the west line of Pearl Street. 2. Water main to be installed in all the above described streets except Ohio Street which has an existing 6" water main. 3. The sanitary sewer to serve all lots and parcels within the benefit district. WHEREAS, Pursuant to proceedings regularly had according to law, contracts have been let for the following improvements in the City of Salina, Kansas: 1. This improvement consists of the curbing, guttering and paving of: (a) Quincy Avenue from the north line of Lot 7, Block 6 Belmont Addition to the north line of Magnolia Road. (b) Magnolia Road from the west line of Quincy to the east line of Ohio Street. (c) Ohio Street from the south line of Oxford to the north line of Magnolia Road. (d) Saxwood Drive from the east line of Belmont Boulevard to the north line of Magnolia Road. (e) Montclair Drive from the east line of Quincy Avenue to the west line of Belmont Boulevard and from the east line of Belmont Boulevard to the north line of Magnolia Road. (f) Belmont Boulevard from the south line of Mayfair Drive to the north line of Magnolia Road. CONSOLIDATED -SAUNA 1 (g) Mayfair Drive from the north line of Lot 30, Block 20, Belmont Addition to the north line of Magnolia Road. (h) Kensington Road from the north line of Lot 11, Block 20, Belmont Addition to the north line of Magnolia Road. (i) Wesley Avenue from the north line of Lot 9, Block 18 Belmont Addition to the west line of Edward Street. (j) Edward Street from the north line of LaShalle to the north line of Magnolia Road. (k) Brentwood Drive from the south line of Roach Street to the north line of Magnolia Road. (1) LaShalle Lane from the east line of Kensington to the west line of Wesley, and from the east line of Wesley to the west line of Edward, and from the east line of Edward to the west line of Roach Street, and from the east line of Roach to the west line of Pearl Street. 2. Water main to be installed in all the above described streets except Ohio Street which has an existing 6" water main. 3. The sanitary sewer to serve all lots and parcels within the benefit district. and such contracts have been duly performed, and WHEREAS, the Board of Commissioners has determined that the total cost of such improvements Thi. lig r r , A. , 7 is ... r .<<ti 7-�f T , z�`..•r . �,; Dollars ($� �0 . � �� ) and that �f . � J per cent in the amount of $ "i , thereof be assessed against the improve - i ment district and f �y 0 w per cent in the amount of I $ be paid by the City at large, and WHEREAS, the Board of Commissioners has, after due notice, met and determined the amount of such special assessments, SO NOW, THEREFORE BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas: Section 1. Special assessments to pay the cost of such improvements with accrued interest be and the same are hereby levied against the several lots, pieces and parcels of land liable for special assessments for said improvement as follows: BELMONT ADDITION Block 6 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 1,311.23 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 1,874.39 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 2,375.20 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 12974.54 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 2,926.09 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 2,229.66 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 21369.79 15,060.90 Block 7 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 1,976.84 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 2,545.09 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 2,726.65 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 3,293.12 CONSOLIDATED -SALIVA 3,625.08 � Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 10,419.67 I I 20,961.37 ; Lot 9 - - - - - - - - - - - - - - - - - - - - - Block 9 I I Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 254.07 ( Lot 11 - - - - - - - - - - - - - - - - - - - - i Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 294.91 Lot 12 - - - - - - - - - - - - - - - - - - - - Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 349.35 Lot 13 - - - - - - - - - - - - - - - - - - - - Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 503.61 Lot 14 - - - - - - - - - - - - - - - - - - - - Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 322.12 I Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 258.61 j Lot 25 - - - - - - - - - - - - - - - - - - - - Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 231.38 Lot 26 - - - - - - - - - - - - - - - - - - - - i Lot 12 Plus SE 7' Lot 23 - - - - - - - - - - - - - - - 213.23 N 60' Lot 27 - - - - - - - - - - - - - - - - - I SE 1 Lot 19 - - - - - - - - - - - - - - - - - - - - - - 140.64 E 27' Lot 27 & NW 54' Lot 28 - - - - - - - - - Lot 20 - - - - - - - - - - - - - - - - - - - - - - - 294.91 E 24' Lot 28 & Lot 29 Less E 5' - - - - - - - - i Lot 21 - - - - - - - - - - - - - - - - - - - - - - - - 294.91 Lot 30 Plus E 5' Lot 29 - - - - - - - - - - - - Lot 22 - - - - - - - - - - - - - - - - - - - - - - - - 272.22 Lot 31 - - - - - - - - - - - - - - - - - - - - Lot 23 Less SE 7' - - - - - - - - - - - - - - - - - - - 195.12 3,625.08 3,065.09 Block 11 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 288.28 I Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 288.28 i Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 310.45 Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 288.28 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 288.28 Block 10 i Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 184.81 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 184.81 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 224.62 Lot 11 - - - - - - - - - - - - - - - - - - - - i - - - - 233.15 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 275.80 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 244.52 Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 241.68 Lot 24 - - - - - - - - - - - - - - - - - - - - - - - - 184.81 Lot 25 - - - - - - - - - - - - - - - - - - - - - - - - 184.81 Lot 26 - - - - - - - - - - - - - - - - - - - - - - - - 207.56 N 60' Lot 27 - - - - - - - - - - - - - - - - - - - - - 135.60 E 27' Lot 27 & NW 54' Lot 28 - - - - - - - - - - - - - 170.75 E 24' Lot 28 & Lot 29 Less E 5' - - - - - - - - - - - - 210.15 Lot 30 Plus E 5' Lot 29 - - - - - - - - - - - - - - - - 182.95 Lot 31 - - - - - - - - - - - - - - - - - - - - - - - - 199.07 3,065.09 Block 11 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 288.28 I Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 288.28 i Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 310.45 Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 288.28 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 288.28 CONSOLIDATED -SALIVA Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 310.45 I 1,774.02 Block 12 6,585.67 Block 13 Lot 6 Except NW 4' & NW 4' Lot 7 - - - - - - - - - - - 232.36 Lot 7 Less NW 4' Plus NW 4' Lot 8 - - - - - - - - - - - 232.36 Less NW 4' Lot 8 - - - - - - - - - - - - - - - - - - - 232.36 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 232.36 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 250.23 i Lot 16 Less SE 5' - - - - - - - - - - - - - - - - - - - 214.51 Lot 17 & SE 5' Lot 16 - - - - - - - - - - - - - - - - - 250.21 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - 232.36 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 1,150.81 I Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 1,233.82 4,261.38 Block 14 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 250.23 i Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 310.45 I Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 288.28 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 288.28 i Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 368.11 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 385.85 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 354.50 i Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 288.27 Lot 8 Less E 2.5' - - - - - - - - - - - - - - - - - - - 269.28 Lot 9 Plus E 2.5' Lot 8 - - - - - - - - - - - - - - - - 256.62 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 272.69 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 310.45 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 288.28 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 288.28 NW 62' Lot 14 - - - - - - - - - - - - - - - - - - - - - 274.99 NW 58' Lot 15 & S 3' Lot 14 - - - - - - - - - - - - - - 270.56 Lot 16 I Less SE 7' & Plus SE 7' Lot 15 - - - - - - - - - 293.89 I Lot 17 & SE 7' Lot 16 - - - - - - - - - - - - - - - - - 238.09 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 253.21 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 253.21 Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 253.21 Lot 21 - - - - - - - - - - - - - - - - - - - - - - - - 253.21 Lot 22 - - - - - - - - - - - - - - - - - - - - - - - - 253.21 Lot 23 - - - - - - - - - - - - - - - - - - - - - - - - 272.75 6,585.67 Block 13 Lot 6 Except NW 4' & NW 4' Lot 7 - - - - - - - - - - - 232.36 Lot 7 Less NW 4' Plus NW 4' Lot 8 - - - - - - - - - - - 232.36 Less NW 4' Lot 8 - - - - - - - - - - - - - - - - - - - 232.36 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 232.36 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 250.23 i Lot 16 Less SE 5' - - - - - - - - - - - - - - - - - - - 214.51 Lot 17 & SE 5' Lot 16 - - - - - - - - - - - - - - - - - 250.21 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - 232.36 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 1,150.81 I Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 1,233.82 4,261.38 Block 14 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 250.23 CONSOLIDATED-SALINA Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 232.36 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 232.36 i j Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - 297.01 I Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 678.00 I Lot 6 - - - - - - - - - - - - - - - - - - - - - - - -- 870.62 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 855.21 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 624,07 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 854.24 I j Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 1,541.10 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 1,186.37 I Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 1,169.49 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 1,242.48 Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 1,359.26 I i Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 1,359.26 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 1,359.26 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 1,359.26 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 1,359.26 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 1,359.26 Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 1,139.23 I Lot 21 - - - - - - - - - - - - - - - - - - - - - - - - 1,062.98 Lot 22 - - - - - - - - - - - - - - - - - - - - - - - - 1,062.98 Lot 23 - - - - - - - - - - - - - - - - - - - - - - - - 1,062.98 Lot 24 - - - - - - - - - - - - - - - - - - - - - - - - 1,062.98 Lot 25 - - - - - - - - - - - - - - - - - - - - - - - - 1,017.21 Lot 26 - - - - - - - - - - - - - - - - - - - - - - - - 1,017.21 i Lot 27 - - - - - - - - - - - - - - - - - - - - - - - - 1,017.21 Lot 28 - - - - - - - - - - - - - - - - - - - - - - - - 1,813.17 Lot 29 - - - - - - - - - - - - - - - - - - - - - - - - 1,681.77 Lot 30 - - - - - - - - - - - - - - - - - - - - - - - - 1,368.09 Lot 31 - - - - - - - - - - - - - - - - - - - - - - - - 1,368.09 Lot 32 - - - - - - - - - - - - - - - - - - - - - - - - 1,368.09 Lot 33 - - - - - - - - - - - - - - - - - - - - - - - - 1,430.83 I Lot 34 - - - - - - - - - - - - - - - - - - - - - - - - 1,430.82 Lot 35 - - - - - - - - - - - - - - - - - - - - - - - - 1,430.82 Lot 36 - - - - - - - - - - - - - - - - - - - - - - - - 1,535.45 40,059.01 Block 15 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 817.67 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 702.69 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 581,77 CONSOLIDATED -SALIVA 1 1 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 676.96 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 1,293.15 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 1,293.15 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 1,293.15 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 1,293.15 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 1,380.59 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 1,520.50 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 1,520.50 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 1,520.50 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 1,520.50 Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 1,520.50 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 1,601.81 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 1,201.05 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 1,169.49 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 1,169.49 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 1,169.48 Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 1,256.92 Lot 21 - - - - - - - - - - - - - - - - - - - - - - - - 1,396.83 Lot 22 - - - - - - - - - - - - - - - - - - - - - - - - 1,396.83 Lot 23 - - - - - - - - - - - - - - - - - - - - - - - - 1,396.83 Lot 24 - - - - - - - - - - - - - - - - - - - - - - - - 1,396.83 Lot 25 - - - - - - - - - - - - - - - - - - - - - - - - 1,396.83 Lot 26 - - - - - - - - - - - - - - - - - - - - - - - - 1,498.84 32,986.01 Block 16 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 294.55 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 294.55 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 317.21 Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 294.55 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 294.55 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 317.21 1,812.62 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 11374.52 Block 17 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 1,791.95 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 1,669.08 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 1,669.08 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 1,669.08 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 1,669.08 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 1,669.08 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 1,374.53 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 11374.52 CoNSoLIDATED-SALIVA n L� 11 36,353.25 Lot j 9 - - - - - - - - - - - - - - - - - - - - - - - - - 1,374.52 6 - - - - - - - - - - - - - - - - - - - - - Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 1,514.84 - - - - 269.42 Lot Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 1,254.24 9 - - - - - - - - - - - - - - - - - - - - - - - - - 1,194.05 Lot i 12 -- - - - - - - - - - - - - - - - - - - - - - - - 1,819.25 Lot 16 - - - - - - - - - - - - - - - - - - - - Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 1,694.41 - - - - 288.67 Lot Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 1,694.41 19 - - - - - - - - - - - - - - - - - - - - - - - - 288.67 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 1,694.41 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 1,694.41 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 1,694.49 Lot I 18 - - - - - - - - - - - - - - - - - - - - - - - - 1,399.86 I Lot � 19 - - - - - - - - - - - - - - - - - - - - - - - - 1,399.86 Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 1,399.86 I Lot i 21 - - - - - - - - - - - - - - - - - - - - - - - - 1,542.91 Lot I 22 - - - - - - - - - - - - - - - - - - - - - - - - 1,297.67 Lot 23 - - - - - - - - - - - - - - - - - - - - - - - - 1,991.71 n L� 11 36,353.25 4,742.99 Block 19 Lot Block 18 - - - - - - - - - - - 1,641.71 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 269.42 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 269.42 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 269.42 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 1,194.05 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 1,274.24 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 288.67 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 288.67 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 288.67 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 288.67 Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 311.76 4,742.99 Block 19 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 1,641.71 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 1,537.02 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 1,537.02 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 1,537.02 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 1,537.02 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 1,537.02 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 1,517.64 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 1,511.90 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 1,985.17 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 2,067.48 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 1,614.79 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 1,388.43 CONSOLIDATED -SALIVA 46,860.39 Block 20 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 1,494.16 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 1,494.16 I Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 1,494.16 i Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 1,494.16 I Lot 15 - - - - - - - - - - - - - - - - - - - - - - -- 1,494.16 I Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 1,494.16 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 1,422.66 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 1,357.00 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 1,378.87 Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 2,221.25 Lot 30 - - - - - - - - - - - - - - - - - - - - - - - - 1,449.63 Lot 31 - - - - - - - - - - - - - - - - - - - - - - - - 1,449.63 i Lot 32 - - - - - - - - - - - - - - - - - - - - - - - - 1,449.63 I Lot 33 - - - - - - - - - - - - - - - - - - - - - - - - 1,449.63 i Lot 34 - - - - - - - - - - - - - - - - - - - - - - - - 1,449.63 i I Lot 35 - - - - - - - - - - - - - - - - - - - - - - - - 1,378.13 Lot 36 - - - - - - - - - - - - - - - - - - - - - - - - 1,590.14 Lot 37 - - - - - - - - - - - - - - - - - - - - - - - - 1,932,87 I Lot 38 - - - - - - - - - - - - - - - - - - - - - - - - 1,552.71 29,046.74 Block 21 Lot 1 Less S 7' - - - - - - - - - - - - - - - - - - - - 369.64 S 7' Lot 1 & Lot 2 - - - - - - - - - - - - - - - - - - 341.68 Lot 13 - - - - -- - - - - - - - - - - - - - - - - - - - 1,203.24 Lot I 14 - - - - - - - - - - - - - - - - - - - - - - - - 1,140.15 i Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 1,315.00 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 2,731.84 i I Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 1,710.69 Lot i 18 - - - - - - - - - - - - - - - - - - - - - - - - 1,589.28 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 1,589.28 Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 1,589.28 Lot 21 - - - - - - - - - - - - - - - - - - - - - - - - 1,589.41 Lot 22 - - - - - - - - - - - - - - - - - - - - - - - - 1,807.03 Lot 23 - - - - - - - - - - - - - - - - - - - - - - - - 1,807.03 Lot 24 - - - - - - - - - - - - - - - - - - - - - - - - 1,807.03 Lot i 25 - - - - - - - - - - - - - - - - - - - - - - - - 1,807.03 Lot 26 - - - - - - - - - - - - - - - - - - - - - - - - 2,455.99 Lot 27 - - - - - - - - - - - - - - - - - - - - - - - - 3)305.89 46,860.39 Block 20 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 1,494.16 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 1,494.16 I Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 1,494.16 i Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 1,494.16 I Lot 15 - - - - - - - - - - - - - - - - - - - - - - -- 1,494.16 I Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 1,494.16 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 1,422.66 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 1,357.00 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 1,378.87 Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 2,221.25 Lot 30 - - - - - - - - - - - - - - - - - - - - - - - - 1,449.63 Lot 31 - - - - - - - - - - - - - - - - - - - - - - - - 1,449.63 i Lot 32 - - - - - - - - - - - - - - - - - - - - - - - - 1,449.63 I Lot 33 - - - - - - - - - - - - - - - - - - - - - - - - 1,449.63 i Lot 34 - - - - - - - - - - - - - - - - - - - - - - - - 1,449.63 i I Lot 35 - - - - - - - - - - - - - - - - - - - - - - - - 1,378.13 Lot 36 - - - - - - - - - - - - - - - - - - - - - - - - 1,590.14 Lot 37 - - - - - - - - - - - - - - - - - - - - - - - - 1,932,87 I Lot 38 - - - - - - - - - - - - - - - - - - - - - - - - 1,552.71 29,046.74 Block 21 Lot 1 Less S 7' - - - - - - - - - - - - - - - - - - - - 369.64 S 7' Lot 1 & Lot 2 - - - - - - - - - - - - - - - - - - 341.68 CONSOLIDATED -SALIVA 1 1 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 339.97 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 339.97 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 339.97 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 339.97 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 339.97 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 211.32 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 1,446.74 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 1,446.74 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 1,700.61 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 1,552.50 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 1,383.32 Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 1,615.98 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 1,802.57 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 1,850.53 Lot 17 - - - - - - - - - - - - - - - - - - - - - - - - 1,172.81 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 1,172.81 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 1,172.81 Lot 20 - - - - - - - - - - - - - - - - - - - - - - - - 1,044.16 Lot 21 - - - - - - - - - - - - - - - - - - - - - - - - 1,454.59 Lot 22 - - - - - - - - - - - - - - - - - - - - - - - - 1,454.59 Lot 23 - - - - - - - - - - - - - - - - - - - - - - - - 1,709.92 Lot 24 - - - - - - - - - - - - - - - - - - - - - - - - 2,114.21 Lot 25 - - - - - - - - - - - - - - - - - - - - - - - - 1,765.69 28,483.07 28,021.81 Block 23 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 3,656.98 Block 22 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 2,150.91 Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 2,260.35 Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 2,260.35 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 1,849.96 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 1,727.17 Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 1,727.17 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 1$74.34 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 2,083.71 Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 2,898.39 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 2,469.28 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 2,729.32 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 2,013.42 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 2,277.44 28,021.81 Block 23 Lot 1 - - - - - - - - - - - - - - - - - - - - - - - - - 3,656.98 CONSOLIDATED-SALINA I � Lot 2 - - - - - - - - - - - - - - - - - - - - - - - - - 4,288.09 j Lot 3 - - - - - - - - - - - - - - - - - - - - - - - - - 3,032.12 I 10,977.19 MAYFAIR ADDITION 8,513.29 Block 10 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 524.96 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 1,038.26 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 969.15 i Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 969.15 i Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 852.49 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 852.49 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 852.49 - - - - - - - - - - - - - - - - - - - - - - - Lot 17 - 969.15 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 969.17 7,997.31 Block 13 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 1,052.17 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 913.39 i Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 913.39 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 913.39 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 913.39 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 1,039.54 5,745.27 N 200` of NEI 36-14-3 23,412.45 E 200' of SWI 25-14-3 11,007.29 BELMONT ADDITION Block 6 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 407.70 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 451.78 Block 6 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 898.73 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 841.28 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 841.28 Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 841.28 Lot 14 - - - -- - - - - - - - - - - - - - - - - - - - - 841.28 LDt 15 - - - - - - - - - - - - - - - - - - - - - - - - 841.28 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 841.28 Lot 17 - - - - • - - - - - - - - - - - - - - - - - - - 841.27 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 841.27 Lot 19 - - - - - - - - - - - - - - - - - - - - - - - - 884.34 8,513.29 Block 10 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 524.96 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 1,038.26 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 969.15 i Lot 13 - - - - - - - - - - - - - - - - - - - - - - - - 969.15 i Lot 14 - - - - - - - - - - - - - - - - - - - - - - - - 852.49 Lot 15 - - - - - - - - - - - - - - - - - - - - - - - - 852.49 Lot 16 - - - - - - - - - - - - - - - - - - - - - - - - 852.49 - - - - - - - - - - - - - - - - - - - - - - - Lot 17 - 969.15 Lot 18 - - - - - - - - - - - - - - - - - - - - - - - - 969.17 7,997.31 Block 13 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 1,052.17 Lot 8 - - - - - - - - - - - - - - - - - - - - - - - - - 913.39 i Lot 9 - - - - - - - - - - - - - - - - - - - - - - - - - 913.39 Lot 10 - - - - - - - - - - - - - - - - - - - - - - - - 913.39 Lot 11 - - - - - - - - - - - - - - - - - - - - - - - - 913.39 Lot 12 - - - - - - - - - - - - - - - - - - - - - - - - 1,039.54 5,745.27 N 200` of NEI 36-14-3 23,412.45 E 200' of SWI 25-14-3 11,007.29 BELMONT ADDITION Block 6 Lot 4 - - - - - - - - - - - - - - - - - - - - - - - - - 407.70 Lot 5 - - - - - - - - - - - - - - - - - - - - - - - - - 451.78 CONSOLIDATED-SALINA Lot 6 - - - - - - - - - - - - - - - - - - - - - - - - - 517.89 I 1,377.37 � I Block 10 Lot 7 - - - - - - - - - - - - - - - - - - - - - - - - - 19.90 Section 2. Said amounts so levied, apportioned and assessed as aforesaid will be due and collectible in Twenty equal installments, the first becoming due with the taxes levied for the year 1963, and one of said installments falling due each and every year thereafter until all are paid and all to be collected with interest as in this ordinance provided, HOWEVER, that the owner of any piece or parcel of property liable for any such assessments may redeem his property from such liability by paying to the City Treasury the entire amount chargeable against the same, as in this ordinance provided, at any time within thirty days after the publication of this ordinance and before the issuance of bonds of said City in payment of the balance of the cost of said improvements, the property so paid j on shall not hereafter be liable for any further assessments for the cost of said improve- ments nor for any part of said bonds. i Section 3. There is hereby levied further and assessed against such lots and pieces i of ground described in this ordinance, interest at such rate per annum as shall be borne by bonds hereafter to be issued for the payment of the remaining unpaid cost of such improvements to be hereafter determined and fixed by Ordinance when such bonds are issued, I on all of said installments mentioned and provided for in this ordinance, from the date of the bonds which may be issued at the end of thirty days as specified in the preceding i sections hereof, as by law provided, to the time of the collection of the installments as provided by law, which said interest shall be collected annually at the same time and in the i same manner as said installments are collected and after the taking effect of this ordinance and the fixing of said interest rate when such bonds are authorized and issued, however, such interest rate shall not exceed 670 per annum, it shall be the duty of the City Clerk of said City to annually at the same time other taxes are certified, and until all of i said assessments so apportioned and levied have been certified to the County Clerk, of Saline County, Kansas, a full list of all property liable to assessments and taxation for i such work and improvement, except such property on which the special assessments aforesaid have been paid in full as hereinbefore provided, together with the respective amounts due on each of said lots and pieces of ground which amounts shall include the annual installments of special assessments together with the interest for one year at the rate to be fixed as i provided for in this ordinance, on all unpaid balances of such assessments such amounts so certified as herein provided shall be placed upon the tax roll by the County Clerk of Saline County, Kansas, and collected as other taxes are collected. Section 4. This ordinance shall take effect and be in full force from and after its adoption and publication once in the official city paper. (SEAL) Attest: 77-1 City Clerk Introduced: November 27, 1962 Passed: December 4, 1962 Mayo r