Loading...
DS - 5-22-13 Work Without Permit         Process Review Report Use this report to identify waste and update processes Use the A3 Report when solving a specific problem   Process Title Work Without Permit Process Number 560.100.148 Date 2-11-13 Originator Team Sean – (Kelly, Ron, Susan, John) Team Members Team Sean – (Kelly, Ron, Susan, John) Objective Eliminate work to create work without permit letter, Reduce time and reduce steps. Identify waste 1. Eliminate duplication by eliminating the preparation and signing of the notification letter. 2. Reduces wait time within processing work without permit violation. 3. Eliminate non – value added work. 4. Reduces duplication of inventory by only having a violation notice instead of having both a violation notice and a courtesy letter. Make Recommendations By eliminating steps 8.9,10,11 and 12 of the work without permit process, we will eliminate duplication and reduce non value added work. XXXXXXXXXXXXXXXXX Immediate Results: • Original process took 77 minutes on average • On average this process was completed 30 times annually. • Amended process takes 50 minutes on average • This is an improvement of 27 minutes on average for an annual savings of 810 minutes (13.5 hours) • This is an improvement of 35% XXXXXXXXXXXXXXXXX Long Term Results: (using bullet points identify those results which may accrue as this proposal is kept in place long term) • Elimination of storing duplicate letters in violation. Labor and cost savings XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX Annual dollar savings: • Savings of postage, envelope and paper for each courtesy letter (approx $.50 a letter). • Projected annual savings of $15 XXXXXXXXXXXXXXXXX Annual hours of increased capacity: • Increased capacity of 810 minutes (13.5 hours) XXXXXXXXXXXXXXXXX Use bullet points to identify customer service or employee benefits: • Elimination of non value added work for employees. Implementation plan • Amend current work without permit policy to eliminate courtesy letter before violation notice. Recommended changes in employee process roles • None Technologies that could be applied to this process • Gov Partner assists in generating violation notice Overview of workgroup’s participation Highlight those words which best describe this workgroup: non-participative, uncooperative, hostile, turbulent, halfhearted, disinterested, divided, collaborative, participating, supportive, enthusiastic Attachments (include current and proposed process documentation forms, or before and after photos, or other before and after descriptions as appropriate) XXXXXXXXXXXXXXXXX Approval Process See next page for approval process Supervisor’s Review and others in the Chain of Command Instructions: This form is submitted through the chain of command to the Director. Date: 5-6-13 Name: Elvin DeVorss Comments: Director’s Approval Instructions: Approval authority is delegated to each Director for all recommendations that result in $5,000 or less in annual savings, or 250 hours or less of annual increased capacity. This form is sent to the Process Improvement Director for his approval Date: 5-6-13 Name: Gary Hobbie Approved/Denied: Process Improvement Director’s Approval Instructions: Upon approval this form is sent to the CMO Executive Assistant, who forwards a copy to members of the Executive Support Team. They determine how to convert hours into budgetary savings. Date:5-22-13 Approved/Denied: City Manager’s Approval Instructions: Final sign off for all recommendations that exceed $5,000 in annual savings, or 250 hours of annual increased functional capacity is by the City Manager, who also signs off on any plans to convert hours to budgetary savings. The CMO Executive Assistant converts the approved form into a pdf file that is saved on the P drive and in Laserfiche. Date: Approved/Denied: