83-8955 Levy AssessmentsORDINANCE NUMBER 83-8955
(Published in The Salina Journal F-00 13 1983) I
AN ORDINANCE LEVYING SPECIAL ASSESSMENTS ON LOTS, PIECES AND PARCELS
OF GROUND IN THE CITY OF SALINA, KANSAS FOR THE PURPOSE OF PAYING A PORTION OF
THE COST OF:
Country Hills Addition Number 2
Paving, grading, and drainage pipe in FAIRDALE COURT from Fairdale
Court to Etherington Court.
Paving, grading, and drainage pipe in ETHERINGTON COURT from Fairdale
Road to cul-de-sac.
Water main to serve Lots Seventeen (17) through Twenty-four (24),
Block Two (2), and Lots Twenty-one (21) through Twenty-five (25),
Block Three (3), Country Hills Addition Number Two.
Lateral Sanitary Sewer 611.
Lateral Sanitary Sewer 612.
Replat of Blocks 3, 4, 5, 6, and 8, Lakewood Addition
Curbing, guttering, paving and grading of CIRCLE DRIVE from Ohio
Street to Elm Street and the Circle Drive and Elm Street intersection
and the storm sewer system to serve the above described street
improvement.
Lateral Sanitary Sewer 613.
Lateral Sanitary Sewer 614.
Water system to serve Lots Two (2) through Five (5), Block One (1);
and Lots One (1) through Four (4), and part of Lot Twenty-two (22),
Block Two (2), Replat of Blocks 3, 4, 5, 6, and 8, Lakewood Addition
to the City of Salina, Saline County, Kansas.
Twin Oaks II Subdivision
Curbing, guttering, paving and grading of BURR OAK LANE from Ohio
Street to a point 230.8 feet west of the west line of Redbud Lane.
A drainage ditch over and upon the following described parcel of land
in the South Half of the Northwest Quarter of Section Thirty-one (31),
Township Fourteen (14) South, Range Two (2) West of the Sixth
Principal Meridian beginning at a point on the east right-of-way line
of Ohio Street, and ninety-three feet (93') south of the northwest
corner of the south half of the Northwest Quarter of the above
mentioned section, thence running east a distance of two thousand nine
hundred eighty-two feet (2,982') and parallel to the north line of the
south half of the above mentioned Northwest Quarter Section to the
Smoky Hill River Channel.
A drainage ditch beginning at a point ninety-three feet (93') south
and sixty-five feet (65') west of the northwest corner of the South
Half of the Northwest Quarter of Section Thirty-one (31), Township
Fourteen (14) South, Range Two (2) West of the Sixth Principal
Meridian, thence running south along a line and sixty-five feet (65')
west of the center line of Ohio Street to the south line of the
Northwest Quarter of said Section where the ditch intercepts the
existing west ditch of Ohio Street. There shall be a sixty (60) RCP
with end sections installed where the drainage system crosses Ohio
Street and where it crosses Burr Oak Lane. There shall be a storm
sewer pipe installed in Burr Oak Lane from Ohio Street to the west
line of Lot 9, Block 7, Twin Oaks II Subdivision.
Lateral Sanitary Sewer 615.
Six inch water main beginning by connecting to an existing six inch
water main in the intersection of Burr Oak Lane and Ohio Street,
thence running west in Burr Oak Lane to the intersection of Burr Oak
Lane and Redbud Lane.
WHEREAS, pursuant to proceedings regularly had according to law,
contracts have been let for the following improvements in the City of Salina,
Saline County, Kansas
Country Hills Addition Number 2
Paving, grading, and drainage pipe in FAIRDALE COURT from Fairdale
Court to Etherington Court.
Paving, grading, and drainage pipe in ETHERINGTON COURT from Fairdale
Road to cul-de-sac.
Water main to serve Lots Seventeen (17) through Twenty-four (24),
Block Two (2), and Lots Twenty-one (21) through Twenty-five (25),
Block Three (3), Country Hills Addition Number Two.
Lateral Sanitary Sewer 611.
Lateral Sanitary Sewer 612.
Replat of Blocks 3, 4, 5, 6, and 8, Lakewood Addition
Curbing, guttering, paving and grading of CIRCLE DRIVE from Ohio
Street to Elm Street and the Circle Drive and Elm Street intersection
and the storm sewer system to serve the above described street
improvement.
Lateral Sanitary Sewer 613.
Lateral Sanitary Sewer 614.
Water system to serve Lots Two (2) through Five (5), Block One (1);
and Lots One (1) through Four (4), and part of Lot Twenty-two (22),
Block Two (2), Replat of Blocks 3, 4, 5, 6, and 8, Lakewood Addition
to the City of Salina, Saline County, Kansas.
Twin Oaks II Subdivision
Curbing, guttering, paving and grading of BURR OAK LANE from Ohio
Street to a point 230.8 feet west of the west line of Redbud Lane.
A drainage ditch over and upon the following described parcel of land
in the South Half of the Northwest Quarter of Section Thirty-one (31),
Township Fourteen (14) South, Range Two (2) West of the Sixth
Principal Meridian beginning at a point on the east right-of-way line
of Ohio Street, and ninety-three feet (93') south of the northwest
corner of the south half of the Northwest Quarter of the above
mentioned section, thence running east a distance of two thousand nine
hundred eighty-two feet (2,982') and parallel to the north line of the
south half of the above mentioned Northwest Quarter Section to the
Smoky Hill River Channel.
A drainage ditch beginning at a point ninety-three feet (93') south
and sixty-five feet (65') west of the northwest corner of the South
Half of the Northwest Quarter of Section Thirty-one (31), Township
Fourteen (14) South, Range Two (2) West of the Sixth Principal
Meridian, thence running south along a line and sixty-five feet (65')
west of the center line of Ohio Street to the south line of the
Northwest Quarter of said Section where the ditch intercepts the
existing west ditch of Ohio Street. There shall be a sixty (60) RCP
with end sections installed where the drainage system crosses Ohio
Street and where it crosses Burr Oak Lane. There shall be a storm
sewer pipe installed in Burr Oak Lane from Ohio Street to the west
line of Lot 9, Block 7, Twin Oaks II Subdivision.
Lateral Sanitary Sewer 615.
Six inch water main beginning by connecting to an existing six inch
water main in the intersection of Burr Oak Lane and Ohio Street,
thence running west in Burr Oak Lane to the intersection of Burr Oak
Lane and Redbud Lane.
and such contracts have been duly performed, and
WHEREAS, the Board of Commissioners has determined that the total cost
of such improvements is Four Hundred Seventy-nine Thousand Nine Hundred
Ninety-seven and 68/100 dollars ($479,997.68) and that 96.77 percent in the
amount of Four Hundred Sixty-four Thousand Four Hundred Ninety-two and 46/100
dollars ($464,492.46) be assessed against the improvement district and 3.23
percent in the amount of Fifteen Thousand Five Hundred Five and 22/100 dollars
be assesed against the city -at -large.
WHEREAS, the Board of Commissioners has, after due notice, met and
determined the amount of special assessments, SO NOW, THEREFORE
BE IT ORDAINED by the Governing Body of the City of Salina, Kansas:
Section 1. Special assessments to pay the cost of such improvements
with accrued interest, be and the same are hereby levied against the several
lots, pieces and parcels of land liable for special assessments for said
improvements as follows:
COUNTRY HILLS ADDITION NUMBER 2
Block 2
East 29' Lot 16 .................................... 1,141.49
Lot17 ............................................. 4,219.58
Lot18 ............................................. 4,386.14
Lot19 ............................................. 6,561.51
Lot 20 ............................................. 7,374.17
Lot 21 ............................................. 8,797.52
Lot 22 ............................................. 6,992.81
Lot23 ............................................. 5,066.52
Lot 24 ............................................. 5,199.43
Block 3
East 72.4' Lot 18 .................................. 828.29
Lot19 ............................................. 1,144.05
Lot 20 ............................................. 1,468.97
Lot 21 ............................................. 7,930.37
Lot22 ............................................. 5,831.15
Lot23 ............................................. 5,831.15
Lot24 ............................................. 5,831.15
Lot25 ............................................. 4,277.26
1
11
1
REPLAT OF BLOCKS 3, 4, 5, 6, and 8 LAKEWOOD ADDITION
Block 1
East 16' Lot 1 ..................................... 1,116.94
West 120.0' Lot 1 .................................. 8,384.09
Lot 2 .............................................. 9,189.29
Lot3 .............................................. 9,189.29
Lot 4 .............................................. 10,292.01
Lot 5 .............................................. 9,199.26
Lot 6 .............................................. 4,325.42
Lot7 .............................................. 7,915.53
Block 2
Lot1 .............................................. 9,630.07
Lot 2 .............................................. 8,353.90
Lot3 .............................................. 8,353.90
Lot 4 .............................................. 8,155.60
North half Lot 22 .................................. 8,051.75
LAKEWOOD ADDITION
Block 7 ............................................ 24,385.97
TWIN OAKS II SUBDIVISION
Block 1
Lot 1 .............................................. 1,194.69
Lot2 .............................................. 1,194.69
Lot 3 .............................................. 1,194.69
Lot 4 .............................................. 1,194.69
Lot5 .............................................. 1,194.69
Block 2
Lot 1 .............................................. 1,194.69
Lot2 .............................................. 1,194.69
Lot3 .............................................. 1,057.97
Lot4 .............................................. 1,061.95
Lot5 .............................................. 1,320.79
Lot6 .............................................. 1,563.72
Lot 7 .............................................. 1,419.03
Lot8 .............................................. 961.06
Lot9 .............................................. 995.57
Lot 10 ............................................. 1,061.95
Lot11 ............................................. 995.57
1
1
1
Lot 12 ............................................. 1,061.95
Lot13 ............................................. 995.57
Lot14 ............................................. 1,061.95
Lot15 ............................................. 995.57
Lot 16 ............................................. 1,061.95
Lot17 ............................................. 995.57
Lot18 ............................................. 1,261.06
Lot 19 ............................................ 1,261.06
Lot20 ............................................ 995.57
Lot21 ............................................ 1,061.95
Lot22 ............................................ 995.57
Lot 23 ............................................ 1,061.95
Lot24 ............................................ 995.57
Lot 25 ............................................ 1,061.95
Lot26 ............................................ 995.57
Lot 27 ............................................ 1,061.95
Lot28 ............................................ 995.57
Lot 29 ............................................ 1,048.68
Lot 30 ............................................ 962.39
Lot31 ............................................ 962.39
Lot32 ............................................ 1,063.28
Lot 33 ............................................ 1,393.86
Block 3
Lot1
.............................................
1,198.67
Lot
2
.............................................
1,124.33
Lot3
.............................................
1,061.95
Lot4
.............................................
1,061.95
Lot5
1,061.95
.............................................
Lot
6
1,061.95
.............................................
Lot7
.............................................
1,061.95
Lot
8
1,061.95
.............................................
Lot9
995.57
.............................................
Lot10
995.57
............................................
Lot
11
1,003.54
............................................
Lot12
1,003.54
............................................
Lot
13
1,123.01
............................................
Lot 1 ............................................. 33,966.05
Block 7
Lot1 ............................................. 1,327.43
Lot2 ............................................. 1,061.95
Lot 3 ............................................. 1,061.95
Lot14
995.57
.............................................
............................................
Lot
2
Lot15
1,061.95
995.57
.............................................
............................................
1,061.95
Lot16
1,194.69
Lot
4
............................................
1,194.69
Lot
17
1,194.69
Lot5
1,194.69
............................................
.............................................
Lot18
............................................
995.57
1,061.95
.............................................
Lot19
7
............................................
995.57
Lot8
.............................................
1,217.26
Lot20
995.57
............................................
Lot21
4,945.68
............................................
Block
Lot1
1,421.68
.............................................
Lot2
1,261.06
.............................................
Lot
3
1,225.22
.............................................
Lot4
1,253.10
.............................................
Lot5
1,061.95
.............................................
Lot
6
.............................................
1,194.69
Lot
7
.............................................
1,194.69
Lot8
.............................................
1,061.95
Lot9
.............................................
1,061.95
Lot10
1,109.73
............................................
Lot11
............................................
1,983.19
Lot
12
............................................
1,677.88
Lot13
............................................
7,878.32
Block 5
Lot 1 ............................................. 33,966.05
Block 7
Lot1 ............................................. 1,327.43
Lot2 ............................................. 1,061.95
Lot 3 ............................................. 1,061.95
Lot1
1,217.27
.............................................
Lot
2
1,061.95
.............................................
Lot3
1,061.95
.............................................
Lot
4
1,194.69
.............................................
Lot5
1,194.69
.............................................
Lot6
1,061.95
.............................................
Lot
7
.............................................
1,061.95
Lot8
.............................................
1,217.26
Block 6
Lot 1 ............................................. 33,966.05
Block 7
Lot1 ............................................. 1,327.43
Lot2 ............................................. 1,061.95
Lot 3 ............................................. 1,061.95
Lot4 ............................................. 1,403.10
Lot5 ............................................. 1,514.61
Lot 6 ............................................. 1,327.43
Lot7 ............................................. 13,289.93
Lot 8 ............................................. 9,623.07
Lot9 ............................................. 4,588.80
Lot 10 ............................................ 1,194.69
Lot 11 ............................................ 1,194.69
Lot 12.. ................. 1,327.43
Block 8
Lot1 ............................................. 8,685.88
Lot 2 ............................................. 15,682.12
Lot3 ............................................. 3,003.77
Lot4 ............................................. 3,113.90
Lot5 ............................................. 3,237.40
Lot 6 ............................................. 2,656.67
Lot7 ............................................. 1,322.13
Lot8 ............................................. 862.84
Lot9 ............................................. 923.89
Lot10 ............................................ 796.47
Lot 11 ............................................ 3,420.95
Lot12 ............................................ 37,743.40
TOTAL $464,492.46
Section 2. Said amounts so levied, apportioned and assessed as
aforesaid will be due and collectible in ten equal installments, the first
becoming due with the taxes levied for the year 1983, and one of said
installments falling due each and every year thereafter until all are paid and
all to be collected with interest as in this ordinance provided, HOWEVER, that
the owner of any piece or parcel of property liable for any such assessments may
redeem his property from such liability bypaying to the City Treasurer the entire
amount chargeable against the same, as in this ordinance provided, at any time
within thirty days after the publication of this ordinance and before the
issuance of bonds of said City in payment of the balance of the cost of said
improvements, the property so paid on shall not thereafter be liable for any
further assessments for the cost of said improvements, nor for any part of said
bonds.
Section 3. There is hereby levied further and assessed against such
lots and pieces of ground described in this ordinance, interest at such rate per
annum as shall be borne by bonds hereafter to be issued for the payment of the
remaining unpaid cost of such improvements to be hereafter determined and fixed
by ordinance, when such bonds are issued on all of said installments mentioned
and providedfor in this ordinance, from the date of the bonds which may be issued
at the end of thirty days as specified in the preceding section hereof, as by law
provided, to the time of the collection of the installments as provided by law,
which said interest shall be collected and after the taking effect of this
ordinance and the fixing of said interest rate when such bonds are authorized and
issued, however such interest rate shall not exceed 12 percent per annum, it
shall be the duty of the City Clerk of said City to annually, at the same time
other taxes are certified, and until all of said assessments so apportioned and
levied have been certified to the County Clerk of Saline County, Kansas, certify
a full list of all property liable to assessments and taxation for such work and
improvements, except such property on which the special assessments aforesaid
have been paid in full, as hereinbefore provided, together with the respective
amounts due on each of said lots and pieces of ground, which amounts shall
include the annual installments on special assessments together with the
interestfor one year at the rate to be fixed as provided for in this ordinance,
on all unpaid balances of such assessments, such amounts so certified as herein
provided shall be placed upon the tax roll by the County Clerk of Saline County,
Kansas, and collected as other taxes are collected.
Section 4. That this ordinance shall be in full force and effect from
and after its adoption and publication once in the official city newspaper.
Introduced: January 24, 1983
Passed: February 7, 1983
Keit G. uc ers, Mayor
(SEAL)
ATTEST:
D. L. Harrison, City Clerk