ORDINANCE NUMBER �?
(Published in The Salina Journal (� 1963)
AN ORDINANCE ratifying and confirming a contract with Brown and Brown Inc, for the
construction of certain improvements on certain streets in the City of Salina, Kansas,
and providing for the issuance of temporary notes to pay the cost thereof pending the
issuance and sale of bonds.
BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas:
Section 1. That the acceptance by the City of Salina, Kansas, of the proposal of
Brown and Brown Inc. hereinafter referred to as the "Contractor" as submitted to the Board
of Commissioners on December 2, 1963, which is hereby found to be the lowest and best bid
for such work, and the contract awarded by the Board of Commissioners of the City of Salina,
to said contractor and signed on behalf of the City by its Mayor on December 9, 1963 for
the construction of certain public improvements in the City of Salina, Kansas, to -wit:
The curbing, guttering, paving and grading of Antrim Avenue with
concrete (Thirty-three (33) feet wide from back of curb to back of
curb) from the east line of Fourth Street to the east line of Third
Street..
The curbing, guttering, paving and grading of Antrim Avenue with
concrete (Thirty-three (33) feet wide from back of curb to back of
curb) from the east line of Third Street to the west line of Front
Street.
The curbing, guttering, paving and grading of Eleventh Street with
concrete (Thirty-three (33) feet wide from back of curb to back of curb)
from the north line of Hamilton Avenue to the south line of Antrim
Avenue.
The curbing, guttering, paving and grading of Fourth Street on the
east side of railroad tracks with concrete (Thirty-one (31) feet wide
from back of curb to edge of slab) from the south line of Minneapolis
Avenue to the north line of Ellsworth Avenue.
The paving of Greeley Avenue with concrete (Eighteen (18) feet wide
from edge of pavement to edge of pavement) from the west line of West
Upper Mill Heights "Drive to the east line of East Upper Mill Heights
Drive.
The paving and grading of Seventh Street with concrete (Twenty-eight
(28) feet wide from toe of gutter to toe of gutter) from the north side
of Pacific Avenue to the south line of Harsh Avenue, the same being an
intervening connecting street.
The paving and grading of Seventh Street with concrete (Twenty-eight
(28) feet wide from toe of gutter to toe of gutter) from the north
side of Antrim Avenue to the south side of Otis Avenue, the same being
an intervening connecting street.
The curbing, guttering, paving and grading of Stack Avenue with concrete
(Twenty-two (22) feet wide from back of curb to back of curb) from
the east line of Indiana Avenue to the west line of Wisconsin Avenue,
the same being an intervening connecting street.
at and for the unit price for said work contained in said proposal, which proposal and
contract are hereby referred to and made parts of this ordinance, be and the same is
hereby ratified and confirmed, said proposal being within the estimated cost of said
improvements as shown by the sworn estimates of the City Engineer on file in the Office
of the City Clerk, which estimates are hereby referred to and made a part of this ordinance.
10
CONSOLIDATED-SALINA
1
1
Section 2. Said improvements shall be built and constructed in accordance with the
plans and specifications therefore prepared by the City. Engineer on file in the Office of
the City Clerk and in accordance with the proposal of said contractor and under the terms
of said contract, all of which are hereby referred to and made a part of this ordinance.
Section 3, That temporary notes signed by the Mayor and attest by the City Clerk be
issued from time to time as the work progresses in the manner and form as required by law,
the total amount thereof not to exceed the amount of $73,453.05 for such work, such notes
to bear interest not to exceed 5 per cent per annum and to mature not later than December
1, 1965, and to be issued in such amounts and at such times as money for the payment of
the cost of such notes being issued to said contractor and to be redeemed and cancelled
at the time that permanent bonds are issued in lieu thereof.
Section 4, That this ordinance shall take effect and be in full force from and after
its adoption and publication once in the official city paper.
Introduced: December 9, 1963
Passed: December 16, 1963
j, Mayo
(SEAL)
Attest:
A
1 City Clerk