2592 Selecting Paving Material__ORDINAiTOE_I\TO._2.59
l Atah1 i ,Tied in The Salina Evening Journal
0
133
An ordinance specifying and selecting the paving material to be
used and letting a contract for the excavating, grading
and paving of certain streets in the City of Salina,
Kansas.
BE IT ORDAINED by the Board of Commissioners of the City of
j
Salina,, Kansas:
Section 1. That it is hereby.determined that ELM
STREET in the City of Salina, Kansas from the east line of Third
Street to the west line of Front Street in said City, shall be
pave with one course vitrified vertical fiber side wire cut brick
paving blocks not less than three (3) inches deep with asphalt
filler, laid on a foundation five (5) inches in depth of Portland
Cement Concrete base with one (1) inch sand cushion, such pave-
ment within the limits above defined to be forty-one (41) feet in
width from gutter to gutter.
Section 2. All excavating,, filling and rolling necessary
for the groper construction of such improvements shall be done
and all of such improvements shall be made and done in strict con-
formity to and in compliance with the plans and.specifications
heretofore made by the City Engineer of Salina, Kansas and now on
file with the City Clerk of said. City, which said plans and spe-
cifications are hereby incorporated in and made a part hereof in
all respects as fully and completely as though written out at
length herein; which plans and specifications are hereby adopted
as and for the plans and specifications of such work and improve-
ments.
Section 3. That a contract is hereby awarded to G. M.
Smith and Mat Graham, Jre, co-partners doing; business under the
firm name and style of The Smith -Graham Construction Company, for
the paving, excavating, and filling the above mentioned streets in
the limits aforesaid with the materials hereinbefore specified,
for the paving actually laid and put in place, for the labor
'
actually performed and the material actually furnished at the
following prices: For excavating and {trading Eighty (00) cents
per cubic yard; for paving actually laid and put in place Three
and 22/100 Dollars ($'3.22.) per square yard. All of said work
shall be paid for according to the measurement made by the City
Engineer of the City of Salina. It is hereby determined and
found that the prices to be paid for the improvements as afore-
said is less than the estimated prices of each and of said im-
provements as not; on file with the City Clerk of the City of
mSalina,
Kansas.
Section 4. Such contract is awarded upon the express
condition that such work and improvements shall be done in strict
accordance with and in compliance with the plans and specifica-
tions of the City Engineer therefor, which plans and specifica-
tions are hereby made a part of this ordinance and of the contract
awarded', and upon further conditions among others that the persons
to whom said contract is awarded shall furnish to the City of
Salina a surety bond in the approximate sum of the cost of such
improvements guaranteeing the prompt, proper and workmanlike con-
struction of all the same together with a surety company bond
guaranteeing; such pavement against all defects in material and
workmanship for a period of five (5) years from the date of its
completion and. acceptance by said City and said contract is
awarded upon a further condition that said persons shall furnish
a good and sufficient surety company bond running to the State of
Kansas in an amount approximately equal to the contract price of
said improvements and conditioned that said persons shall pay all
indebtedness for labor and material furnished in making the im-
provements for herein.
Section 5. The Board of Commissioners of the City of
Salina are hereby authorized to make and enter into on behalf of
said City all written agreements necessary in order to secure
the construction of the i-rwprovements herein provided for.
Section 6. This ordinance shall take effect and be in
full force from and after its publication once in the official
City paper.
(SEAL)
Attest:
Introduced for first reading, September 5th, 1922.
Passed and approved .......... Septemberllth, 1922.
Chas. E. Banker
City Clerk.
P.1 S. I:
Mayor.
1
1
1
1
J
1
1
STATE OF KANSAS )
SS
COUNTY OF SALINE )
I, Chas. E. Banker, City Clerk of the City of Salina,
Kansas, do' hereby certify that the above and foregoing is a
true and correct copy of Ordinance Number 2592 passed by the
Board of Commissioners and approved by the Mayor of the City
of Salina, Kansas, September 11th, 1922; a record of the vote
on its final adoption is found on Page 9/, of Journal No. lo..
Said Ordinance eras published in The Salina Evening Journal
September § , 1922.
ki
1.3.1-5.
(Published in The Salina Evening Journal�1922)
ORDI NAN CE No. . - _
An Ordinance specifying and selecting the paving material to be used and
letting a contract for the excavating, grading and paving of cer-
tain streets in the City of Salina, Kansas.
BE IT. ORDAINED by the Board of Commissioners of the City of Salina, Kansas;
Section 1. That it is hereby determined that ELMSTREET in the
City of Salina, Kansas from the east line of Third Street to the west
line- of Front Street in said City, shall be paved with one course
vitrified vertical fiber side wire out brick paving blocks not lest.,
than three (3) inches deep with asphalt filler, laid on a foundation five
(5) inches in depth of Portland Cement Concrete base with one (1) inch
sand cushion, such pavement within the limits above defined to be
forty-one (41) feet in width from gutter to gutter.
Section 2. All excavating, filling and rolling necessary for the
proper construction of such, improvements shall be done and all of such
improvements shall be made and done in strict conformity to and in com-
pliance with the plans and specifications heretofore made by the City
Engineer of Salina., Kansas and now on. file with the City Clerk of said City,
which said plans and specifications are hereby inecrporated in and made
a part hereof in all respects as fully and completely as though written
out at length herein; which -plans and specifications are hereby adopted.
as and for the plans and specifications of such work and improvements.
Section 3. - That a contract is hereby awarded to G. M. Smith and
Mat Graham, Jr., co-partners doing business under the firm. name and -style
of The Smith Graham Construction Company, for the paving, excavating and
filling the above mentioned streets in the limits afores _yid with the
materials hereinbefore specified, for the wing: actually laid and put in
place, for the labor actually performed and the material actually furnished
at the following �pri ces : For excavating and grading Eighty (80) cents,
per cubic yard; for paving actually laid and put in place Three and 22/100
Dollars ($3.22) 'per square yard. All of said work shall be paid for
according to the measurement made by the City Engineer of the City of Salina
It is hereby
determined and
found
that
the
prices to
be • paid for the
improvements
as aforesaid' is
less
than
the
estimated
prices. of each and all
of said improvements as now on file with the City Clerk of the City of
Salina, Kansas.
Section 4. Such contract is awardedupon the express condition that
such work and improvements shall be done in strict accordance with and in
compliance with the plans and specifications of the City Engineer therefor,
which plans and specifications are hereby made a part of this ordinance
and of the contract awarded, and upon further conditions among others;
that, the persons to vLom said contract is awarded shall furnish to the
City of Salina a surety bond in the approximate- sum of the cost of such
improvements guaranteeing the prompt, proper and workmanlike construction
of all the same together with a .surety company bond guaranteeing such
pavement against all defects in material and workmanship for a period
of five (5) years from the date of iiOls completion and acceptance by said
City and said contract is awarded upon a- further condition that said+
persons shall furnish a good and ,sufficient surety company bond running to
the Stat e of Kansas in an amount 4pproximately equal to the contract price
of said improvements and conditioned that said persons shall pay all indeb-
tedness for labor and material furnished in making.the improvements provi-
ded for herein.
Section 4t.0,0, The Board of Commissionersof the City of Salina are here-
by authorized to maim and enter into on behalf of said City 0,11 written
agreements necessary in order to secure the construction of the improve-
ments herein .p�r�o, v ided for.
Sectionl., This ordinance shall take effect and be in full force
from"and after its publication once in the official City paper.
Introduced for first reading, , 1922.
Passed and approved.........9 , 1922.
Attest: r
City -Clerk