Loading...
Diamond Drive Master Plan DIAMOND DRIVE MASTER PLAN CITY OF SALINA, KANSAS Cliy'Of Interstate 70 to Pleasant Hill Road between Ninth Street & 2,660 ft. West of Ninth Street FINAL ENGINEERING REpORT October 2005 ....... BUCHER, WilLIS & RATLIFF ....J.~ CORPORATION I I I I I I I I I I I I I I I I I I I City of Salina, Kansas DIAMOND DRIVE MASTER PLAN: Interstate 70 to Pleasant Hill Road between Ninth Street & 2,660 Ft. West of Ninth Street .. &\\\,,,"'m",,,,,~ r!t..~ ~ AND~~"~ - ~~?~~\ .~~1692~ \~\ .i1fI7-0S)~j - \....~..~ANS~?....~, ~ ('3'8, ........~~ra ~ ~11,I..10NA\. ~\~~ ""'II"II"''''''~ City Commissioners Deborah P. Divine, Mayor Alan E. Jilka Qonnie D. Marrs ,R. Abner Perney Jphn K. Vanier II CitvManager- Jason Gage' Director of Public Works Shawn O'Leary, P.E. Director of Utilities Martha Tasker City Engineer Brad Johnson, P.E. Director of Planning & Community Development Dean Andrew Address all information regarding this work to: BUCHER, WILLIS & RATLIFF CORPORATION 609 W. North Street Salina, KS 67401 Project No. 2005-0359.01 Ocotber 2005 I I I I I I I I I I I I I I I I I I I . .~"l- DIAMOND DRIVE MASTER PLAN : ~1i,~\"; f~',.:.;...;"':~ ' City of Salina, Kansas TABLE OF CONTENTS 1. SECTION 1 - EXECUTIVE SUMMARY ............................................................................... 1 1.1 Site Grading, Drainage and Streets................................................................................... 1 1.1.1 Site Grading and Drainage.................... ..... .......................................................... 1 1.1.2 Recommendation for Drainage............................................................................ 1 1.2 Water Distribution System ........ ......................................................... ............................... 2 1.2.1 Phased Approach to Development.............. ......................................................... 2 1.2.2 Replacement of 6-inch Water Line Segment .......................................................2 1.2.3 Water Line Construction Cost Estimate ..............................................................2 1.3 Sanitary Sewer Service..................................................................................................... 2 1.3.1 Gravity Sewer Service...... ...... ................... .............................................. ............. 2 1.3.2 Pump Station Replacement........... ..... .................................................................. 3 1.3.3. Sanitary Sewer System Cost Estimate ........... ..................................... ................. 3 1.4 Total Project..................................................................................................................... 3 2. SECTION 2 - SITE GRADING, DRAINAGE AND STREETS .............................................4 2.1 GeneraL................................. ............................................................................................ 4 2.2 Existing Conditions............................................................ ~ ............. ................................ 4 2.3 Proposed Conditions....................................................................... .................................. 4 2.3.1 Phase I............... ..................... ... ..................... ........................................ .............. 4 2.3.2 Phase II....................................... .......................................................................... 5 2.4 Recommendations............................................................................................................ 7 2.4.1 Phase I Estimate................................................................... ................................ 7 2.4.2 Phase II Estimate................................................................................ .................. 8 3. SECTION 3 - WATER DISTRIBUTION SySTEM................................................................ 9 3.1 GeneraL............................................................................................................................. 9 3.2 Altemati ves................................................................. ...................................................... 9 3 .3 Water Distribution System - Phase I ....................... .................. ............ .................. ....... 10 3 .4 Water Distribution System - Phase II................................................. ......................... ,.. 10 3.5 Recommendations and Costs......... ................................................................................. 11 4. SECTION4- SANITARY SEWER SERVICE .................................................................... 12 4.1 GeneraL...................:.............................................. ......................................................... 12 4.2 Anticipated Flows........................................................................................................... 12 P'\2005-0359\DlAMOND DR. MASTER PlANIOlIREPORTlDlAMONDDR.MASTERDOC Bucher, Willis & Ratliff Corporation - i I I I I I I I I I I I I I I I I I I I ,~~, . '-, ':,~ i~t~ . DIAMOND DRIVE MASTER PLAN !!~/::if /~ City of Salina, Kansas 4.4 Existing Gravity Sewer Collection System .................................................................... 13 4.5 Proposed Gravity Sewer Collection System.. ..... ............................................................ 14 4.5.1 Alternative 1....................................................................................................... 14 I 4.5.2 Alternative 2....................................................................................................... 15 4.6 Sanitary Sewer Recommendation .......... ........................................... ...................... ........ 16 4.7 Effect of Proposed Development Area on Downstream Pump Stations ........................ 16 4.7.1 Existing Wastewater Flow Routes........................................ ............................. 16 4.7.2 Existing Pump Stations....................................... ............................................... 16 4.7.3 Pump Station No. 28 (Thomas Park) ................................................................. 17 4.7.4 Pump Station No. 29 (Bosselman Travel Center)............................................... 17 4.7.5 Pump Station No. 30 (Diamond Drive Area)....................................:................ 17 4.8 KDHE Pump Station Guidelines.. .................................................................................. 17 4.9 Capacities of Existing Pump Stations....... ...................................................................... 18 4.10 Sanitary Sewer Service - Phase I ......................... ,..... ........ ..... ......... .............................. 18 4.11 Sanitary Sewer Service - Phase IT .................................................................................. 19 4.12 Cost Estimates - Phase I & Phase IT.................. ............... .............................................. 20 List of Tables Table 1: Sub-Areas Acreage and Design Wastewater Flow................................................ 13 List of Appendices APPENDIX A: FIGURES Figure 1 - General Site & Drainage Layout Figure 2 - Proposed Water Line Improvements Figure 3 - Sub-Areas Figure 4 - Existing Sanitary Sewer System Figure 5 - Existing Sanitary Sewers Figure 6 - Proposed Sewer Collection System Figure 7 - Pump Station Locations Figure 8 -Sanitary Sewer Service Phase II Schematic P:\2005.0359\DIAMOND DR. MASTER PIAN\Ol\REPORT\DIAMONDDR.MASTER.DOC Bucher, Willis & Ratliff Corporation -.ii I I I I I I I I I I I I I I I I I I I DIAMOND DRiVE MASTER PLAN City of Salina, Kansas 1. SECTION I-EXECUTIVE SUMMARY 1.1 Site Grading, Drainage and Streets 1.1.1 Site Grading and Drainage The proposed, light industrial development area is bounded by Interstate 70 on the south, 9th Street on the east, Pleasant Hill Road on the north, and approximately 2,660 feet west of 9th Street on the west. Two phases were developed as possible means for addressing storm drainage and runoff from the area. The following improvements are recommended to provide storm drainage for the developed area. . Extend Diamond Drive with curb and gutter, an enclosed storm sewer system, and detention pond storage for the individual lots along Diamond Drive. This constitutes Phase 1. . Three alternatives were evaluated for Phase n. The basic concept is to create a drainage ditch from Diamond Drive north to a detention pond south of Pleasant Hill Road. Runoff will be conveyed to the north via this ditch. Phase I improvements are estimated at $906,400 and Phase II is estimated at $547,700. ., , 1.1.2 Recommendation for Drainage For ultimate development within the Master Plan area, the following improvements should be made: . Phase I improvements shall be constructed as identified.. Extend Diamond Dri ve westward with enclosed storm water system, construct detention ponds on the individual lots, and direct the drainage south of Diamond Drive to the existing Interstate 70 drainage system. . Recommended Phase II improvements shall include construction of a drainage ditch northward from Diamond Drive to Pleasant Hill Road, construction of a detention. pond just south of Pleasant Hill Road, and replacement of a 36-inch drainage pipe under Diamond Drive with a 24-inch pipe to create a backwater situation. Bucher, Willis & Ratliff Corporation - 1 P:\200S-0359\DlAMOND DR. MASTER PlAN\Ol\REpORT\DIAM:ONDDR-MASTER.DOC I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas 1.2 Water Distribution System 1.2.1 Phased Approach to Development To provide the light industrial development area with an adequate water supply and to facilitate the development, a phased approach to constructing water lines is recommended. Initial development within the area is anticipated along Diamond Drive. Under the first phase, an 8-inch water line is proposed. This line will extend westward from the existing 8-inch line along Diamond Drive and then run northward and eastward tying into the existing system creating a loop in the southern portion of the development area. The second phase includes an 8-inch loop encompassing the northern portion of the area. 1.2.2 Replacement of 6-inch Water Line Segment A 6-inch water line segment currently exists along Diamond Drive and serves the existing 8-inch line that will become part of the proposed water line looping within the area. Under fire flow conditions, this 6-inch segment becomes a bottleneck restricting the flow capacity. It is recommended that this segment be replaced with an 8-inch line. 1.2.3 Water Line Construction Cost Estimate Total costs for the two phases and the replacement of the 6-inch water line segment are estimated to be approximately $269,900 for Phase I and $165,530 for Phase IT. 1.3 Sanitary Sewer Service 1.3.1 Gravity Sewer Service It is recommended that the existing 8-inch sewer lines in the vicinity be extended to provide sanitary sewer service for the entire area. Extending the existing sewer line westward along Diamond Drive will serve the anticipated initial development and will constitute Phase I. Additional extensions from sewer lines located on Monarch Dri ve and within the Ninth Street right-of-way will provide service as development progresses. These additional extensions along with the replacement of Pump Station No. 30 will comprise Phase IT improvements. P:\2005-0359\DIAMOND DR. MASTER Pl..AN\Dl\REpORT\DlAMONDDR~MASTER.DOC Bucher. Willis & Ratliff Corporation - 2 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas 1.3.2 Pump Station Replacement Pump stations receiving the flows from the development area will become overwhelmed. Replacing Pump Station No. 30 with a larger capacity pump station will be necessary if the area is to fully develop. Additionally, it is recommended that the discharge from Pump Station No. 30 be relocated to a manhole located at Ninth and Otis A venue. This will greatly reduce the loads on Pump Stations No., 28 and 29 and allow for growth in other potential development areas within the City. Again, this pump station replacement and discharge relocation are anticipated as part of Phase n. 1.3.3 Sanitary Sewer System Cost Estimate Total costs for Phase I of the gravity sewer system are estimated to be approximately $117,200. Total costs for Phase n sanitary sewer improvements, including the replacement of Pump Station No. 30 with one having a 700 gallon per minute capacity, are approximately $788,800. The total for both phases is therefore $906,000. 1.4 Total Project The following illustrates the total preliminary cost estimate for both Phase I and Phase n improvements. The estimates include street, drainage, water, and sanitary sewer improvements for the development area. Diamond Drive Total Project Costs - Entire Development Area Cost Estimate (2005 Dollars) Phase I Street & Drainage Improvements $ 906,400:00 Water System $ 269,900.00 Sanitary Sewer System $ 117,200.00 .. $ Total Phase I Improvements 1,293,500.00 Phase II Street & Drainage Improvements $ 547,700.00 Water System $ 165,500.00 Sanitary Sewer System $ 788,800.00 Total Phase II Improvements $ 1,502,000.00 P:I2005-0359\DlAMOND DR. MASTER PLAN\OIIREPORTlDlAMONDDR-MASTERDOC Bucher, Willis & RatlijfCorporation - 3 I I I I I I I I I I I I I I I I I I I . ~. :' l DIAMOND DRIVE MASTER PLAN City of Salina, Kansas 2. SECTION 2 - SITE GRADING, DRAINAGE AND STREETS 2.1 General Within this section, the potential stormwater runoff is estimated; a preliminary location for a street is discussed; drainage concepts are defined; alternatives for storm water detention and/or drainage of the. site are evaluated; and anticipated construction costs associated with the identified improvements are gl ven. 2.2 Existing Conditions I.. The existing site is bounded by Interstate 70 on the south, Ninth Street on the east, Pleasant Hill Road on the north, with the western edge located approxiJatelY 2,660 feet west of Ninth Street and contains roughly 172 acres. The eastern half of this site has Jeen platted and some development exists in the southeast comer along Diamond Drive. The site is in a FEMA floodplain and the existing ground generally slopes to the north. The area generally drains northward into the south Pleasant Hill Road ditch, then eastward under Ninth Street. From a previous Bucher, Willis & Ratliff Corporation project in the vicinity, the 100-year floodplain elevation was determined to be approximately 1,223.25 feet above sea level. 2.3 Proposed Conditions 2.3.1 Phase I Phase I includes constructing Diamond Drive as a two lane asphalt street with curb and gutter, sidewalks, and a closed storm sewer system. For Phase I analysis, four lots with an assumed size of 10 acres adjacent to Diamond Drive were analyzed. See Figure 1. The City of Salina codes state that new development must provide storm water detention restricting the peak runoff to be equal to or less than the pre-developed site for a 25 year storm and also state that detention pond bottom cross-slopes must be greater than 2% and contain the required volume of post-development runoff with an additional one foot of freeboard. The Rational Method (Q=c*i* A) for determining runoff was used. The pre-construction runoff would be approximately 16 cubic feet per second (cfs) per 10 acre lot. The post-construction runoff would be approximately 55 cfs per lot. The detention pond size resulting from these flows would have a footprint of approximately 2.5 to 3 acres, 25%-30% of the lot size. A P:\2005-0359\DlAMOND DR. MASTER PLAN\Ol\R.EPOR1\DlAMONDDR.MASTER.DOC Bucher, Willis & Ratliff Corporation - 4 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas detention pond footprint of this size would iiot require piuuping to rid the storm water from the pond. A detention pond with smaller footprint will require a pumping system to drain the pond. . ) The two lots on the south side of Diamond Drive can.be drained to the south to the existing Interstate 70 north ditch via the detention ponds. Coordination with the Kansas Department of Transportation (KDOT) will probably be necessary to drain storm water onto the KDOT right of way. The two lots on the north side of Diamond Drive can be drained through the detention ponds to the storm sewer on the north side of Diamond Dri ve. This water would then flow to the east and then south to the north Interstate 70 ditch. See Section 2.4.1 for estimated costs for Phase I. 2.3.2 Phase IT Phase IT will expand Phase I to include constructing a two lane asphalt street from Diamond Drive north to Pleasant Hill Road with curb and gutter and a drainage ditch from Diamond Dri ve northward to the existing ditch on the south side of Pleasant Hill road. There is roughly 10' offall from the north Diamond Drive ditch flowline to the south Pleasant Hill ditch flowline. A 150' roadway, utility, and drainage easement would be recommended from Diamond Drive north to Pleasant Hill Road. This ditch flow would then run into a detention pond sized for the area shown in Figure 2. The detention pond would have a small outlet structure with flapgate. This would enable runoff from the site to be controlled when the outlet ditch is flowing full and would prevent any high water peaks into the existing ditch from the site after development. Using the criteria mentioned in Phase I, the following table represents the drainage calculations for Phase IT. Pre-Development Post-Development c i A Q c i A Q Sub Area acres Cfs acres cfs 1 0.25 6 70 105 0.85 6 70 357 2 0.25 6 10.4 16 0.85 6 10.4 53 3 0.25 6 4.5 7 0.85 6 4.5 23 4 0.25 6 7.5 11 0.85 6 7.5 38 5 0.25 6 3.6 5 0.85 6 3.6 18 TOTAL 144 489 P,I200S-03S9\DIAMOND DR. MASTER PLAN'<lIIREPORTlDIAMONDDR-MASTER.OOC Bucher, Willis & Ratliff Corporation - 5 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas The proposed detention pond will require approximateiy 13 acre-feet of storage with an allowable discharge of 144 cfs. Because the area is in a FEMA floodplain, the drainage ditch and detention pond can provide a source of fill for the properties to get the required building elevations. It is recommended that the soil be tested to ensure that it is suitable for fill material for the building sites and roadway. All lots adjacent to this drainage ditch as well as the north side of Diamond Drive could be drained utilizing this drainage ditch. Three alternates were analyzed to utilize Phase I improvements with minimal impact for use in Phase n. Alternate 1 would reset the 36" reinforced concrete pipe (RCP) that was installed in Phase I under Diamond Drive flowing from north to south, so that the pipe would flow from south to north instead. This alternate would require tearing out a portion of Diamond Drive and replacing it when the pipe was reset and installing a new outlet pipe to the new drainage ditch. Alternate 2 would reduce the size of the easternmost pipe on the south side of Diamond Drive from a 36" RCP to a 24" RCP. This would create a backwater condition west of this inlet and force the remainder of the storm water to flow to the north and into the drainage ditch. Alternate 3 would leave the Phase I improvements in place with no changes. New development within this alternate would then utilize the drainage ditch and direct the storm water to the north. See Section 2.4.2 for estimated costs for Phase n. P,UOO5-0359\DlAMOND DR. MASTER PLANIOlIREPORT\DlAMONDDR-MASTER.DOC Bucher, Willis & Ratliff Corporation - 6 I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas 2.4 Recommendations I I Phase I is recommend in it entirety. Phase II with Alternate 2 is recommended when development north of Diamond Drive is warranted. 2.4.1 Phase I Estimate I Diamond Drive with Storm Sewer I Estimated Description Quantity Unit Unit Price Extension Phase I Diamond Drive with Storm Sewer Mobilization 1 L.S. 9,000.00 $ 9,000.00 Contractor Construction Stakina 1 L.S. 17,000.00 $ 17,000.00 Common Excavation 1 L.S. 20,000.00 $ 20,000.00 Asphalt SurfacinQ 2430 Ton 46.00 $ 111.,780.00 Curb & Gutter 3600 L.F. 14.00 $ 50,400.00 A5-3 Inlets . 6 Each 3,500.00 $ 21,000.00 Manhole 5 Each 3,700.00 $ 18,500.00 Sidewalk 2000 Sa. Yd. 27.00 $ 54,000.00 36" RCP 2935 L.F. 73.00 $ 214,255.00 36" End Section (RC) 1 Each 804.00 $ 804.00 Seeding & Erosion Control 1 L.S. 7,000.00 $ 7,000.00 Construction Subtotal $ 523,739.00 25% Land Acquisition & Construction Contingencies $ 130,934.75 Total Probable Construction Costs $ 654,673.75 15% EnQineerina, Adiminstrative, LeQal, Etc. $ 98,201 .06 ITotal Probable Phase I Costs $ 752,874.81 I I I I I I Storm Water Detention (assuming one individual 10 acre lot size) I Estimated Description Quantity Unit Unit Price Extension Phase I Storm Water Detention (Assuming 10 Acre lot) Mobilization 1 L.S. 600.00 $ 600~00 Contractor Construction StakinQ 1 L.S. 1 ,100.00 $ 1 ,100.00 Common Excavation 6025 Cu. Yd. 2.00 $ 12,050.00 24" RCP 100 . L.F. 45.00 $ 4 500.00 24" End Section (RC) 1 Each 405.00 $ 405.00 Seeding & Erosion Control 1 L.S. 3,000.00 $ 3,000.00 Pump (If Required) 1 Each 5,000.00 $ 5,000.00 Construction Subtotal $ 26,655.00 25% Land Acquisition & Construction Contingencies $ 6,663.75 Total Probable Construction Costs $ 33,318.75 15% EnQineering, Adiminstrative, Legal, Etc. $ 4,997.81 Total Probable Phase I costs $ 38,316.56 I I I I The total estimated cost for Diamond Drive ($752,874.81) and the four 10 acre lots (4*$38,316.56=$153,266.24) is $906,414.05. I I P:\2005-0359\DlAMOND DR. MASTER PLAN\OI\REPORT\DlAMONDDR.MASTEROOC Bucher, Willis & Ratliff Corporation - 7 I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas I 2.4.2 Phase II Estimate I I Estimated Description Quantity Unit Unit Price Extension Phase II Mobilization 1 L.S. 6,000.00 $ 6,000.00 Contractor Construction Stakina 1 L.S. 12,000.00 $ 12,000.00 Common Excavation 45650 Cu. Yd. 2.00 $ 91,300.00 24" RCP 375 L.F. 45.00 $ 16,875.00 36" RCP I 140 L.F. 73.00 $ 10,220.00 24" End Section 6 Each 405.00 $ 2,430.00 36" End Section 1 Each 804.00 $ 804.00 Headwall & FlaDaate 1 Each 2,500.00 $ 2,500.00 Curb & Gutter 5692 L.F. 14.00 $ 79,688.00 ASDhalt Surfacina 3200 Ton 46.00 $ 147,200.00 Seeding & Erosion Control 1 L.S. 12,000.00 $ 12,000.00 Construction Subtotal $ 381,017.00 25% Land Acquisition & Construction Contingencies $ 95,254.25 Total Probable Construction Costs $ 476,271.25 15% Enaineerina, Adiminstrative, Leaal, Etc. $ 71,440.69 Total Probable Phase II Costs $ 547,711.94 I I I I I I I I I I I I I I I P:\2005.0359\DlAMOND DR. MASTER Pl.AN\Ol\REPORT\DIAMONDDR-MASTER.OOC Bucher, Willis & Ratliff Corporation - 8 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas 3. SECTION 3 - WATER DISTRIBUTION SYSTEM 3.1 General The purpose of the water distribution system analysis was to determine the potential system improvements required to provide average daily water demand, peak daily demand and fire demand for the undeveloped area. With the undeveloped area designated for Light Industrial use, and the wide range of water usage that can be associated with industrial facilities, the projected water usage was estimated based on projected sewer usage for the area. See Section 4.3 for projected sewer usage calculations. Based on previous studies conducted for the City, it is assumed the average water usage will be twice the average sewer usage for the area. The average daily water usage for the undeveloped area is estimated to be 345,600 gallons per day (gpd) or 240 gallons per minute (gpm). From Section 4.3, the projected daily sewer flow is 518,400 gpd. This value contains a peaking factor of3. Thus, 518,400 gpddivided by 3, then multiplied by 2 to obtain twice the average sewer usage yields an average daily water usage of 345,600 gpd. Water distribution systems are generally sized and designed for providing adequate water for fire protection. These design practices are based on the premise that fire flow requirements usually exceed the normal consumptive, peak domestic, industrial and other demands imposed on the water system. Minimum fire flow requirements as set by the International Fire Code are based on building size and type of construction. Assuming the average building size would not exceed the largest existing building in the area (approximately 59,000 sq. ft) and Type I construction for the new development, the minimum required fire flow rate for the area is 2,500 gpm. 3.2 Alternatives Numerous alternatives were evaluated for meeting the required water demands of the undeveloped area. Each alternative was evaluated based on the ability to meet the required minimum fire flow demand and maintain a minimum pressure of 20 psi in the system. Evaluation of the proposed line sizes and capacity was conducted using CYBERNET Version 3.1. . No evaluation of the existing distribution system was conducted to determine its available capacity. The water system improvements were divided into two phases based on an assumed progression of development into the P:\200S-0359\DIAMOND DR. MASTER PLAN\Ol\REPORT\DIAMONDDR-MASTER.DOC Bucher, Willis & Ratliff Corporation - 9 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTERPLAN City of Salina, Kansas area. See Figure 3, Proposed Water Line Improvements. It was assumed that initial development would occur along Diamond Drive prior to the north and east sections of the area being developed. 3.3 Water Distribution System - Phase I Phase I includes the area along Diamond Drive west of the existing 8-inch water line and approximately 1200 feet north of Diamond Drive. Assuming initial development occurs along Diamond Drive, two alternatives were evaluated for providing water service to the area. Alternative No. 1A considered a new 6-inch loop connected to the existing 8-inch water line on Diamond Drive and continuing approximately 1300 feet to the west, then 1200 feet north and 1300 feet east and connecting to the existing 8-inch line at Monarch Road. Alternative No. 1B considered this same route with an 8-inch water line loop. Alternative No. 1A yielded system pressures below 20 psi at the required minimum fire flow demand. Alternative No. 1B yielded higher pressures and flow capacity, however, the system could only provide approximately 2,300 gpm at pressures above 20 psi. During the evaluation, it was noted that the 8-inch line on Diamond Dri ve is served by a 6-inch line from Ninth Street. Replacement of this 6- inch line with a larger line (8-inch) would provide additional flow capacity and system pressure to the area. It is anticipated that flows of 2500 gpm can be achieved and pressures of 24 psi attained by replacing the existing 6-inch segment with an 8-inch line. 3.4 Water Distribution System - Phase IT Phase IT includes the area between Monarch Road and Pleasant Hill Road and approximately 1300 feet west of Ninth Street. Two alternatives were evaluated for providing water service to the area. Alternative No. 2A considered a new 6-inch loop connected to the existing 8-inch water line on Monarch Road and continuing north approximately 1400 feet to Pleasant Hill Road then east 1300 feet and connecting to the existing 8-inch line at Ninth Street. Alternative No. 2B considered this same route with an 8-inch water line loop. Alternative No. 2A yielded system pressures well below 20 psi at the required minimum fire flow demand. Alternative No. 2B can achieve a flow 2700 gpm at 20 psi when replacing the 6-inch segment along Diamond Drive with an 8-inch line. P,\2005-0359\DIAMOND DR. MASTER PLANIOIIREPORTlDIAMONDDR-MASTER.DOC Bucher, Willis & Ratliff Corporation - 10 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas 3.5 Recommendations and Costs As development progresses in the Master Plan area, improvements to the water distribution system can be phased in to accommodate the growth. Alternative No. IB and 2B are recommended to maximize system pressures and flow rates for the Master Plan area. It is also recommended that the existing 6- inch line on Diamond Drive be replaced with an 8-inch line to reduce the bottleneck effect in the area. Phase I improvements include replacing the existing 6-inch line with a new 8-inch line. Costs associated with the recommended improvements are listed below. Water System Improvements Cost Estimate (2005 Dollars) Estimated Description Quantity Unit Unit Price Extension Phase I . Diamond Drive Line Replacement Mobilization 1 L.S. 10,000.00 $ 10,000.00 New 8-inch Water line 1025 L.F. 30.00 $ 30,750.00 Connect to Existinq 2 Each 500.00 $ 1,000.00 Connect Existinq Hydrant 2 Each 500.00 $ 1,000.00 Bore Concrete Driveway 120 L.F. 75.00 $ 9,000.00 Water Line Loop New 8-inch Water Line 3800 L.F. 30.00 $ 114,000.00 Connect to Existinq 2 Each 500.00 $ 1,000.00 Fire Hydrant Assembly 7 Each 3,000.00 $ 21,000.00 Construction Subtotal $ 187,750.00 25% Land Acquisition & ConstructionContinqencies $ 46,937.50 Total Probable Construction Costs $ 234,687.50 15% Enqineerinq, Administrative, Leqal, Etc. $ 35,203.13 Total Probable Phase I Costs $ 269,890.63 Phase II Mobilization 1 L.S. 5,000.00 $ 5,000.00 New 8-inch Water Line 2700 L.F. 30.00 $ 81,000.00 Connect to Existinq 2 Each 500.00 $ 1,000.00 Fire Hydrant Assembly 7 Each 3,000.00 $ 21,000.00 Aqqreqate Surfacinq 1300 L.F. 5.50 $ 7,150.00 Construction Subtotal $ 115,150.00 25% Land Acauisition & Construction Continaencies $ 28,787.50 Total Probable Construction Costs $ 143,937.50 15% Enqineerinq, Administrative, Leqal, Etc. $ 21,590.63 Total Probable Phase II Costs $ 165,528.13 P:\2005-o359\DlAMOND DR. MASTER PLAN\OI\REPORnDlAMONDDR-MASTER.OOC Bucher, Willis & Ratliff Corporation - 11 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas 4. SECTION 4 - SANITARY SEWER SERVICE 4.1 General The primary purposes of the sanitary. sewer analysis were to estimate the potential wastewater volume produced from the Master Plan area, evaluate viable options for wastewater collection within the designated area, evaluate the effects of the additional wastewater flow on the downstream pump stations, and to develop projected costs associated with the proposed improvements. 4.2 Anticipated Flows The Kansas Department of Health and Environment (KDHE) Minimum Standards of Design recommends the following design flows for the various land use categories: Commercial- 5,000 gallons per day per acre (gpd/acre) Industrial - 10,000 gpd/acre The City of Salina has designated the development area as Light Industrial. Total land area within the boundaries identified is approximately 172 acres. Existing within this area are a few commercial businesses reducing the area available for development to approximately 129 acres. Discussions were held with the City of Salina representatives regarding the realistic amount of developable land. Due to rights-of-way, drainage ways, easements, and building set-backs, it was mutually agreed to that the amount of acreage actually available for development would be approximately fifty percent (50%) of the area or 65 acres (129 acres divided by 2). As KDHE has no guideline for a Light Industrial designation and due to the presence of some commercial enterprises, a design flow rate of 8,000 gpd/acre will be used to estimate sanitary sewer flows within the area. This has been the acceptable practice in use by the City of Salina for similar developments. 4.3 Lots or Sub-Areas Using preliminary plats and natural boundaries, the developable area was subdivided into eleven (11) sub-areas. Figure 4 depicts these sub-areas. The approximate total acreage, the approximate developable acreage and the design wastewater flow for each sub-area are listed in Table 1. The design flows listed contain a peaking factor of 3. P,I2005.0359\DlAMOND DR. MASTER Pl.AN'Dl\REPORTlDlAMONDDR.MASTER.DOC Bucher, Willis & Ratliff Corporation - 12 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas Table 1: Sub-Areas Acreage and Design Wastewater Fldw Sub-Area Approx. Acreage Ac 18.2 36.0 36.0 7.5 6.3 3.6 3.2 2.1 3.1 4.1 9.0 Developable Acreage Ac 9.1 18.0 18.0 3.8 3.2 1.8 1.6 1.1 1.6 2.1 4.5 1 2 3 4 5 6 7 8 9 10 11 4.4 Existing Gravity Sewer Collection System Design Flow d/Ac 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 Total Flow: Sub-Area Flow d 72,800 144,000 144,000 30,400 25,600 14,400 12,800 8,800 12,800 16,800 36,000 518,400 Figure 5 illustrates the existing sanitary sewer collection system within the Master Plan area. This existing system is comprised of eight (8) inch gravity sewer pipelines and manholes as indicated. The 8-inch lines running along the south side of Monarch Street and along the west side of Ninth Street intersect the 8-inch line from the south side of Diamond Dri ve in the southwest quadrant of the Ninth StreetlDiamond Drive intersection. From this location, the gravity sewer line flows eastward under Ninth Street into Pump Station No. 30 as shown in Figure 5. Additionally, a portion of ten (10) inch sewer line extends from the east side of Ninth Street, under Ninth Street, and ends approximately 760 feet north of Monarch Road on the west side of Ninth Street and a portion of eight (8) inch sewer line extends under Ninth Street from the east as well within the Pleasant Hill Road right-of-way as shown in Figure 6. The map does not indicate the presence of manholes at the end of these lines and the ends were not field located for purposes of this report. The KDHE's Minimum Standards of Design states that gravity sewers 8-inch through I8-inch should convey the design flow at two-thirds of the pipe depth. An 8-inch line at minimum grade and flowing . two-thirds full can accommodate 389,950 gpd. A lO-inch line at minimum grade flowing two-thirds full can handle 559,035 gpd. P:\200S-0359\DIAMOND DR. MASTER PlAN\Ol\REPORT\DIAMONDDR.MASTER.DOC Bucher. Willis & RatlijfCorporation - 13 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas 4.5 Proposed Gravity Sewer Collection System 4.5.1 Alternative 1 To reduce operation and maintenance expenses, a new wastewater pump station should be avoided if possible. Due to the very minimal amount of physical relief (elevation difference) across the site and the depth of the existing gravity sewer system, it is difficult to serve portions of the site with gravity sewer service. Figure 7 illustrates one alternative for providing gravity service to the eleven identified sub-areas discussed previously. Referring to Figure 7, Lateral A is proposed as an extension of the existing 8-inch gravity sewer line lying along the south side of Diamond Drive. This line can be extended westward to the west edge of the proposed development site at minimum grade and have approximately 5 feet of cover over the pipe at present elevations. Additional cover may be provided as essentially the entire development area is below the 100-year floodplain elevation. Between 5 and 6 feet of fill material is necessary to elevate any building site above the floodplain elevation of 1223.25 and may be placed over proposed Lateral A. Sub-Area 1 and part of Sub-Area 2 would be served by this sewer extension. Initial development is anticipated along Diamond Drive as discussed previously. Lateral B, see Figure 7, is proposed as a T-shaped extension stemming from the existing manhole located at the west end of Monarch Road. The north-south segment of this line would be located within the proposed 150' roadway, utility, and drainage easement. The road serving the area may be constructed at an elevation above the 100-year floodplain elevation. Lateral B could then be located within this road fill. The fill would provide ample cover and freeze protection for the sewer line. Furthermore, locating Lateral B within the road fill will enable extending the lateral northward and southward as far as necessary in order to provide sewer service to Sub-Areas 2, 3, 5, 10, and 11. In the event the road is not constructed above the floodplain elevation, the extent of the sewer line within the proposed 150' easement will be limited due to the lose of cover over the sewer line. Portions of Sub- Area 11 could also be serviced by the line currently in place along Diamond Drive. Ditches are proposed along both sides of the roadway through the development area. Careful planning must be utilized in establishing the ditch and roadway elevations. If Lateral B is located within the roadway fill, service lines from buildings en route to Lateral B would cross the ditches. The ditch, P:\2005-0359\DIAMOND DR. MASTER Pl.AN\Ol\REPORT\DlAMONDDR-MASTER.DOC Bucher, Willis & RatlijfCorporation -14 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas roadway, and sewer elevations should be coordinated to allow service line connection. It is worth noting again that considerable fill is necessary to elevate the building sites above the floodplain and depending upon how access is achieved to the individual buildings from the roadway, the individual sewer service lines could be incorporated with the fill, entrance drive, etc. and be well-protected. Otherwise, individual service lines may have insufficient cover or may be too high at the roadside ditches. 4.5.2 Alternative 2 Another option for providing sanitary sewer service within the development area is to construct the sewers such that they would drain toward the north as does the natural slope of the land. Flow would then be collected in a pump station located just south of Pleasant Hill Road. With a new pump station and all new sewers serving the area, the pipelines could be any size necessary. Another advantage to this alternative is that the sewers could be constructed at the depths needed and would not be tied to the depths of the existing sewers. The roadway would not need to be utilized to provide cover over the pipelines. A disadvantage is that a pump station would be required. P:\200S-0359\DlAMOND DR. MASTER PLAN\Ol\REPORT\DlAMONDDR-MASTER.DOC Bucher, Willis & RatlijfCorporation - 15 I I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas 4.6 Sanitary Sewer Recommendation The estimated wastewater flows for the area are shown in Table 1. Depending upon the di vision of the flows into the respective laterals identified in Alternative 1, flow in a specific lateral may begin to approach the KDHE recommended maximum amount for an 8-inch line. From Section 4.4., this recommended flow is 389,950 gpd. However, due to the presence ofthe existing 8-inch sewer lines in the vicinity, the likely possibility that anticipated flows can adequately be conveyed in 8-inch lines, and the elimination of a new pump station, it is recommended that 8-inch gravity sewers be constructed as detailed in Alternative 1. Phase I would consist of the construction of Lateral A only. Phase IT would consist of the construction of Laterals Band C and improvements to Pump Station No. 30 as discussed below~ 4.7 Effect of Proposed Development Area on Downstream Pump Stations 4.7.1 Existing Wastewater Flow Routes Under the sanitary sewer collection system described above, the wastewater flow would ultimately enter City of Salina Pump Station No. 30. See Figures 5 and 8 for location. From here, flow is . pumped under Interstate 70 and into Pump Station No. 29 - See Figure 8. Flow from Pump Station No. 29 enters the gravity sewer system via a manhole located just east of Ninth Street and west of the Bosselman Travel Center. Continuing straight southward along Ninth Street, flow then enters Pump Station No. 28 as shown in Figure 8. From Pump Station No. 28, the flow is pumped to a manhole located directly south along Ninth Street at Ninth and Otis A venue. From here, the wastewater flows via gravity to Pump Station No. 1 and is subsequently pumped to the wastewater treatment plant. 4.7.2 Existing Pump Stations Pump Stations No. 28, 29, and 30 are Smith & Loveless, wet well/dry well duplex pump stations. All three contain two pumps with each pump's capacity rated at 300 gallons per minute (gpm). From City provided data, the average daily flow was calculated for these three pump stations. The dataprovided consisted of the pump run times, as read and recorded at the respective pump stations, and the date/time the readings were taken. From this data, there is no possibility of calculating the amount of P:\200S-0359\DlAMOND DR. MASTER PLAN\Ol\REPORT\DlAMONDDR-MASTER.DOC Bucher, Willis & Ratliff Corporation - 16 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas the time both pumps ran simultaneously. As such, the assumption was made that at no time did both pumps at a station run simultaneously or if they did, each pump was still capable of 300 gpm. 4.7.3 Pump Station No. 28 (Thomas Park) Following the assumption outlined above and assuming the station's run time or hour meters are operating correctly, the average daily flow for Pump Station No. 28 was calculated. The average daily flow is approximately 98,000 gallons per day (gpd). 4.7.4 Pump Station No. 29 (Bosselman Travel Center) When applying the same assumptions previously described to this pump station, the calculated average daily flows varied greatly - from 89,000 gpd to over 200,000 gpd. No consistency in the data was apparent. Due to this inconsistency and because there were many more notes recorded by City staff regarding maintenance/operational/problematic issues at this station, it appears that both pumps may be frequently operating together thus reducing the 300 gpm flow rate per pump assumed or the hour meters may be recording erroneously. Specifically noted were problems with pumps becoming plugged with rags, towels, etc. at this pump station. Recall that flow from this pump station ultimately reaches Pump Station No. 28. Flow from additional sources also contributes to the volume pumped by Pump Station No. 28. Assuming the calculated flow of 98,000 gpd at Pump Station No. 28 is relatively accurate, the average daily flow at Pump Station No. 29 must be less. For purposes of this report, the average daily flow rate for Pump Station No. 29 shall be 95,000 gpd. 4.7.5 Pump Station No. 30 (Diamond Drive Area) Once again, based on the data provided and the same assumptions listed above, the average daily flow for Pump Station No. 30 is estimated to be 88,300 gpd. 4.8 KDHE Pump Station Guidelines Per the KDHE Minimum Standards for Design, the pump cycle time in a duplex pump station should not be less than 5 minutes. A five minute pump cycle time means a given pump would start 12 times per hour. The pump cycle is defined as the interval of time between two consecuti ve pump starts or P,\2005-0359\DlAMOND DR. MASTER PLANIOIIREPORTlDlAMONDDR-MASTER.DOC Bucher. Willis & Ratliff Corporation -17 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas Pump operates 2.5 minutes and is off 2.5 minutes per cycle. 300 gpm x 2.5 minutes x 12 times per hour x 24 hours per day = 216,000 gpd. 4.9 Capacities of Existing Pump Stations Based on the KDHE guidelines, the capacity of the three pump stations discussed shall be regarded as 216,000 gpd each. Below is a listing of the additional average flow these three pump stations can accept prior to reaching their designated capacity of 216,000 gpd. Additional Capacity of Pump Station: No. 28 (Thomas Park): 216,000 gpd - 98,000 gpd = 118,000 gpd additional capacity No. 29 (Bosselman): 216,000 gpd - 95,000 gpd = 121,000 gpd additional capacity No. 30 (Diamond Drive): 216,000 gpd - 88,300 gpd = 127,700 gpd additional capacity \ Table 1 estimated the wastewater flow for the area when fully developed to be over 518,000 gpd. As development proceeds in the area, the downstream pump stations will exceed their capacities. Because it is difficult to predict the potential industry types and their contributing wastewater flows, the downstream pump stations must be closely monitored as the area develops to ensure that their capacities are not exceeded. 4.10 Sanitary Sewer Service - Phase I The recommendation stated previously is to construct Lateral A as the Phase I improvement. Flow will be collected from the development area and routed to Pump Station No. 30. It is assumed that the flow collected by Lateral A and added to Pump Station No. 30 will not be sufficient to exceed the downstream pump station's capacity. Depending upon the water used, this mayor may not be the case. Careful monitoring of the additional flows is necessary as development progresses so that downstream pump stations do not become overloaded. P:\200S..Q359\DlAMOND DR. MASTER PLAN\Ol\REPORTIDlAMONODR-MASTERDOC Bucher, Willis & Ratliff Corporation -18 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas 4.11 Sanitary Sewer Service - Phase II The concept for Phase II is as follows. Lateral B and Lateral C will be constructed as the site develops to the north of Diamond Dri ve. Due to the age, physical condition, and to relieve both Pump Station No. 28 and No. 29, Pump Station No. 30 should be replaced as a part of Phase II. As flows begin to increase from the development area, Pump Station No. 28 will become overloaded first. As the capacity of Pump Station No. 28 nears, the 8-inch force main from Pump Station No. 30 should be intercepted just prior to entering Pump Station 29 and extended southward to the manhole located at Ninth and Otis Avenue as illustrated in Figure 8. A 12-inch gravity sewer line exists at this location. Careful monitoring of this 12-inch line is recommended to ensure its capacity isn't exceeded as the pump stations are upgraded. Extending the force main as described would result in a continuous force main from Pump Station No. 30 to the identified manhole and would not require another Interstate 70 crossing. New 8-inch force main is recommended for the distance between the. proposed pump station and the Interstate 70 westbound off ramp. Reportedly, new force main was constructed under both ramps and the driving lanes as part of the recent I-70lNinth Street interchange improvements. Installation of new force main from the ramp northward to the pump station will essentially result in a new force main through a majority of the distance from Pump Station No. 30 to the discharge manhole. The load on Pump Stations No. 28 and No. 29 will be greatly reduced with the replacement of Pump Station No. 30 and rerouting of the force main as described. This may be particularly beneficial for Pump Station No. 28 as this station ultimately receives flow from Pump Station No.8 (Stimmel Road) and Pump Station No. 17 (North Ohio Street). Reducing the load on Pump Station No. 28 would allow for growth in the areas served by Stations No.8 and 17. It is anticipated that the area served by Station No. 17 may see considerable growth due to the potential development of the Ohio StreetJInterstate 70 interchange area. P,\2005.o359IDlAMOND DR. MASTER PlAN'D lIREPORTlDlAMONDDR-MASTER.DOC Bucher, Willis & Ratliff Corporation -19 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas 4.12 Cost Estimates- Phase I & Phase II Included below are the preliminary cost estimates for Phase I and Phase II. Sanitary Sewer System Improvements Cost Estimate (2005 Dollars) Estimated Description Quantitv .Unit Unit Price Extension Phase I Lateral A Mobilization 1 L.S. 8,000.00 $ 8,000.00 Construction Staking 1 L.S. 4,500.00 $ 4,500.00 Seeding 1 L.S. 1,000.00 $ 1,000.00 8-inch Sanitary Sewer 1200 L.F. 45.00 $ 54,000.00 Precast Concrete Manholes 3 Each 4,500.00 $ 13,500.00 Connection to Exist. Manhole 1 Each 500.00 $ 500.00 Construction Subtotal $ 81,500.00 25% Land Acquisition & Construction Continqencies $ 20,375.00 Total Probable Construction Costs $ 101,875.00 15% Enqineerinq, Administrative, Leqal, Etc. $ 15,281.25 Total Probable Phase I Costs $ 117,156.25 Phase II Laterals B & C, New 700 apm Pump Station Mobilization 1 L.S. 20,000.00 $ 20,000.00 Construction Stakinq 1 L.S. 6,000.00 $ 6,000.00 Seeding 1 L.S. 4,500.00 $ 4,500.00 8-inch Sanitary Sewer 200C L.F. 45.00 $ 90,000.00 Precast Concrete Manholes € Each 4,500.00 $ 36,000.00 Connection to Exist. Manhole ~ Each 500.00 $ 1,000.00 8-inch Force Main 600e L.F. 35.00 $ 210,000.00 Remove & Replace Surfacinq 60e S.Y. 50.00 $ 30,000.00 Remove & Replace Curb & Gutter 5e L.F. 25.00 $ 1,250.00 700 gpm Submersible Pump Station - Complete 1 L.S. 150,000.00 $ 150,000.00 Construction Subtotal $ 548,750.00 25% Land Acquisition & Construction Continoencies $ 137,187.50 Total Probable Construction Costs $ 685,937.50 15% Engineerinq, Administrative, Legal, Etc. $ 102,890.63 Total Probable Phase II Costs $ 788,828.13 P:\200S.03S9\DlAMOND DR. MASTER PLAN\OI\REPORnDIAMONDDR-MASTER.DOc Bucher, Willis & Ratliff Corporation- 20 I I I I I I I I I I I I I I I I I I I DIAMOND DRIVE MASTER PLAN City of Salina, Kansas APPENDIX A: FIGURES Figure 1 - General Site & Drainage Layout Figure 2 - Proposed Water Line Improvements Figure 3 - Sub-Areas Figure 4 - Existing Sanitary Sewer System Figure 5 - Existing Sanitary Sewers Figure 6 - Proposed Sewer Collection System Figure 7 - Pump Station Locations Figure 8 - Sanitary Sewer Service Phase II Schematic Bucher, Willis & Ratliff Corporation - Appendix A r--' 1_____ l_____ ,.----- L--_.... -- , , I..... __._' - _-.J c:-1 :--:J :::::i ~-] :J Phase $906,414 ",~G~~~~~J~"':;P~V"o;"''''~~F' " '. . '!l' ,.. . . ........ I' .; ~ · L '1'/' "It , -J~>:i'l J" I .: I, ' -,'-r.::;p.;tt' J ~} " I It.- \~ ~ I "~''I' f ;;;~', !j. '; I -l ." . . 1.1' '~J ./... ',~ J, 11 ~ :1 II _ ,:!:1" ':...J~ ~ f ~~ -~r' ~ I, i' ';;fA .~ ' ._'~~ "J ;;/IJ " I.J Il= ,... '- I~Tili~r~'n...,,~~-m!i -r-(l:;iJ" t \t\i~ i; - - If' _ __ I 'I ~,:' " ~~ ii I ,J l .t t, · IV .'i!# " " - , .. , ~ .;,' .#If - ~ .' , . 11 '~,Ii'''' R t "--,' ..j\~~ -I ~ ilO "".. _ _-v ...,.............. ~ ;;,. ,f{y,'~ '---.1!~1l - - '.~~~ ...,~~11'tJ.;11Ii ~.,l ~~"'"~ _ ~ .........Qlt 1, . -...;;; ~. ........ ~~ ... 'av.". . . ..., f~' - 'U1 J).. ,. · ' ki' ! ~ ',.. a' . '1 . l"'~' l[~.' ,~ ~;.,. LI ~... I 1 . ~ c.",...~ce - - j:. ,I. 0- ~. ,~.~ 60 I o 350 I Scale: 1" ~ 350' - .. ..~,- .'1 Figure 1 Streets and Drainage Phase I ..... BUCHER, WilLIS & RATLIFF CORPORATION 609 WEST NORTH STREET SAUNA. KANSAS 67401 785-827-3603 - - - - - - - - - - - - - - - - - - - Phase Phase II $269,900 $165,500 ,",,..,,.,._'~'l!II,,,,,,,,, II " ~, . I ~ '~""'''~ 1~ ., l '- I }~ IjJ, ", ., ; . I' .. .I ij J ",./t . 1'-" ~ . ~Jl'" I' i, 't;, '1.1 iJi~"'lr " ~... '....-.--. .. ~"1 " !:,. "i' ,...... . ,.,'t'!lh.t' ...~ .,. ",' 1Iot.(, ~.... 'l<' iiW .. .. ". r"jj: Jilt ~ 1~"JT---- "---:- ..~ ~m_~~.~l~ " "" iIlIill ..,ti"t"'f'"Q;'" - \1 ~~. .....,".. ,> '1 .. ... ..., -J -~...~- 'Ii ~ "\ I 1 ~."... ~.' :00. ""\ ~ '" "'1t'.J ..,........J. .-1 f, .. ,; \r, '" a i " ,- t .,};., Ii r ., "., , ~ ,,,,4'''- I!O . t' 6" ' ... /1 ~ h:"I:.XIS 109 'I t/~ Water line tip " - ~f ,ti;l j , .,,;.ii '", ~ It '\, ..... ""'.. y. CD .'" olt. ..,,~ -);'., . ... t ~j J.,;: :1 '1 dLt_ I :; , " -~.-<jo- ~) I: " ~ ~,~.;~,......~~~~ ~ - ... ;{rlj .. ... - - ----- Phase I Figure 3 Proposed Water 60 ----- Phase ][ Line Improvements 0 350 I I Scale: 1" = 350' ----- Existing Water ....... BUCHER, WilLIS & RATLIFF ..,.,.~ CORPORATION 609 WFSI' NORTH STREBT SALINA, KANSAS 67401 78';"827-3603 - - - - - - - - - - - - - - - - - - - ~:.-,J~~l_,,_ . '" ~.______.~~2,J~~O~~~'~~"-:":.J':~t. ...,."",, , " " I ..... '!'I'i.~ If' ~?1- , ~ ~~""'ij,w ~ ,.4; ~ ~"....~~. '''r.. \ ! :~i:: 11." . , '., J.A't"" I' ;:~ I~ fi.'''~:tjf~~ d L~ .- ',t\ i{ ~~j;'~' \. ,.,... ..,. I .. ~ ~... ...,..i5:- ... .... ... ..., . ~.-: m .lli.., _ ~ ..., ~ 'f E~" '~'"!l''''''''' ~?;ly,~...' ~I~'~ \~h ~'." ~r ~ 4.~" Af; ," , ,l.: ^ 'It ~" ", ., !l....r.: ''''>;.1 . ". ~" ~,' . JJ : 1 , I CD --- ~"" ~ .. .-- " ., "t"!": \'1:'"1- - ; ~":" ~y>~ ~ ~ '=' .;; ... '~'r:=.::.. ~ .'I'f,* II .. ~ -l '....~ ..... ~~ r.t t, ,. .. ..,....~dI'II\" ,.;,;;0.00 ,. 1- +~Br ~ 60 I o 350 I Figure 4 Sub-Areas Scale: 1" = 350' ....... BUCHER, WilLIS & RATLIFF ..,.,.... CORPORATION 609 WEST NORTIJ 5I'REBT SALINA. KANSAS 61401 785-827.3603 -f Pleasant Hill Road Existing 8. Une I I ")/ Ll,L--- '"""' , ~/ ,I ,f I " . " " I " I , " l J I .#-......... I' ..~ i " ~ I \ ~ ~, ''\ I N \ \.,.,\ ).. ...... \.,\ ">"~"""'" " ... " \. .... "1\ \ " "'j ". "1 ., \, \ ..,\, .)\ 6er&RoD \, \ Existing 10. Une I I I I I I I l I I '. ....-.....-.. l-hnl , I ", 1 .---- ---.... ---- 1- (-- '\ 1---- . N ._-~----\ \ ~-~~-)- ~-"T----r- ~~~:g 5 Sanitary Sewer System . BuaUR WIllIS,. RATUFF I CbnPO~T1ON ~ kNfSt.S 87401 113-827-3803 ... ll!S1' HOR1lI S'IllEET .......... ........ t Area Boundary - Developmen I I I I I I I I I I I II I I II ! I I I I I I I I ' I Pleasant Hill Road . -.-.-t.-.---.---. -.-.-.-.---.---.-.-------c;;-. .:- ---:'~7-- I I 6~ i ~ I , I I 0 I ! I I I I I I I I , Existing 8-inch Sewer o ~ <\I. Existing lO-inch Sewer .... Q) ~ .... CIl .c .... = Z o - o o v North (From City of Salina Sanitary Sewer Maps) ~ C) > . =(1) 't , MONARCH td J78.tti ad WI- 0111 TATE DlSTRI CT ) ~ . I ! Q: :5 1 'i ~ 2 .. I I tl I I ;; I I "79,17' I & It' I 'I Ro. " td Q "0 g FIGURE 6 I . 0 N EXISTING SANITARY SEWERS 1.111.. BUCHER, WilLIS & RATLIFF ....,...... CORPORA TIO N ENGINEERS . PLANNERS I ARCHITECTS .. .-. . . o - .. ~ ;' , i i i ------------------- Phase I Phase II $117,200 $788,800 lL,,~ jl\...~U1 .__~:__-~,~~~~1 ;1 . ~j ...1 . I....-;,Jj ..l.1. ~ 1M '..a I . ~ . ~'!' ",'- ,i ~,~ 1 V ""~l ... rl ~.~ I.. }~' "..-, ,,,~ml ..Jill {1ft" '01 ~ . ,...,.J ',. ;1;~ ,['.i~~ 1ft:; ;b..!p' ...... y -'" '\.~ '1 .. ~ J\. . , .., !t.\" , ~., M " I' 'I - ~ -,; II :;;, . '~j], '71; ...h tJM1_ .,. I I ;;J ff~ CD ( ~, .. .. .., jio-, =,;:;."1"...".....~- ;;.; _....- ;;. - !~ ~ - .... Phase I Figure 7 Proposed Sewer Collection System 60 L- o 350 -, Phase ]I Scale: 1" = 350' ....... BUCHER, WILLIS & RATLIFF ..,.,.~ CORPORATION 609 WPSI' NORTIl STREET SALINA, KANSAS 67401 785-827.3603 -- r-- ! - - z CD ~ ""0 c 3 "'0 (f) ,.... o ,.... o' ~""O::!1 ~5~ "'T'J1II.... OCDCD ~=CXl CD s::: o ~ :::0 CD o () o ,.... o' ~ - t. , N - - - - - - - - - - - -- ::: ~""O '-J :r CXlO COlli 'CnCll 0= o 3 "'0 .... o < CD 3 CD ~ ...... 1II - - - - ....... BUCHER, WilLIS & RATLIFF ....J.~ CORPORATION 609 WESI' NOR11-l STREET SALINA. KANSAS 67-401 785-8Z7-3603