Loading...
Memorial Hall Remodeling Outline MEMORIAL HALL REMODELING OUTLINE ROOM 101-102 FIRST FLOOR a) Locate elevator in northwest corner. b) Redesign area to provide secretaries office and directors office. c) Carpet both rooms and corridor. d) Refinish all walls and ceiling. e) Refinish all trim, windows and woodwork. i; f) Re-light area. g) Air condition with window air conditioning units. I i h) Provide drapes at windows . ROOM 104-105 1 a) Carpet. b) Repaint walls and ceiling. c) Refinish wood trim. d) Construct new office adjacent to Room 105 in part of Room 104. e) Air condition with window units. ROOM 106 - GYMNASIUM • a) Provide net divider at center court. • ROOM 107 - EAST EXHIBITION HALL 1 a) Repaint only. h) Air condition with window units. i) Drapes at windows. ROOM 203 - TOILET - 2nd FLOOR WEST a) Replace plumbing fixtures and toilet partitions. b) Replace floor covering. c) Repaint walls and ceiling - epozy. d) New light fixtures. ROOM 205 & 208 - STAIR HALLS a) Refinish walls , floor, ceiling, and' trim. b) New light fixtures. c) Drinking fountains in hall. ROOM 206 - NEW MEETING ROOM ON BALCONY a) Build up floor to level with entry 205 and 208. b) Air condition, remote condensing unit on roof. ROOM 207 - 2nd FLOOR CENTER SOUTH (Little House) a) Carpet. b) . Refinish walls and ceiling. c) Refinish wood trim, windows , doors , etc. d) Provide new drapes. e) Re-light for reading. f) Air condition with window units Memorial Hall • Remodeling Outline Page 3 ROOM 209 - 2ND FLOOR EAST SIDE a) Refinish walls and ceiling. b) Refinish woodwork, windows , doors , etc. c) New floor covering. Vinyl sheet goods. d) Lights OK. e) Air condition with window unit. • f) Provide drapes at window. • • ROOM 210 - . CLOSET a), Refinish walls , ceiling and trim. • • ROOM 211 - TOILET - 2ND FLOOR EAST ' a) . Replace plumbing fixtures. . b) Replace toilet partitions. c) New floor covering. • d) Epoxy walls . e) Repaint ceilings. f) New light fixtures .. • • • • • • • • Memorial Hall Remodeling Outline Page 4 ROOM 301-302-303-304 - 3RD FLOOR WEST a) Elevator - comes up in this area. b) Remainder of room to be refinished as Room 201-202. c) Provide storage closets in the area for different organizations . ROOM 305-306-310-311 - TOILETS 3RD FLOOR a) New plumbing fixtures. b) , New floor covering. • „ c) Repaint walls and ceiling. • d) Build storage units in Room 306 and 310. ROOM 307-•309 - STAIRS & HALL a) Refinish walls , ceiling and floors . b) Re-light. • ROOM 308 - BAND ROOM a) Paint walls and ceiling. b) Carpet. c) New light fixtures. d) Air conditioning OK. ROOM 312-313-314 - 3RD FLOOR EAST a) Carpet. b) Refinish walls , ceiling. c) Refinish all wood trim. d) Move door between 313 and 314 to between 314 - 312 . e) Re-light. f) Air condition with window unit. g) Drapes. Memorial Hall Remodeling Outline Page 5 EXTERIOR RAMP ON WEST OF FRONT STEPS 1" in 12" slope, with handrail both sides 30 ' -0" max interval . gC)44-41 L� • • Memorial Hall Remodeling Outline Page 6 PRELIMINARY COST ESTIMATE 1. New elevator $ 30 , 000 2 . General Construction 40 , 000 3. Painting, Patching & Finishing 50 , 000 4. Plumbing 8 , 000 5. Electrical 12 , 000 —? 6 . Air Conditioning 8 , 000 7. Drapes 3 , 000 8. New Meeting Room #206 (complete) 16 , 000 9 . Replacement windows 40 , 000 CONSTRUCTION TOTAL $207 , 000 Architects Fees 20 , 700 $227 , 700 • •