Loading...
6876 Street ImprovementsCONSOLIDATED -SALIVA ORDINANCE NUMBER�- (Published in The Salina Journal 1965) AN ORDINANCE ratifying and confirming a contract with the 0. D. Wilmoth Excavating Contractor, Inc., for the construction of certain improvements on certain streets in the City of Salina, Kansas, and providing for the issuance of temporary notes to pay the cost thereof pending the issuance and sale of bonds. BE IT ORDAINED by the Board of Commissioners of the City of Salina, Kansas: Section 1. That the acceptance by the City of Salina, Kansas, of the proposal of the 0. D. Wilmoth Excavating Contractor, Inc. hereinafter referred to as the "Contractor" as submitted to the Board of Commissioners on August 23, 1965, which is hereby found to be the lowest and best bid for such work, and the contract awarded by the Board of Commissioners of the City of Salina, Kansas to said contractor and signed on behalf of the City by its Mayor on August 30, 1965 for the construction of certain public improvements in the City of Salina, Kansas, to -wit: Curbing, guttering, paving and grading of Diamond Drive with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the east line of U. S. 81 Highway east to the City Limits. Curbing, guttering, paving and grading of Eastborough Road with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of Crestview Drive to the north line of Seitz Drive, the same being an intervening connecting street. Curbing, guttering, paving and grading of the West side of Ohio Street with asphalt (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of Bonnie Ridge Addition to the north line of Bonnie Ridge Addition. Paving and grading of Missouri Avenue with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of Gypsum Avenue to the north line of Stack Avenue. Curbing, guttering, paving and grading of the East side of Fourth Street with concrete (Twenty (20) feet wide from back of curb to edge of pavement) from the south line of Ellsworth Avenue to the north line of Jewell Avenue. Curbing, guttering, paving and grading of the East side of Fourth Street with concrete (Twenty-two (22) feet wide from back of curb to back of curb) from the south line of Jewell Avenue to the north line of Kirwin Avenue, the same being an intervening connecting street. Curbing, guttering, paving and grading of the East side of Fourth Street with concrete (Twenty-two (22) feet wide from back of curb to back of curb) from the south line of Beloit Avenue to the north line of Minneapolis Avenue, the same being an intervening connecting street. Curbing, guttering, paving and grading of the East side of Fourth Street with concrete (Twenty-two (22) feet wide from back of curb to back of curb) from the north line of Bond Street to the south line of Crawford Avenue, the same being an intervening connecting street. Curbing, guttering, paving and grading of the West side of Fourth Street with concrete (Twenty-two (22) feet wide from back of curb to back of curb) from the south line of Bond Street to the north line of Republic Avenue, the same being an intervening connecting street. Paving and grading of Second Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the north line of Ash Street to the south line of Elm Street, the same being an intervening connecting street. Paving and grading of Tenth Street with asphalt (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of Franklin Street to the north line of Republic Avenue, the same being an intervening connecting street. CONSOLIDATED-SALINA Paving and grading of Tenth Street with asphalt (Thirty-three (33) feet wide from back of curb to back of curb) from the south line of Crawford Avenue to the north line of Frost Street, the same being an intervening connecting street. Curbing, guttering, paving and grading of Thirteenth Street with concrete (Thirty-three (33)feet wide from back of curb to back of curb) from the north line of Broadway Boulevard to the south line of Woodland Avenue. Curbing, guttering, paving and grading of Third Street with concrete (Thirty-three (33) feet wide from back of curb to back of curb) from the north line of Forrest Avenue to the south line of Woodland Avenue. at and for the unit price for said work contained in said proposal, which proposal and contract are hereby referred to and made parts of this ordinance, be and the same is hereby ratified and confirmed, said proposal being within the estimated cost of said improvements as shown by the sworn estimates of the City Engineer on file in the Office of the City Clerk which estimates are hereby referred to and made part of this ordinance. Section 2. Said improvements shall be built and constructed in accordance with the plans and specifications therefore prepared by the City Engineer on file in the Office of the City Clerk and in accordance with the proposal of said contractor and under the terms of said contract, all of which are hereby referred to and made a part of this ordinance. Section 3. That temporary notes signed by the Mayor and attested by the City Clerk be issued from time to time as the work progresses in the manner and form as required by law, the total amount thereof not to exceed the amount of $223,230.81 for such work, such notes to bear interest not to exceed 5 per cent per annum and to mature not later than December 1, 1967, and to be issued in such amounts and at such times as money for the payment of the cost of such notes being issued to said contractor and to be redeemed and cancelled at the time that permanent bonds are issued in lieu thereof. Section 4. That this ordinance shall take effect and be in full force from and after its adoption and publication once in the official city paper. (SEAL) Attest: City Clerk Introduced: August 23, 1965 Passed: August 30, 1965 Mayor