18-7642 Amending Article VIII of Comprehensive Fee Schedule for 2019 RESOLUTION NUMBER 18-7642
A RESOLUTION ESTABLISHING VARIOUS FEES FOR SERVICES IN THE
COMPREHENSIVE FEE SCHEDULE OF THE CITY OF SALINA, KANSAS
z
- WHEREAS, the City of Salina provides many specific services for the Citizens of Salina; and
WHEREAS, specific individuals benefit from said services; and
WEHREAS, it is appropriate public policy to require specific individuals benefiting from specific
services to pay all or a portion of the cost of such services; and
WHEREAS, Salina Code 2-3 provides that the Board of Commissioners shall determine, by
resolution, all license fees, permit fees and other user related fees or changes established by the
ordinances of the city, SO NOW, THEREFORE
BE IT RESOLVED by the Governing Body of the City of Salina, Kansas:
Section 1. That Article VIII relating to Utility Right of\Vay Permit, Inspection of Permitted
Work, and Sanitation Fees in the Comprehensive Fee Schedule attached hereto as Exhibit A are
hereby amended and adopted.
Section 2. That all fees are to be effective and affirmed January 1, 2019.
Section 3. That this Resolution shall be in full force and effect from and after its adoption.
Adopted by the Board of Commissioners and signed by the Mayor this 10th day of December, 2018.
44g
Karl F. Ryan, Mayo
(SEAL)
ATTEST:
Mali Ji i/)Dn
Shandi Wicks, CMC, City Clerk
0
-
•
' ARTICLE VIII 43.UBLIC;WORKSi . '.
DESCRIPTION AMOUNT UNIT EFF.DATE ESTABLISHED BY
ENGINEERING PERMITS
Concrete Construction Permit 515.00 1/1/2019 Resolution No. 18-7593
Land Disturbance Permit(Residential) 515.00 1/12019 Resolution No. 18-7593
Proximity Construction Permit SI08.00 1/12019 Resolution No. 18-7593
Right-of-Way Dumpster Permit $38.00 1/12019 Resolution No. 18-7593
Right-of-Way Excavation Permit S44.00 1/1/2019 Resolution No. 18-7593
Stormwater Pollution Prevention Plan $170.00 1/1/2017 Resolution No. 16-7402
(SWPPP-Commercial)
Utility Right-of Way Permit $100.00 1/1/2019 Resolution No. 18-7642
Work Without Permit 150%of calculated permit fee 1/12017 Resolution No. 16-7402
OTHER ENGINEERING FEES
Address Change $71.00 1/1/2019 Resolution No. 18-7593
Development Feasibility Petition $578.00 1/12019 Resolution No. 18-7593
Illicit Discharge;City Clean Up;minimum 2 $140.00 per hour,minimum 2 hours 1/1/2018 Resolution No. 17-7473
hours
Private Development Fees 1/1/2015 Resolution No. 14-7129
Plan Review 1.5%of Developer's Contract 1/12015 Resolution No. 14-7129
Project Inspection 3.5%of Developer's Contract 1/1/2015 Resolution No. 14-7129
Overtime(surcharge) $64.00/hr 1/1/2019 Resolution No. 18-7593
Overtime,Saturdays and Holidays $62.00 per hour 1/12019
minimum 4 hours Resolution No. I8-7593
License Agreement S152.00 1/12019 Resolution No. 18-7593
Residential/Commercial Land Disturbance 556.00 1/1/2019
Re-inspection Fee Resolution No. 18-7593
Reimbursement for Damages in Right-of-
Way Cost+ 10% 1/1/2018Resolution No. 16-7402
Street-Alley Vacation $180.00 1/12019 Resolution No. 18-7593
Traffic Control Plan Preparation $14.00 1/12019 Resolution No. 18-7593
MAPS AND PHOTOS
8.5"x11" $1.00 1/12017 Resolution No. 16-7421
II"x17" $2.00 1/1/2017 Resolution No. 16-7421
Maps prepared on a large format plotter and $7.00/square ft 1/1/2017 Resolution No. 16-7402
oversize photos
Salina Street Map(18"x 25V $4.00 1/12019 Resolution No. 18-7593
STREETS
Utility Cuts
Compacted Backfill, flushing $2.30 cubic foot 1/1/2019 Resolution No. 18-7593
Concrete Debris Hauling $84.00 per load 1/1/2019 Resolution No. 18-7593
Other Debris Hauling $53.00 per load 1/12019 Resolution No. 18-7593
Excavation $2.30 square foot 1/12019 Resolution No. 18-7593
Flow Fill $3.60 cubic foot 1/1/2019 Resolution No. 18-7593
Replace Concrete Pavement(8") $8.25 square foot 1/12019 Resolution No. 18-7593
City of Salina-Comprehensive Fee Schedule-2018 Page 34
' ARTICLE VIII: . PUBLIC WORKS
DESCRIPTION AMOUNT UNIT EFF.DATE ESTABLISHED BY
Replace Brick SI1.75 square foot 1/1/2019 Resolution No. 18-7593
Replace Asphalt $9.50 square foot 1/12019 Resolution No. 18-7593
Saw Pavement $4.10 linear foot 1/1/2019 Resolution No. 18-7593
Replace Sidewalk $6.15 square foot 1/12019 Resolution No. 18-7593
Replace Curb&Gutter $30.00 linear foot 1/12019 Resolution No. 18-7593
Replace Gravel on Street/Alley $1.55 square foot 1/1/2019 Resolution No. 18-7593
City of Salina-Comprehensive Fee Schedule-2018 Page 35
ARTICLE VIII:, PUBLIC WORKS -
DESCRIPTION AMOUNT UNIT EFT. DATE ESTABLISHED BY
SANITATION
Curb&Alley Service $16.00 per month 1/1/2019 Resolution No. 18-7642
\Valk-In-assistance required $16.00 per month 1/1/2019 Resolution No. 18-7642
Minimum Fee(0-15 days) $8.00 per veek 1/1/2019 Resolution No. 18-7642
Prorated Partial Month(16-31 days) $0.53 per day 1/1/2019 Resolution No. 18-7642
Special Pickup
Customer
First 15 minutes S25.00 minimum 1/1/2019 Resolution No. 18-7593
Each additional 1/2 hr or portion 1/1/2019
thereof S25.00 Resolution No. 18-7593
Non-customer, residential
First 15 minutes S50.00 minimum 1/1/2019 Resolution No. 18-7593
Each additional t/2 hr or portion 1/1/2019
thereof S50.00 Resolution No. 18-7593
Return Pick-Up $13.50 1/1/2019 Resolution No. 18-7593
One return pick-up free per calendar year
Start-up/Transfer Fee $10.50 1/1/2018 Resolution No. 17-7473
• 50%of City's most recent
Yard Waste Cart purchase price 1/1/2004 Resolution No. 18-7642
Curbside Recycling
Stan-up fee $10.50 1/1/2019 Resolution No. 17-7473
Curbside recycling service $5.50 per month 1/1/2019 Resolution No. 17-7473
Tires
Auto-No Rim $3.50 each 1/1/2019 Resolution No. 18-7593
Auto-With Rim $10.50 each 1/1/2018 Resolution No. 17-7473
Truck-No Rim $7.25 each 1/1/2019 Resolution No. 18-7593
Truck-With Rim $13.75 each 1/1/2019 Resolution No. 18-7593
Equipment/Truck-No Rim $22.25 each 1/1/2019 Resolution No. 18-7593
Equipment/Truck- With Rim $28.75 each 1/1/2019 Resolution No. 18-7593
18.4 or above-No Rim S32.25 each 1/1/2019 Resolution No. 18-7593
18.4 or above- With Rim $38.75 each 1/1/2019 Resolution No. 18-7593
City of Salina-Comprehensive Fee Schedule-2018 Page 36
- . , t.-. ,_
? :' "ARTICLE VIII: . PUBLIC,WORKS:
DESCRIPTION AMOUNT UNIT EFF. DATE ESTABLISHED BY
LANDFILL
Up 660 560 lbs $10.00 per vehicle 1/1/2014 Resolution No. 13-7033
Charge Per Ton Above 660 560 lbs $3550 1/1/2019 Resolution No. 18-7593
Commercial Yard Waste 517.75 per ton 1/1/2019 Resolution No. 18-7593
Tires
Auto-No Rim S2.50 each 1/1/2019 Resolution No. 18-7593
Auto-With Rim $9.00 each 1/1/2019 Resolution No. 18-7593
Truck-No Rim 56.25 each 1/1/2019 Resolution No. 18-7593
Truck-With Rim $12.75 each 1/1/2019 Resolution No. 18-7593
Equipment/Truck-No Rim $21.25 each 1/1/2019 Resolution No. 18-7593
Equipment/Truck-With Rim S27.75 each 1/1/2019 Resolution No. 18-7593
18.4 or above-No Rim $31.25 each 1/1/2019 Resolution No. 18-7593
18.4 or above-With Rim S37.75 each 1/1/2019 Resolution No. 18-7593
23.5-30.5 $62.75 each 1/12019 Resolution No. 18-7593
Asbestos*
Friable $71.00 per ton 1/1/2019 Resolution No. 18-7593
Non-Friable $35.50 per ton 1/1/2019 Resolution No. 18-7593
Contaminated Soil* $71.00 per ton 1/1/2019 Resolution No. 18-7593
*:VOTE: Asbestos and contaminated soil must have special authorization to dispose of and asbestos
must be disposed of in an approved container.
Loads of Rock,Concrete or Masonry $71.00 per ton 1/1/2019 Resolution No. 18-7593
Products or loads consisting of more than 25%of rock, concrete or masonry products,shall be double the fees per
ton.
City of Salina-Comprehensive Fee Schedule-2018 Page 37