Loading...
18-7642 Amending Article VIII of Comprehensive Fee Schedule for 2019 RESOLUTION NUMBER 18-7642 A RESOLUTION ESTABLISHING VARIOUS FEES FOR SERVICES IN THE COMPREHENSIVE FEE SCHEDULE OF THE CITY OF SALINA, KANSAS z - WHEREAS, the City of Salina provides many specific services for the Citizens of Salina; and WHEREAS, specific individuals benefit from said services; and WEHREAS, it is appropriate public policy to require specific individuals benefiting from specific services to pay all or a portion of the cost of such services; and WHEREAS, Salina Code 2-3 provides that the Board of Commissioners shall determine, by resolution, all license fees, permit fees and other user related fees or changes established by the ordinances of the city, SO NOW, THEREFORE BE IT RESOLVED by the Governing Body of the City of Salina, Kansas: Section 1. That Article VIII relating to Utility Right of\Vay Permit, Inspection of Permitted Work, and Sanitation Fees in the Comprehensive Fee Schedule attached hereto as Exhibit A are hereby amended and adopted. Section 2. That all fees are to be effective and affirmed January 1, 2019. Section 3. That this Resolution shall be in full force and effect from and after its adoption. Adopted by the Board of Commissioners and signed by the Mayor this 10th day of December, 2018. 44g Karl F. Ryan, Mayo (SEAL) ATTEST: Mali Ji i/)Dn Shandi Wicks, CMC, City Clerk 0 - • ' ARTICLE VIII 43.UBLIC;WORKSi . '. DESCRIPTION AMOUNT UNIT EFF.DATE ESTABLISHED BY ENGINEERING PERMITS Concrete Construction Permit 515.00 1/1/2019 Resolution No. 18-7593 Land Disturbance Permit(Residential) 515.00 1/12019 Resolution No. 18-7593 Proximity Construction Permit SI08.00 1/12019 Resolution No. 18-7593 Right-of-Way Dumpster Permit $38.00 1/12019 Resolution No. 18-7593 Right-of-Way Excavation Permit S44.00 1/1/2019 Resolution No. 18-7593 Stormwater Pollution Prevention Plan $170.00 1/1/2017 Resolution No. 16-7402 (SWPPP-Commercial) Utility Right-of Way Permit $100.00 1/1/2019 Resolution No. 18-7642 Work Without Permit 150%of calculated permit fee 1/12017 Resolution No. 16-7402 OTHER ENGINEERING FEES Address Change $71.00 1/1/2019 Resolution No. 18-7593 Development Feasibility Petition $578.00 1/12019 Resolution No. 18-7593 Illicit Discharge;City Clean Up;minimum 2 $140.00 per hour,minimum 2 hours 1/1/2018 Resolution No. 17-7473 hours Private Development Fees 1/1/2015 Resolution No. 14-7129 Plan Review 1.5%of Developer's Contract 1/12015 Resolution No. 14-7129 Project Inspection 3.5%of Developer's Contract 1/1/2015 Resolution No. 14-7129 Overtime(surcharge) $64.00/hr 1/1/2019 Resolution No. 18-7593 Overtime,Saturdays and Holidays $62.00 per hour 1/12019 minimum 4 hours Resolution No. I8-7593 License Agreement S152.00 1/12019 Resolution No. 18-7593 Residential/Commercial Land Disturbance 556.00 1/1/2019 Re-inspection Fee Resolution No. 18-7593 Reimbursement for Damages in Right-of- Way Cost+ 10% 1/1/2018Resolution No. 16-7402 Street-Alley Vacation $180.00 1/12019 Resolution No. 18-7593 Traffic Control Plan Preparation $14.00 1/12019 Resolution No. 18-7593 MAPS AND PHOTOS 8.5"x11" $1.00 1/12017 Resolution No. 16-7421 II"x17" $2.00 1/1/2017 Resolution No. 16-7421 Maps prepared on a large format plotter and $7.00/square ft 1/1/2017 Resolution No. 16-7402 oversize photos Salina Street Map(18"x 25V $4.00 1/12019 Resolution No. 18-7593 STREETS Utility Cuts Compacted Backfill, flushing $2.30 cubic foot 1/1/2019 Resolution No. 18-7593 Concrete Debris Hauling $84.00 per load 1/1/2019 Resolution No. 18-7593 Other Debris Hauling $53.00 per load 1/12019 Resolution No. 18-7593 Excavation $2.30 square foot 1/12019 Resolution No. 18-7593 Flow Fill $3.60 cubic foot 1/1/2019 Resolution No. 18-7593 Replace Concrete Pavement(8") $8.25 square foot 1/12019 Resolution No. 18-7593 City of Salina-Comprehensive Fee Schedule-2018 Page 34 ' ARTICLE VIII: . PUBLIC WORKS DESCRIPTION AMOUNT UNIT EFF.DATE ESTABLISHED BY Replace Brick SI1.75 square foot 1/1/2019 Resolution No. 18-7593 Replace Asphalt $9.50 square foot 1/12019 Resolution No. 18-7593 Saw Pavement $4.10 linear foot 1/1/2019 Resolution No. 18-7593 Replace Sidewalk $6.15 square foot 1/12019 Resolution No. 18-7593 Replace Curb&Gutter $30.00 linear foot 1/12019 Resolution No. 18-7593 Replace Gravel on Street/Alley $1.55 square foot 1/1/2019 Resolution No. 18-7593 City of Salina-Comprehensive Fee Schedule-2018 Page 35 ARTICLE VIII:, PUBLIC WORKS - DESCRIPTION AMOUNT UNIT EFT. DATE ESTABLISHED BY SANITATION Curb&Alley Service $16.00 per month 1/1/2019 Resolution No. 18-7642 \Valk-In-assistance required $16.00 per month 1/1/2019 Resolution No. 18-7642 Minimum Fee(0-15 days) $8.00 per veek 1/1/2019 Resolution No. 18-7642 Prorated Partial Month(16-31 days) $0.53 per day 1/1/2019 Resolution No. 18-7642 Special Pickup Customer First 15 minutes S25.00 minimum 1/1/2019 Resolution No. 18-7593 Each additional 1/2 hr or portion 1/1/2019 thereof S25.00 Resolution No. 18-7593 Non-customer, residential First 15 minutes S50.00 minimum 1/1/2019 Resolution No. 18-7593 Each additional t/2 hr or portion 1/1/2019 thereof S50.00 Resolution No. 18-7593 Return Pick-Up $13.50 1/1/2019 Resolution No. 18-7593 One return pick-up free per calendar year Start-up/Transfer Fee $10.50 1/1/2018 Resolution No. 17-7473 • 50%of City's most recent Yard Waste Cart purchase price 1/1/2004 Resolution No. 18-7642 Curbside Recycling Stan-up fee $10.50 1/1/2019 Resolution No. 17-7473 Curbside recycling service $5.50 per month 1/1/2019 Resolution No. 17-7473 Tires Auto-No Rim $3.50 each 1/1/2019 Resolution No. 18-7593 Auto-With Rim $10.50 each 1/1/2018 Resolution No. 17-7473 Truck-No Rim $7.25 each 1/1/2019 Resolution No. 18-7593 Truck-With Rim $13.75 each 1/1/2019 Resolution No. 18-7593 Equipment/Truck-No Rim $22.25 each 1/1/2019 Resolution No. 18-7593 Equipment/Truck- With Rim $28.75 each 1/1/2019 Resolution No. 18-7593 18.4 or above-No Rim S32.25 each 1/1/2019 Resolution No. 18-7593 18.4 or above- With Rim $38.75 each 1/1/2019 Resolution No. 18-7593 City of Salina-Comprehensive Fee Schedule-2018 Page 36 - . , t.-. ,_ ? :' "ARTICLE VIII: . PUBLIC,WORKS: DESCRIPTION AMOUNT UNIT EFF. DATE ESTABLISHED BY LANDFILL Up 660 560 lbs $10.00 per vehicle 1/1/2014 Resolution No. 13-7033 Charge Per Ton Above 660 560 lbs $3550 1/1/2019 Resolution No. 18-7593 Commercial Yard Waste 517.75 per ton 1/1/2019 Resolution No. 18-7593 Tires Auto-No Rim S2.50 each 1/1/2019 Resolution No. 18-7593 Auto-With Rim $9.00 each 1/1/2019 Resolution No. 18-7593 Truck-No Rim 56.25 each 1/1/2019 Resolution No. 18-7593 Truck-With Rim $12.75 each 1/1/2019 Resolution No. 18-7593 Equipment/Truck-No Rim $21.25 each 1/1/2019 Resolution No. 18-7593 Equipment/Truck-With Rim S27.75 each 1/1/2019 Resolution No. 18-7593 18.4 or above-No Rim $31.25 each 1/1/2019 Resolution No. 18-7593 18.4 or above-With Rim S37.75 each 1/1/2019 Resolution No. 18-7593 23.5-30.5 $62.75 each 1/12019 Resolution No. 18-7593 Asbestos* Friable $71.00 per ton 1/1/2019 Resolution No. 18-7593 Non-Friable $35.50 per ton 1/1/2019 Resolution No. 18-7593 Contaminated Soil* $71.00 per ton 1/1/2019 Resolution No. 18-7593 *:VOTE: Asbestos and contaminated soil must have special authorization to dispose of and asbestos must be disposed of in an approved container. Loads of Rock,Concrete or Masonry $71.00 per ton 1/1/2019 Resolution No. 18-7593 Products or loads consisting of more than 25%of rock, concrete or masonry products,shall be double the fees per ton. City of Salina-Comprehensive Fee Schedule-2018 Page 37