Loading...
8044 Permit FeesCONSOLIDATED -SALIVA I ORDINANCE NUMBER 8044 (Published in the Salina Journal ��_ 1969) AN ORDINANCE AMENDING SECTION 9-25 OF THE SALINA CODE, AND REPEALING THE ORIGINAL SECTION. BE IT ORDAINED by the Governing Body of the City of Salina, Kansas: Section 1. That Section 9-25 of the Salina Code is hereby amended to read as follows: "Section 9-25. PERMIT FEES. Section 9-25(1). No permit, as required by the Building Code, shall be issued until the fee prescribed in this article shall have been paid; nor shall an amendment to a permit be approved until the additional fee, if any, due to an increase in the estimated cost of the building or structure, shall have been paid. Section 9-25(2)(a). For a permit for the construction or alteration of a building or structure, the fee shall be computed as follows: First 10,000 square feet of floor area ..... $0.02 per sq. ft. Next 10,000 square feet of floor area...... 0.01 per sq. ft. Per square foot exceeding 20,000........... 0.005 Provided, that there shall be a minimum building !permit fee of ................... 3.00 Section 9-25(2)(b). For a permit for the remodeling or repairing of a building or structure where square footage is not applicable, the fees shall be computed as follows: j First $1,000.00 or fraction thereof ........ $3.00 For each additional $1,000.00 or fraction thereof .................................. 1.50 Section 9-25(3). For a permit for the removal of a building or structure from one lot to another or from without the city to within the city, the fee shall be one-half (1/2) of that prescribed above for new construction. ! Section 9-25(4). For a permit for the removal of a building or structure to a new location within the same lot, the j fee shall be one-half (1/2) of that prescribed above for new j construction. j Section 9-25(5). For a permit for the demolition of a j building or structure, a fee shall be at the rate of one dollar ($1.00) for each ten (10) feet in the height of such building or structure plus one per cent (1%) additional for each foot of street frontage of the building or structure in excess of fifty (50) feet. Section 9-25(6). In case of abandonment or discontinuance, the cost of work performed under a permit may be estimated, an adjustment of the fee made and the portion of the fee for uncompleted work returned to the permit holder: Provided, that no refund of a prescribed minimum fee shall be made. If such discontinuance is due to revocation of permit, a similar adjustment and return may be made: Provided, that no refund shall be made until all penalties incurred or imposed by due authority have been collected. After such a refund has been made, no work shall be resumed until a new application has been made and a new permit has been issued. Section 2. Section 9-25 of the Salina Code is hereby repealed. r CONSOLIDATED -SAUNA 1 1 Section 3. This ordinance shall be in full force and effect from and after its adoption and publication in the official city newspaper. (SEAL) Attest: Ci y C erk Introduced: August 18, 1969 Passed: August 25, 1969 le C Mayo r