Loading...
80-8817 Levy AssessmentsORDINANCE NUMBER 80-881 (Published in The Salina Journal NILVe-Y1%✓ 1'7 , 1980) AN ORDINANCE LEVYING SPECIAL ASSESSMENTS ON LOTS, PIECES AND PARCELS OF GROUND IN THE CITY OF SALINA, KANSAS, FOR THE PURPOSE OF PAYING A PORTION OF THE COST OF: Meyer Addition Improvements Curbing, guttering, paving and grading of McADAMS ROAD from the east line of Moundview Avenue to the east line of Faith Drive. Curbing, guttering, paving and grading of MANCHESTER ROAD from the south line of McAdams Road to the north line of Martin Avenue. Curbing, guttering, paving and grading of MEYER DRIVE from the east line of Manchester Road to the north line of Martin Avenue. Curbing, guttering, paving and grading of MEADOWBROOK ROAD from the south line of McAdams Road to the north line of Meyer Drive. Water main in McADAMS ROAD from Moundview Avenue to Faith Avenue. Water main in MANCHESTER ROAD from McAdams Road to Martin Avenue. Water main in MEYER DRIVE from Manchester Road to Martin Avenue. Water main in MEADOWBROOK ROAD from McAdams Road to Meyer Drive. Water main in MARTIN AVENUE from Ohio Street to Meyer Drive. Water services to serve Lots 7 and 8, Block 3; Lots 3, 6, 7, and 8, Block 4; Replat of Faith Addition to the City of Salina, Saline County, Kansas. Water services to serve Lots l and 6 through 17, Block 3; Lots 1 through 22, Block 4; Lots 2 through 11, Block 5; and Lots 1 through 11, Block 9, Meyer Addition to the City of Salina, Saline County, Kansas. Lateral Sanitary Sewer 613. (Block 4, Meyer Addition) Platten Subdivision Improvements Curbing, guttering, paving and grading of HANSON HOLLOW from the south line of Frost Street south 300 feet. Water main and service. Lateral Sanitary Sewer 614. WHEREAS, pursuant to proceedings regularly had according to law, contracts have been let for the following improvements in the City of Salina, Saline County, Kansas: Meyer Addition Improvements Curbing, guttering, paving and grading of McADAMS ROAD from the east line of Moundview Avenue to the east line of Faith Drive. Curbing, guttering, paving and grading of MANCHESTER ROAD from the south line of McAdams Road to the north line of Martin Avenue. Curbing, guttering, paving and grading of MEYER DRIVE from the east line of Manchester Road to the north line of Martin Avenue. Curbing, guttering, paving and grading of MEADOWBROOK ROAD from the south line of McAdams Road to the north line of Meyer Drive. Water main in McADAMS ROAD from Moundview Avenue to Faith Avenue. Water main in MANCHESTER ROAD from McAdams Road to Martin Avenue. Water main in MEYER DRIVE from Manchester Road to Martin Avenue. Water main in MEADOWBROOK ROAD from McAdams Road to Meyer Drive. Water main in MARTIN AVENUE from Ohio Street to Meyer Drive. Water services to serve Lots 7 and 8, Block 3; Lots 3, 6, 7, and 8, Block 4; Replat of Faith Addition to the City of Salina, Saline County, Kansas. Water services to serve Lots 1 and 6 through 17, Block 3; Lots 1 through 22, Block 4; Lots 2 through 11, Block 5; and Lots 1 through 11, Block 9, Meyer Addition to the City of Salina, Saline County, Kansas. Lateral Sanitary Sewer 613. (Block 4, Meyer Addition) Platten Subdivision Improvements Curbing, guttering, paving and grading of HANSON HOLLOW from the south line of Frost Street south 300 feet. Water main and service. Lateral Sanitary Sewer 614. and such contracts have been duty performed, and WHEREAS, the Board of Commissioners has determined that the total cost of such improvements is Four Hundred Eighty-seven Thousand Two Hundred Seven and 04/100 Dollars ($487,207.04) and that 83.5373 percent, in the amount of Four Hundred Six Thousand Nine Hundred Ninety-nine and 39/100 Dollars ($406,999.39) be assessed against the improvement district and 16.4627 percent, in the amount of Eighty Thousand Two Hundred Seven and 65/100 Dollars ($80,207.65), is to be assessed against the City -at -large, and WHEREAS, in accordance with the provisions of Resolution Numbers 3113 and 3119, the petitioners are required to pay fifty percent (50%) of the assessment for improvement. The total assessment paid by petitioners is Eighty- three Thousand Four Two Thirty-six and 00/100 Dollars ($83,436.00) leaving a balance of Three Hundred Twenty-three Thousand Five Hundred Sixty-three and 39/100 Dollars ($323,563.39) to be levied against the lots and pieces of ground described herein, and WHEREAS, the Board of Commissioners, has, after due notice, met and determined the amount of special assessments, SO NOW, THEREFORE Kansas: BE IT ORDAINED by the Board of Commissioners of the City of Salina, Section 1. Special assessments to pay the cost of such improvements, with accrued interest, be and the same are hereby levied against the several lots, pieces and parcels of land liable for special assessments for said improvements as follows: MEYER ADDITION Block 1 Lot1 ----------------------------------------------- $1,761.16 Lot2 ------------------------------------------------ 1,044.74 Lot3 ------------------------------------------------ 819.20 Lot4 ------------------------------------------------ 816.61 Lot5 ------------------------------------------------ 816.61 Lot6 ------------------------------------------------ 816.61 Lot7 ------------------------------------------------ 816.61 Lot8 ------------------------------------------------ 855.50 Lot 9 ------------------------------------------------ 2,188.40 Lot10 ----------------------------------------------- 2,379.32 Lot11 ----------------------------------------------- 4,378.46 Lot12 ----------------------------------------------- 3,287.74 Lot13 ----------------------------------------------- 3,287.74 Lot14 ----------------------------------------------- 3,239.66 Lot15 ----------------------------------------------- 3,239.66 Lot16 ----------------------------------------------- 3,239.66 Lot 17 ----------------------------------------------- 3,868.26 All of Block 2 --------------------------------------- 3,726.71 Block 3 Lot1 ------------------------------------------------ 1,964.34 Lot2 ------------------------------------------------ 1,915.90 Lot3 ------------------------------------------------ 1,638.91 Lot4 ------------------------------------------------ 1,638.91 Lot5 ------------------------------------------------ 1,625.10 Lot6 ------------------------------------------------ 2,131.82 Lot12 ----------------------------------------------- 5,132.21 Lot13 ----------------------------------------------- 5,132.21 Lot7 ------------------------------------------------ 2,320.64 Lot8 ------------------------------------------------ 2,320.64 Lot9 ------------------------------------------------ 2,475.41 Lot 10 ----------------------------------------------- 5,476.81 Lot11 ----------------------------------------------- 5,132.21 Lot12 ----------------------------------------------- 5,132.21 Lot13 ----------------------------------------------- 5,132.21 f] 1 1 Lot14 ----------------------------------------------- 5,110.53 Lot15 ----------------------------------------------- 5,169.74 Lot16 ----------------------------------------------- 5,169.74 Lot17 ----------------------------------------------- 2,961.49 Block 4 Lot 1 ------------------------------------------------ 2,161.10 Lot2 ------------------------------------------------ 6,407.03 Lot3 ------------------------------------------------ 2,725.86 Lot4 ------------------------------------------------ 5,451.74 Lot5 ------------------------------------------------ 5,451.75 Lot6 ------------------------------------------------ 5,451.75 Lot7 ------------------------------------------------ 5,618.18 Lot8 ------------------------------------------------ 5,618.18 Lot9 ------------------------------------------------ 5,618.18 Lot 10 ----------------------------------------------- 5,618.18 Lot 11 ----------------------------------------------- 6,604.38 Lot12 ----------------------------------------------- 2,244.32 Lot13 ----------------------------------------------- 3,919.51 Lot14 ---------------------------------------------- 3,083.19 Lot15 ----------------------------------------------- 3,083.20 Lot16 ----------------------------------------------- 3,083.20 Lot 17 ----------------------------------------------- 3,o83.20 Lot18 ----------------------------------------------- 2,916.76 Lot19 ----------------------------------------------- 2,916.76 Lot20 ----------------------------------------------- 2,916.76 Lot21 ----------------------------------------------- 2,916.76 Lot22 ----------------------------------------------- 3,724.54 Block 5 Lot1 ------------------------------------------------ 907.35 Lot2 ------------------------------------------------ 531.44 Lot3 ------------------------------------------------ 852.94 Lot4 ------------------------------------------------ 852.94 Lot5 ------------------------------------------------ 852.94 Lot6 ------------------------------------------------ 852.94 Lot7 ------------------------------------------------ 852.94 Lot8 ------------------------------------------------ 852.94 Lot9 ------------------------------------------------ 852.94 Lot10 ----------------------------------------------- 852.94 Lot11 ----------------------------------------------- 531.44 Lot12 ----------------------------------------------- 907.35 Lot13 ----------------------------------------------- 537.92 Lot14 ----------------------------------------------- 453.67 Lot15 ----------------------------------------------- 453.67 Lot16 ----------------------------------------------- 453.67 Lot17 ----------------------------------------------- 453.67 Lot18 ----------------------------------------------- 453.67 Lot19 ----------------------------------------------- 453.67 Lot20 ----------------------------------------------- 453.67 Lot21 ----------------------------------------------- 453.67 Lot22 ----------------------------------------------- 537.92 Block 6 Lot1 ------------------------------------------------ 453.67 Lot2 ------------------------------------------------ 453.67 Lot3 ------------------------------------------------ 453.67 Lot4 ------------------------------------------------ 453.67 Lot5 ------------------------------------------------ 453.67 Lot6 ------------------------------------------------ 453.67 Lot7 ------------------------------------------------ 453.67 Lot8 ------------------------------------------------ 453.67 Lot9 ------------------------------------------------ 453.67 Lot10 ----------------------------------------------- 453.67 Lot11 ----------------------------------------------- 453.67 Lot12 Lot13 ----------------------------------------------- ----------------------------------------------- 453.67 517.8, Lot14 ----------------------------------------------- 443.95 Lot15 ----------------------------------------------- 523.67 Lot16 ----------------------------------------------- 465.34 Lot17 ----------------------------------------------- 453.67 I[] Block 8 Lot1 ------------------------------------------------ 550.89 Lot2 ------------------------------------------------ 453.67 Lot3 ------------------------------------------------ 453.67 Lot4 ------------------------------------------------ 484.78 Block 9 Lot1 ------------------------------------------------ Lot18 ----------------------------------------------- 453.67 Lot2 ------------------------------------------------ Lot19 ----------------------------------------------- 453.67 ------------------------------------------------ 622.82 Lot20 ----------------------------------------------- 453.67 Lot2 ------------------------------------------------ Lot21 ----------------------------------------------- 453.67 Lot5 Lot3 Lot22 ----------------------------------------------- 453.67 436.82 ------------------------------------------------ Lot23 ----------------------------------------------- 453.67 ------------------------------------------------ 466.63 Lot24 ----------------------------------------------- 453.67 Lot 5 ------------------------------------------------ Lot25 ----------------------------------------------- 499.69 Lot6 Lot26 ----------------------------------------------- 583.29 466.63 Lot27 ----------------------------------------------- 580.70 ------------------------------------------------ 466.63 Lot28 ----------------------------------------------- 450.43 Lot8 ------------------------------------------------ Lot 29 ----------------------------------------------- 486.07 Lot30 ----------------------------------------------- 434.23 I[] Block 8 Lot1 ------------------------------------------------ 550.89 Lot2 ------------------------------------------------ 453.67 Lot3 ------------------------------------------------ 453.67 Lot4 ------------------------------------------------ 484.78 Block 9 Lot1 ------------------------------------------------ Block 7 Lot2 ------------------------------------------------ Lot1 ------------------------------------------------ 622.82 4,599.09 Lot2 ------------------------------------------------ 474.41 Lot5 Lot3 ------------------------------------------------ 436.82 ------------------------------------------------ Lot4 ------------------------------------------------ 466.63 Lot 5 ------------------------------------------------ 466.63 Lot6 ------------------------------------------------ 466.63 Lot7 ------------------------------------------------ 466.63 Lot8 ------------------------------------------------ 550.89 I[] Block 8 Lot1 ------------------------------------------------ 550.89 Lot2 ------------------------------------------------ 453.67 Lot3 ------------------------------------------------ 453.67 Lot4 ------------------------------------------------ 484.78 Block 9 Lot1 ------------------------------------------------ 4,333.16 Lot2 ------------------------------------------------ 3,603.11 Lot3 ------------------------------------------------ 4,599.09 Lot4 ------------------------------------------------ 5,193.27 Lot5 ------------------------------------------------ 5,347.98 Lot6 ------------------------------------------------ 5,620.43 1 II Block 3 South 61 feet of Lot 1 ------------------------------- Lot7 ------------------------------------------------ 6,717.01 Lot3 ------------------------------------------------ Lot8 ------------------------------------------------ 6,758.72 Lot5 ------------------------------------------------ Lot 9 ------------------------------------------------ 4,648.66 Lot 7 ------------------------------------------------ Lot10 ----------------------------------------------- 4,477.26 Lot9 ------------------------------------------------ Lot11 ----------------------------------------------- 4,975.13 Lot11 ----------------------------------------------- 566.03 TOTAL MEYER ADDITION $279,146.98 South 61 feet of Lot 13 ------------------------------ 431.60 REPLAT OF FAITH ADDITION 1 II Block 3 South 61 feet of Lot 1 ------------------------------- 431.60 Lot2 ------------------------------------------------ 566.03 Lot3 ------------------------------------------------ 566.03 Lot4 ------------------------------------------------ 566.03 Lot5 ------------------------------------------------ 566.03 Lot6 ------------------------------------------------ 636.78 Lot 7 ------------------------------------------------ 2,100.62 Lot8 ------------------------------------------------ 636.78 Lot9 ------------------------------------------------ 566.03 Lot10 ----------------------------------------------- 566.03 Lot11 ----------------------------------------------- 566.03 Lot12 ----------------------------------------------- 566.03 South 61 feet of Lot 13 ------------------------------ 431.60 Block 4 South 61 feet of Lot 1 ------------------------------- 431.60 Lot2 ------------------------------------------------ 566.03 Lot3 ------------------------------------------------ 566.03 Lot4 ------------------------------------------------ 566.03 Lot5 ------------------------------------------------ 566.03 Lot6 ------------------------------------------------ 636.78 Lot7 ------------------------------------------------ 2,100.61 Lot8 ------------------------------------------------ 1,663.47 Lot9 ------------------------------------------------ 566.03 Lot10 ----------------------------------------------- 566.03 Lot11 ----------------------------------------------- 566.03 Lot 12 ----------------------------------------------- 566.03 South 61 feet of Lot 13 ------------------------------ 431.60 TOTAL REPLAT OF FAITH ADDITION! $18,557.92 PLATTEN SUBDIVISION Lot1 ------------------------------------------------ 4,375.13 Lot2 ------------------------------------------------ 4,375.13 Lot3 ------------------------------------------------ 4,375.13 Lot 4 ------------------------------------------------ 4,344.94 Lot5 ------------------------------------------------ 4,194.o8 Lot6 ------------------------------------------------ 4,194.08 TOTAL PLATTEN SUBDIVISION $25,858.49 GRAND TOTAL $323,563.39 Section 2. Said amounts so levied, apportioned and assessed as aforesaid will be due and collectible in ten equal installments, the first becoming due with the taxes levied for the year 1981, and one of said installment falling due each and every year thereafter until all are paid and all to be collected with interest as in this ordinance provided, HOWEVER, that the owner of any piece or parcel of property liable for any such assessments may redeem his property from such liability by paying to the City Treasurer the entire amount chargeable against the same, as in this ordinance provided, at any time within thirty days after the publication of this ordinance and before the issuance of bonds of said City in payment of the balance of the cost of said improvements, the property so paid on shall not thereafter be liable for any further assessments for the cost of said improvements, nor for any part of said bonds. Section 3. There is hereby levied further and assessed against such lots and pieces of ground described in this ordinance, interest at such rate per annum as shall be borne by bonds hereafter to be issued for the payment of the remaining unpaid cost of such improvements to be hereafter determined and fixed by ordinance, when such bonds are issued on all of said installments mentioned and provided for in this ordinance, from the date of the bonds which may be issued at the end of thirty days as specified in the preceding section hereof, as by law provided, to the time of collection of the installments as provided by law, which said interest shall be collected and after the taking effect of this ordinance and the fixing of said interest rate when such bonds are authorized and issued, however such interest rate shall not exceed 10 percent per annum, it shall be the duty of the City Clerk of said City to annually, at the same time other taxes are certified, and until all of said assessments so apportioned and levied have been certified to the County Clerk of Saline County, Kansas, certify a full list of all property liable to assessments and taxation for such work and have been paid in full, as hereinbefore provided, together with the respective amounts due on each of said lots and pieces of ground, which amounts shall include the annual installments of special assessments together with the interest for one year at the rate to be fixed as provided for in this ordinance, on all unpaid balances of such assessments, such amounts so certified as herein provided shall be placed upon the tax roll by the County Clerk of Saline County, Kansas, and collected as other taxes are collected. (SEAL) ATTEST: 1 AM D. L. Harrison, City Clerk Introduced: November 3, 1980 Passed: November 10, 1980 Dan S. Geis, Mayor Section 4. This ordinance shall be in full force and effect from and after its adoption and publication once in the official city newspaper. (SEAL) ATTEST: 1 AM D. L. Harrison, City Clerk Introduced: November 3, 1980 Passed: November 10, 1980 Dan S. Geis, Mayor