Loading...
PW - 2-6-13 Landfill 6S         Process Review Report Use this report to identify waste and update processes Use the A3 Report when solving a specific problem   Process Title Apply 6S principles to Solid Waste repair/storage buildings, tool rooms, customer convenience area and administration building Process Number 630.350.002 Date 2/1/13 Originator (Identify the individual(s) or team who initiated this review) Ron Rouse, Larry Hammonds Team Members (Identify all those who participated in reviewing this process) All Landfill employees Objective (Begin your objective statement with an action word that describes the goal desired – create, develop, eliminate, reduce, change, modify, improve, increase, expedite, etc.) Apply 6S principles to the Landfill buildings and area Identify waste Identify the waste in each step of the process (non-value added, transporting, excess movement or motion, waiting, mistakes, rework, verifications or duplications, data entry issues, excess inventory, friction, failure to do it right the first time, failure to do the right thing) • Excess movement to locate tools and supplies • Waiting for forms to be copied • Friction between workers about improper tool storage • Confusion of tool and equipment location Make Recommendations (Identify those actions that will eliminate or at least minimize waste) • Mark tools for each building to easily identify where tools belong • Organize and install shelf by tire repair area to store repair products • Install new rack system to hang shovels, brooms, and other tools • Create shadow boards with labeling for wrenches, saws cutters, etc. • Construct storage shelving and racks to house generators, pumps, hoses, etc. • Develop a cleaning schedule fore the restroom in Shop #1 • Label shelves in tool room to locate supplies, kits, cotter pins, sealants, and sprays • Ensure fire and safety items are clearly located, labeled, and ready for immediate use • Identify, mark, and mitigate all potential safety hazards in tool rooms and storage building • Construct a separation barrier between roll-off box #5 and #6. Box #6 is utilized as a scrap metal container within the convenience area. Customers using Box #5 to dispose of waste routinely throw items in the scrap metal box. This barrier should improve separating the items • Develop an information distribution area in the administration building to provide easier access to all required forms for the equipment operators XXXXXXXXXXXXXXXXX Immediate Results: (using bullet points list those results which would accrue immediately upon implementation) • Tool and supply organization • Less time separating trash from the scrap metal box • Less frustration between coworkers concerning tool storage XXXXXXXXXXXXXXXXX Long Term Results: (using bullet points identify those results which may accrue as this proposal is kept in place long term) • Quicker reaction time to emergency situations due to all pumps, hoses etc. are organized by size   Labor and cost savings XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX Annual dollar savings: N/a XXXXXXXXXXXXXXXXX Annual hours of increased capacity: • Finding tools: 10 min x 6 days/wk x 52 wks = 52 hours • Sorting scrap metal: 30 min x 1/wk x 52 wks = 26 hours • Printing load inspection forms: 2 min x 6 day/wk x 52 wks = 10.4 hrs • Estimated annual hours of increased capacity = 88.4 hours XXXXXXXXXXXXXXXXX Use bullet points to identify customer service or employee benefits: • Organization of tools and equipment • No waiting for forms from supervisors • Less time spent separating trash from the scrap metal box • Tools and supplies easily identified and located Implementation plan (briefly describe the implementation plan upon approval of this project) • Mark tools for each building to easily identify where tools belong • Organize and install shelf by tire repair area to store repair products • Install new rack system to hang shovels, brooms, and other tools • Create shadow boards with labeling for wrenches, saws cutters, etc. • Construct storage shelving and racks to house generators, pumps, hoses, etc. • Develop a cleaning schedule for the rest room in shop #1 • Label shelves in tool room to locate supplies, kits, cotter pins, sealants, and sprays • Ensure fire and safety items are clearly located, labeled, and ready for immediate use • Identify, mark, and mitigate all potential safety hazards in tool rooms and storage building • Construct a separation barrier between roll-off box #5 and #6. Box 6 is utilized as a scrap metal container within the convenience area. Customers using box #5 to dispose of waste routinely throw items in the scrap metal box. This barrier should improve separating the items • Develop a information distribution area in the administration building to provide easier access to all required forms for the equipment operators All the above has been completed Recommended changes in employee process roles (identify those changes in employee roles where duties would be transferred to another employee, division, or department) N/A Technologies that could be applied to this process (Identify any software or hardware that could be applied to this process) N/A Overview of workgroup’s participation Highlight those words which best describe this workgroup: non-participative, uncooperative, hostile, turbulent, halfhearted, disinterested, divided, collaborative, participating, supportive, enthusiastic Attachments (include current and proposed process documentation forms, or before and after photos, or other before and after descriptions as appropriate) Plus before and after pictures   XXXXXXXXXXXXXXXXX Approval Process See next page for approval process Supervisor’s Review and others in the Chain of Command Instructions: This form is submitted through the chain of command to the Director. Date: 2/1/13 Name: Ron Rouse / Jim Teutsch (2/5/13) Comments: Great project, it has improved both the look and efficiency of the tool rooms and storage areas. Employees are no longer frustrated due to being able to quickly locate needed tools and supplies. Director’s Approval Instructions: Approval authority is delegated to each Director for all recommendations that result in $5,000 or less in annual savings, or 250 hours or less of annual increased capacity. This form is sent to the Process Improvement Director for his approval Date: 2/6/13 Name: Mike Fraser Approved/Denied: Process Improvement Director’s Approval Instructions: Upon approval this form is sent to the CMO Executive Assistant, who forwards a copy to members of the Executive Support Team. They determine how to convert hours into budgetary savings. Date:2/6/13 Approved/Denied: City Manager’s Approval Instructions: Final sign off for all recommendations that exceed $5,000 in annual savings, or 250 hours of annual increased functional capacity is by the City Manager, who also signs off on any plans to convert hours to budgetary savings. The CMO Executive Assistant converts the approved form into a PDF file that is saved on the P drive and in Laser fiche. Date: Approved/Denied: BEFORE PICTURES:                AFTER PICTURES: