80-8817 Levy AssessmentsORDINANCE NUMBER 80-881
(Published in The Salina Journal NILVe-Y1%✓ 1'7 , 1980)
AN ORDINANCE LEVYING SPECIAL ASSESSMENTS ON LOTS, PIECES AND PARCELS
OF GROUND IN THE CITY OF SALINA, KANSAS, FOR THE PURPOSE OF PAYING A PORTION OF
THE COST OF:
Meyer Addition Improvements
Curbing, guttering, paving and grading of McADAMS ROAD from the east
line of Moundview Avenue to the east line of Faith Drive.
Curbing, guttering, paving and grading of MANCHESTER ROAD from the
south line of McAdams Road to the north line of Martin Avenue.
Curbing, guttering, paving and grading of MEYER DRIVE from the east
line of Manchester Road to the north line of Martin Avenue.
Curbing, guttering, paving and grading of MEADOWBROOK ROAD from the
south line of McAdams Road to the north line of Meyer Drive.
Water main in McADAMS ROAD from Moundview Avenue to Faith Avenue.
Water main in MANCHESTER ROAD from McAdams Road to Martin Avenue.
Water main in MEYER DRIVE from Manchester Road to Martin Avenue.
Water main in MEADOWBROOK ROAD from McAdams Road to Meyer Drive.
Water main in MARTIN AVENUE from Ohio Street to Meyer Drive.
Water services to serve Lots 7 and 8, Block 3; Lots 3, 6, 7, and 8,
Block 4; Replat of Faith Addition to the City of Salina, Saline
County, Kansas.
Water services to serve Lots l and 6 through 17, Block 3; Lots 1
through 22, Block 4; Lots 2 through 11, Block 5; and Lots 1
through 11, Block 9, Meyer Addition to the City of Salina, Saline
County, Kansas.
Lateral Sanitary Sewer 613. (Block 4, Meyer Addition)
Platten Subdivision Improvements
Curbing, guttering, paving and grading of HANSON HOLLOW from the south
line of Frost Street south 300 feet.
Water main and service.
Lateral Sanitary Sewer 614.
WHEREAS, pursuant to proceedings regularly had according to law,
contracts have been let for the following improvements in the City of Salina,
Saline County, Kansas:
Meyer Addition Improvements
Curbing, guttering, paving and grading of McADAMS ROAD from the east
line of Moundview Avenue to the east line of Faith Drive.
Curbing, guttering, paving and grading of MANCHESTER ROAD from the
south line of McAdams Road to the north line of Martin Avenue.
Curbing, guttering, paving and grading of MEYER DRIVE from the east
line of Manchester Road to the north line of Martin Avenue.
Curbing, guttering, paving and grading of MEADOWBROOK ROAD from the
south line of McAdams Road to the north line of Meyer Drive.
Water main in McADAMS ROAD from Moundview Avenue to Faith Avenue.
Water main in MANCHESTER ROAD from McAdams Road to Martin Avenue.
Water main in MEYER DRIVE from Manchester Road to Martin Avenue.
Water main in MEADOWBROOK ROAD from McAdams Road to Meyer Drive.
Water main in MARTIN AVENUE from Ohio Street to Meyer Drive.
Water services to serve Lots 7 and 8, Block 3; Lots 3, 6, 7, and 8,
Block 4; Replat of Faith Addition to the City of Salina, Saline
County, Kansas.
Water services to serve Lots 1 and 6 through 17, Block 3; Lots 1
through 22, Block 4; Lots 2 through 11, Block 5; and Lots 1 through
11, Block 9, Meyer Addition to the City of Salina, Saline County,
Kansas.
Lateral Sanitary Sewer 613. (Block 4, Meyer Addition)
Platten Subdivision Improvements
Curbing, guttering, paving and grading of HANSON HOLLOW from the south
line of Frost Street south 300 feet.
Water main and service.
Lateral Sanitary Sewer 614.
and such contracts have been duty performed, and
WHEREAS, the Board of Commissioners has determined that the total cost
of such improvements is Four Hundred Eighty-seven Thousand Two Hundred Seven and
04/100 Dollars ($487,207.04) and that 83.5373 percent, in the amount of Four
Hundred Six Thousand Nine Hundred Ninety-nine and 39/100 Dollars ($406,999.39)
be assessed against the improvement district and 16.4627 percent, in the amount
of Eighty Thousand Two Hundred Seven and 65/100 Dollars ($80,207.65), is to be
assessed against the City -at -large, and
WHEREAS, in accordance with the provisions of Resolution Numbers 3113
and 3119, the petitioners are required to pay fifty percent (50%) of the
assessment for improvement. The total assessment paid by petitioners is Eighty-
three Thousand Four Two Thirty-six and 00/100 Dollars ($83,436.00) leaving a
balance of Three Hundred Twenty-three Thousand Five Hundred Sixty-three and
39/100 Dollars ($323,563.39) to be levied against the lots and pieces of ground
described herein, and
WHEREAS, the Board of Commissioners, has, after due notice, met and
determined the amount of special assessments, SO NOW, THEREFORE
Kansas:
BE IT ORDAINED by the Board of Commissioners of the City of Salina,
Section 1. Special assessments to pay the cost of such improvements,
with accrued interest, be and the same are hereby levied against the several
lots, pieces and parcels of land liable for special assessments for said
improvements as follows:
MEYER ADDITION
Block 1
Lot1 ----------------------------------------------- $1,761.16
Lot2 ------------------------------------------------ 1,044.74
Lot3 ------------------------------------------------ 819.20
Lot4 ------------------------------------------------ 816.61
Lot5 ------------------------------------------------ 816.61
Lot6 ------------------------------------------------ 816.61
Lot7 ------------------------------------------------ 816.61
Lot8 ------------------------------------------------ 855.50
Lot 9 ------------------------------------------------ 2,188.40
Lot10 ----------------------------------------------- 2,379.32
Lot11 ----------------------------------------------- 4,378.46
Lot12 ----------------------------------------------- 3,287.74
Lot13 ----------------------------------------------- 3,287.74
Lot14 ----------------------------------------------- 3,239.66
Lot15 ----------------------------------------------- 3,239.66
Lot16 ----------------------------------------------- 3,239.66
Lot 17 ----------------------------------------------- 3,868.26
All of Block 2 --------------------------------------- 3,726.71
Block 3
Lot1
------------------------------------------------ 1,964.34
Lot2
------------------------------------------------ 1,915.90
Lot3
------------------------------------------------ 1,638.91
Lot4
------------------------------------------------ 1,638.91
Lot5
------------------------------------------------ 1,625.10
Lot6
------------------------------------------------ 2,131.82
Lot12 ----------------------------------------------- 5,132.21
Lot13 ----------------------------------------------- 5,132.21
Lot7 ------------------------------------------------
2,320.64
Lot8 ------------------------------------------------
2,320.64
Lot9 ------------------------------------------------
2,475.41
Lot 10 -----------------------------------------------
5,476.81
Lot11 -----------------------------------------------
5,132.21
Lot12 ----------------------------------------------- 5,132.21
Lot13 ----------------------------------------------- 5,132.21
f]
1
1
Lot14
-----------------------------------------------
5,110.53
Lot15
-----------------------------------------------
5,169.74
Lot16
-----------------------------------------------
5,169.74
Lot17
-----------------------------------------------
2,961.49
Block 4
Lot 1 ------------------------------------------------ 2,161.10
Lot2 ------------------------------------------------ 6,407.03
Lot3 ------------------------------------------------ 2,725.86
Lot4 ------------------------------------------------ 5,451.74
Lot5
------------------------------------------------
5,451.75
Lot6
------------------------------------------------
5,451.75
Lot7
------------------------------------------------
5,618.18
Lot8
------------------------------------------------
5,618.18
Lot9
------------------------------------------------
5,618.18
Lot
10 -----------------------------------------------
5,618.18
Lot
11 -----------------------------------------------
6,604.38
Lot12
-----------------------------------------------
2,244.32
Lot13
-----------------------------------------------
3,919.51
Lot14
----------------------------------------------
3,083.19
Lot15
-----------------------------------------------
3,083.20
Lot16
-----------------------------------------------
3,083.20
Lot
17 -----------------------------------------------
3,o83.20
Lot18
-----------------------------------------------
2,916.76
Lot19
-----------------------------------------------
2,916.76
Lot20
-----------------------------------------------
2,916.76
Lot21
-----------------------------------------------
2,916.76
Lot22
-----------------------------------------------
3,724.54
Block 5
Lot1
------------------------------------------------
907.35
Lot2
------------------------------------------------
531.44
Lot3
------------------------------------------------
852.94
Lot4
------------------------------------------------
852.94
Lot5
------------------------------------------------
852.94
Lot6
------------------------------------------------
852.94
Lot7
------------------------------------------------
852.94
Lot8
------------------------------------------------
852.94
Lot9
------------------------------------------------
852.94
Lot10
-----------------------------------------------
852.94
Lot11
-----------------------------------------------
531.44
Lot12
-----------------------------------------------
907.35
Lot13
-----------------------------------------------
537.92
Lot14
-----------------------------------------------
453.67
Lot15
-----------------------------------------------
453.67
Lot16
-----------------------------------------------
453.67
Lot17
-----------------------------------------------
453.67
Lot18
-----------------------------------------------
453.67
Lot19
-----------------------------------------------
453.67
Lot20
-----------------------------------------------
453.67
Lot21
-----------------------------------------------
453.67
Lot22
-----------------------------------------------
537.92
Block 6
Lot1
------------------------------------------------
453.67
Lot2
------------------------------------------------
453.67
Lot3
------------------------------------------------
453.67
Lot4
------------------------------------------------
453.67
Lot5
------------------------------------------------
453.67
Lot6
------------------------------------------------
453.67
Lot7
------------------------------------------------
453.67
Lot8
------------------------------------------------
453.67
Lot9
------------------------------------------------
453.67
Lot10
-----------------------------------------------
453.67
Lot11
-----------------------------------------------
453.67
Lot12
Lot13
-----------------------------------------------
-----------------------------------------------
453.67
517.8,
Lot14
-----------------------------------------------
443.95
Lot15
-----------------------------------------------
523.67
Lot16
-----------------------------------------------
465.34
Lot17
-----------------------------------------------
453.67
I[]
Block 8
Lot1 ------------------------------------------------ 550.89
Lot2 ------------------------------------------------ 453.67
Lot3 ------------------------------------------------ 453.67
Lot4 ------------------------------------------------ 484.78
Block 9
Lot1
------------------------------------------------
Lot18 ----------------------------------------------- 453.67
Lot2
------------------------------------------------
Lot19 ----------------------------------------------- 453.67
------------------------------------------------
622.82
Lot20 ----------------------------------------------- 453.67
Lot2
------------------------------------------------
Lot21 ----------------------------------------------- 453.67
Lot5
Lot3
Lot22 ----------------------------------------------- 453.67
436.82
------------------------------------------------
Lot23 ----------------------------------------------- 453.67
------------------------------------------------
466.63
Lot24 ----------------------------------------------- 453.67
Lot
5 ------------------------------------------------
Lot25 ----------------------------------------------- 499.69
Lot6
Lot26 ----------------------------------------------- 583.29
466.63
Lot27 ----------------------------------------------- 580.70
------------------------------------------------
466.63
Lot28 ----------------------------------------------- 450.43
Lot8
------------------------------------------------
Lot 29 ----------------------------------------------- 486.07
Lot30 ----------------------------------------------- 434.23
I[]
Block 8
Lot1 ------------------------------------------------ 550.89
Lot2 ------------------------------------------------ 453.67
Lot3 ------------------------------------------------ 453.67
Lot4 ------------------------------------------------ 484.78
Block 9
Lot1
------------------------------------------------
Block 7
Lot2
------------------------------------------------
Lot1
------------------------------------------------
622.82
4,599.09
Lot2
------------------------------------------------
474.41
Lot5
Lot3
------------------------------------------------
436.82
------------------------------------------------
Lot4
------------------------------------------------
466.63
Lot
5 ------------------------------------------------
466.63
Lot6
------------------------------------------------
466.63
Lot7
------------------------------------------------
466.63
Lot8
------------------------------------------------
550.89
I[]
Block 8
Lot1 ------------------------------------------------ 550.89
Lot2 ------------------------------------------------ 453.67
Lot3 ------------------------------------------------ 453.67
Lot4 ------------------------------------------------ 484.78
Block 9
Lot1
------------------------------------------------
4,333.16
Lot2
------------------------------------------------
3,603.11
Lot3
------------------------------------------------
4,599.09
Lot4
------------------------------------------------
5,193.27
Lot5
------------------------------------------------
5,347.98
Lot6
------------------------------------------------
5,620.43
1
II
Block 3
South 61 feet of Lot 1 -------------------------------
Lot7
------------------------------------------------
6,717.01
Lot3 ------------------------------------------------
Lot8
------------------------------------------------
6,758.72
Lot5 ------------------------------------------------
Lot
9 ------------------------------------------------
4,648.66
Lot 7 ------------------------------------------------
Lot10
-----------------------------------------------
4,477.26
Lot9 ------------------------------------------------
Lot11
-----------------------------------------------
4,975.13
Lot11 -----------------------------------------------
566.03
TOTAL MEYER ADDITION
$279,146.98
South 61 feet of Lot 13 ------------------------------
431.60
REPLAT OF FAITH ADDITION
1
II
Block 3
South 61 feet of Lot 1 -------------------------------
431.60
Lot2 ------------------------------------------------
566.03
Lot3 ------------------------------------------------
566.03
Lot4 ------------------------------------------------
566.03
Lot5 ------------------------------------------------
566.03
Lot6 ------------------------------------------------
636.78
Lot 7 ------------------------------------------------
2,100.62
Lot8 ------------------------------------------------
636.78
Lot9 ------------------------------------------------
566.03
Lot10 -----------------------------------------------
566.03
Lot11 -----------------------------------------------
566.03
Lot12 -----------------------------------------------
566.03
South 61 feet of Lot 13 ------------------------------
431.60
Block 4
South 61 feet of Lot 1 -------------------------------
431.60
Lot2 ------------------------------------------------
566.03
Lot3 ------------------------------------------------
566.03
Lot4 ------------------------------------------------
566.03
Lot5 ------------------------------------------------
566.03
Lot6 ------------------------------------------------
636.78
Lot7 ------------------------------------------------
2,100.61
Lot8 ------------------------------------------------
1,663.47
Lot9 ------------------------------------------------
566.03
Lot10 -----------------------------------------------
566.03
Lot11 ----------------------------------------------- 566.03
Lot 12 ----------------------------------------------- 566.03
South 61 feet of Lot 13 ------------------------------ 431.60
TOTAL REPLAT OF FAITH ADDITION! $18,557.92
PLATTEN SUBDIVISION
Lot1 ------------------------------------------------ 4,375.13
Lot2 ------------------------------------------------ 4,375.13
Lot3 ------------------------------------------------ 4,375.13
Lot 4 ------------------------------------------------ 4,344.94
Lot5 ------------------------------------------------ 4,194.o8
Lot6 ------------------------------------------------ 4,194.08
TOTAL PLATTEN SUBDIVISION
$25,858.49
GRAND TOTAL $323,563.39
Section 2. Said amounts so levied, apportioned and assessed as
aforesaid will be due and collectible in ten equal installments, the first
becoming due with the taxes levied for the year 1981, and one of said installment
falling due each and every year thereafter until all are paid and all to be
collected with interest as in this ordinance provided, HOWEVER, that the owner
of any piece or parcel of property liable for any such assessments may redeem
his property from such liability by paying to the City Treasurer the entire
amount chargeable against the same, as in this ordinance provided, at any time
within thirty days after the publication of this ordinance and before the
issuance of bonds of said City in payment of the balance of the cost of said
improvements, the property so paid on shall not thereafter be liable for any
further assessments for the cost of said improvements, nor for any part of said
bonds.
Section 3. There is hereby levied further and assessed against such
lots and pieces of ground described in this ordinance, interest at such rate per
annum as shall be borne by bonds hereafter to be issued for the payment of the
remaining unpaid cost of such improvements to be hereafter determined and fixed
by ordinance, when such bonds are issued on all of said installments mentioned
and provided for in this ordinance, from the date of the bonds which may be
issued at the end of thirty days as specified in the preceding section hereof,
as by law provided, to the time of collection of the installments as provided by
law, which said interest shall be collected and after the taking effect of this
ordinance and the fixing of said interest rate when such bonds are authorized
and issued, however such interest rate shall not exceed 10 percent per annum, it
shall be the duty of the City Clerk of said City to annually, at the same time
other taxes are certified, and until all of said assessments so apportioned and
levied have been certified to the County Clerk of Saline County, Kansas, certify
a full list of all property liable to assessments and taxation for such work and
have been paid in full, as hereinbefore provided, together with the respective
amounts due on each of said lots and pieces of ground, which amounts shall
include the annual installments of special assessments together with the interest
for one year at the rate to be fixed as provided for in this ordinance, on all
unpaid balances of such assessments, such amounts so certified as herein provided
shall be placed upon the tax roll by the County Clerk of Saline County, Kansas,
and collected as other taxes are collected.
(SEAL)
ATTEST:
1
AM
D. L. Harrison, City Clerk
Introduced: November 3, 1980
Passed: November 10, 1980
Dan S. Geis, Mayor
Section
4.
This ordinance shall
be
in full force
and effect from and
after its adoption
and
publication once in
the
official city
newspaper.
(SEAL)
ATTEST:
1
AM
D. L. Harrison, City Clerk
Introduced: November 3, 1980
Passed: November 10, 1980
Dan S. Geis, Mayor