85-3803 Mechanical Inspection & Permit Fees1
1
1
RESOLUTION NUMBER 85-3803
A .RESOLUTION ESTABLISHING THE MECHANICAL INSPECTION AND
PERMIT FEES PURSUANT TO SECTION 2-2 OF THE SALINA CODE.
BE IT RESOLVED by the Governing Body of the City of Salina,
Kansas: -
Section 1. Pursuant to Salina Code Section 2-2 the mechanical permit
and inspection fees are hereby established as follows:
PERMIT. ISSUANCE
1. For the issuance of each permit ............................. $10.00
2. For issuing each supplemental permit ........................ 3.00
UNIT FEE SCHEDULE
1. For the installation or relocation of each forced -air or
gravity -type furnace or burner, including ducts and vents
attached to such appliance, up to and including 100,000
Btu/h........................................................ 6.00
2. For the installation or relocation of each forced -air or
gravity -type furnace or burner, including ducts and vents
attached to such appliance over 100,000 Btu/h ............... 7.50
3. For the installation or relocation of each floor furnace
including vent .............................................. 6.00
4. For the installation or relocation of each suspended heater,
recessed wall heater or floor -mounted unit heater ........... 6.00
5. For the installation, relocation or replacement of each
appliance vent installed and not included in an appliance
permit ...................................................... 3.00
6. For the repair of, alteration of, or addition to each heating
appliance, refrigeration unit, cooling unit, absorption unit,
or each heating, cooling, absorption, or evaporative cooling
system, including installation of controls regulated by this
code ........................................................ 6.00
7. For the installation or relocation of each boiler or compressor
to and including three horsepower, or each absorption system
to and including 100,000 Btu/h 6.00
8. For the installation or relocation of each boiler or compressor
over three horsepower to and including 15 horsepower, or each
absorption system over 100,000 Btu/h and including 500,000
Btu/h....................................................... 11.00
9. For the installation or relocation of each boiler or compressor
over 15 horsepower to and including 30 horsepower, or each
absorption system over 500,000 Btu/h to and including
1,000,000 Btu/h............................................. 15.00
10. For the installation or relocation of each boiler or compressor
over 30 horsepower to and including 50 horsepower, or for each
absorption system over 1,000,000 Btu/h to and including
1,750,000.Btu/h............................................. 22.50
11. For the installation or relocation of each boiler or refrigeration
compressor over 50 horsepower, or each absorption system over
1,750,000 Btu/h............................................. 37.50
r�
12. For each air -handling unit to and including 10,000 cubic feet
per minute, including ducts attached thereto ................ 4.50
Note: This fee shall not apply to an air -handling unit
which is a portion of a factory -assembled appliance,
cooling unit, evaporative cooler or absorption unit for
which a permit is required elsewhere in this code.
13. For each air -handling unit over 10,000 cfm .................. 7.50
14. For each evaporative cooler other than portable type ........ 4.50
15. For each ventilation fan connected to a single duct ......... 3.00
16. For each ventilation system which is not a portion of any
heating or air-conditioning system authorized by a permit ... 4.50
17. For the installation of each hood which is served by
mechanical exhaust, including the ducts for such hood ....... 4.50
18. For the installation or relocation of each domestic -type
incinerator ................................................. 7.50
19. For the installation or relocation of each commercial or
industrial -type incinerator ................................. 30.00
20. For each appliance or piece of equipment regulated by this
code but not classed in other appliance categories, or
for which no other fee is listed in this code ............... 4.50
21. When Chapter 22 is applicable (see Section 103), permit fees
for fuel -gas piping shall be as follows:
For each gas -piping system of one to four outlets ........... 2.00
For each gas -piping system of five or more outlets,
per outlet ........................ 0.50
OTHER INSPECTION FEES:
1. Inspections outside of normal business hours
(minimum charge - two hours) ..................... $15.00 per hour
2. Reinspection fee assessed under provisions of
Section 305(f) ........... $15.00 each
3. Inspections for which no fee is specifically indicated
(minimum charge - one-half hour) ................. $15.00 per hour
4. Additional plan review required by changes, additions
or revisions to approved plan $15.00 per hour
(minimum charge - one-half hour)
Section 2. That this resolution shall be in full force and effect from
and after its adoption.
Adopted by the Board of Commissioners and signed by the Mayor this
12th day of August, 1985.
Merle A. Hodges, M.D., Mayor
[SEAL]
ATTEST:
D. L. Harrison, City Clerk