2810 Street Maintenance1
1
�I
RESOLUTION NUMBER 2810
Route Description Number Miles Total
No. Sec. of E�Route
(tines Miles
40 85 Beginning at West City Limitlon 2 0.772 0.772
North Street; thence northeasterly
on alignment of US -40 to Broadway
Street; thence northeasterly on
Broadway Street to its intersection
with Pacific Avenue and Ninth Street.
70 85 Beginning at'�West City Limit; thence 4
0.326
0.326
east 0.326 mile to East City Limit.
Number of Miles of
Nd.
81 85 Beginning at South City Limit on 2
0.500
2 -Lanes
alignment of US -81; thence north- 4
4.913
5.413
wasterly,north and northeasterly on
0.772
Broadway Street to Ninth Street; thence
85
CONCRETE
north on Ninth Street to North City
0.149
81
Limit.
ASPHALTIC CONCRETE
0.168
81 85 Intersection Addition 2
0.033
0.033
TOTAL CONNECTING LINK MILEAGE(net)
1.305
6.544
Quarterly Payment -
TOTAL $2,011.25
2_ -Lanes Miles @ $250.00
1.305 326.25
4 -Lanes Miles @ $500.00
3.370 1685.00
6 -Lanes Miles @ $750.00
8 -Lanes Miles @ $1000.00
Route Surface Type 2 -Lanes 4 -Lanes 6 -Lanes 8-LanE�s
No.. Sec.
-70 85 CONCRETE 0.326
81 85 ASPHALTIC CONCRETE 1.543
Miles to be Maintained by SHC 1.869
CITY 'OF S A L I N A
Attest: H. E. Peterson
Signed Carl Rundquist
Mayor
Route
Surface Type
Number of Miles of
Nd.
Sec.
2 -Lanes
4 -Lanes 6 -Lanes 8-LanE
40
85
CONCRETE
0.772
81
85
CONCRETE
0.365
0.149
81
85
ASPHALTIC CONCRETE
0.168
3.221
Miles to be Maintained by City
1.305
3.370
Quarterly Payment -
TOTAL $2,011.25
2_ -Lanes Miles @ $250.00
1.305 326.25
4 -Lanes Miles @ $500.00
3.370 1685.00
6 -Lanes Miles @ $750.00
8 -Lanes Miles @ $1000.00
Route Surface Type 2 -Lanes 4 -Lanes 6 -Lanes 8-LanE�s
No.. Sec.
-70 85 CONCRETE 0.326
81 85 ASPHALTIC CONCRETE 1.543
Miles to be Maintained by SHC 1.869
CITY 'OF S A L I N A
Attest: H. E. Peterson
Signed Carl Rundquist
Mayor