2591 Selecting Paving Material1301f
�r
(Published in The Salin
An ordinance specifying and selecting the paving i-inaterial to be
used and letting a contract for the jets
aving, excavating,
curbing and guttering of certain stn in the City of
Salina, Kansas.
BE IT ORDAiTvED by the . Board of Commissioners f the City of
Salina, Kansas:
Section 1. That it is hereby determined that ELEVENTH
STREET in. said. City from the north line, of Iron Avenue to the
south line of State Street therein, shall be aved with one course
ire
,paving blocks not
vitrified vertical fiber side mcut bric��av
less 'than three (3) inches deep, with asphalt filler, laid on a
foundation five (5) inches in depth of Portland Cement Concrete
base with one (1) inch. sand cushion, such pav {hent within the
limits above defined to be twenty-eight (28) leet in width from
gutter to gutter.
Section 2. That it is hereby determined that ELEVENTH
STREET in said City from the north line of iron Avenue to the
South line of State Street, therein, shall be, curbed and gutter-
ed with one piece combination cement curb and gutter. Said
combined curb and gutter shall be comprised If a curb six (6 )
inches thick at the throat, with. gutter tvienty-four ('24) inches
wide, six (6) inches thick at the throat and seven (7) inches
thick next to the pavement.
Section 3. All excavating„ filli g and. rolling necessary
construction of such improv ; c 'm rov meats shall be done and
for she proper cons
all of'such improvements shall be made and done in strict conform-
ity to and in compliance with the plans an Epecifications here-
tofore made by the City Engineer of Salina, Kansas and now on
file with the City Clerk of said City, ch said plans and speci-
fications are hereby incorporated in and mid. a part hereof in all
tely as though written out at length
respects as fully and comple
herein; which plans and specifications are h�reby adopted as and
for the plans and specifications of such work and improvements:
Section 4. That a contract is her y ayaarded to G. M.
Smith and Mat Graham, Jr.,.co-partners doing business under the
firm name and style of The Smith -Graham Cons ,ruction Company, for
the paving, curbing, guttering, excavating a. d filling the above
mentioned streets in the limits aforesaid vii h the materials
hereinbefore specified9 for the paving actua�ly laid and put in
place for the labor actually performed and tjie materials actually
furnished at the follo 'ing prices: For ex,ca acing and grading
eighty cents (80�) per cubic yard; ,for Por tlo.nd Cement Concrete
combined curb and gutter eighty-five cents (i85�) per lineal foot;
1
1
I-
I
N
1
1
1
1
1
for paving actually laid and put in place. Three and 22/100
Dollars (��3.22) per square yard. All of said vrork shall be paid
for according to the measurement made by the City Engineer of
the City of Salina. It is hereby determined and found that the
prices to be paid for the improve;nent as aforesaid is less than
the estimated prices of each and all of said improvements as now
on file with the City Clerk of the City of Salina, Kansas.
Section 5. Such contract is awarded upon the express
condition that such work and improvements shall be done in strict
accordance with and in compliance with the plans and specifica-
tions of the City Engineer therefor, which plans and specifica-
tions are hereby made a part of this ordinance and of the
contract awarded, and upon further conditions among others that
the persons to whom said contract is awarded shall furnish to
the City of Salina a surety company bond in the approximate sum
of
the cost of
such improvements
guaranteeing
the prompt,
proper
and
workmanlike
construction of
all
the same
together with
a
surety company bond guaranteeing such pavement against all defects
in material and workmanship for a period of five (5) years from
the date of its completion and acceptance by said City; and said
contract is a -warded upon a further condition that said persons
shall furnish the City of Salina a good and sufficient surety
company bond guaranteeing said curb and gutter against all defects
in material and. workmanship for a period of two (2) wears from the
date of its completion and acceptance of such work by the City;
together with a good and sufficient surety company bond running
to the State of Kansas in an amount approximately equal to the
contract price of said improvements and conditioned that said
persons shall pay all indebtedness.for labor and material furnish-
ed in making the improvements provided for herein.
Section 5. The Board of Co?mnissioners of the City of
Salina are hereby authorized to make and enter into on behalf of
said City. all written agreements necessary in order to secure the
construction of the improvements herein provided for.
Section 7. This ordinance shall take effect and be in
full,force from and after its publication once in the official
City paper.
Introduced for first reading, September 5th, 1922.
Passed and approved ........, Septemberllth, 1922.
F. S. Dyar,
(SEAL) � Mayor.
Attest: Chas. E.T�an1�Pr �; tv c l e ��r_
STATE OF KANSAS )
SS
COUN'T'Y OF SALINE )
I. Chas. E. Banker, City
Clllerk of .
th
City of Salina,
Kansas do hereby certify that the
'above an�
IQVW1
oregoing is a
true and correct copy of Ordinance
mber_
2591
passed by.: the
Board of Commissioners and approved''
by the
Iiia
or of the City
of Salina, Kansas, September 11th,
II
1922; a
e
ord of the vote
on its final adoption is found on
Page
f
Journal . No. 10.
Ev
Said Ordinance was published In I h
.'a �a
e� S l�z
ni Journal
ng
September 1922.
CON s
•
(Published in The Salina Evening Journal,
�.1
ORDINANCE NO. �r
An Ordinance specifying and 'selectingthe paving material to be used and
letting a contract for the paving, excavating, curbing and guttering
of certain streets in the City of Salina, Kansas.
BE IT ORDAINED by the Board of Commissioners o f the City of Salina, Kansass-
Section 1. That it is hereby determined that ELEVENTH STREET in said
City from the north line of Iron Avenue to the southline of State Street
therein, small be paved with one course vitrified vertical fiber side.wire
cut brick paving blocks not less than three (3) inches deep, with asphalt
filler, 'laid" on a foundation five (5)" inches In depth of Portland Cement
Concrete base with one (1) inch sand cushion, such pavement within the
limits above defined to be twenty-eight (28) feet in width from gutter to
gutter.
Section 2. That it is hereby determined that ELEVENTH STREET in said
City from the north line of Iron Avenue to the South line of State Street,
therein, shall be curbed and guttered with one piece combination cement curb
and gutter. Said combined curb and gutter shall be comprised of a curb six
(6) inches thick at the throat, with gutter twenty-four (24) inches wide
six (6) inches thick at the throat and seven (7) inches thick next to
the pavement.
Section 3. All excavating, filling and rolling necessary for the
proper construction of such improvements shall be done and all of such
improvements shall be made and done in strict conformity to and in com-
pliance with the p ns and, specifications heretofore made by the City
Engineer of Salina, Kansas and now on file with the City Clerk of said City,
which sa id plans and specifications are hereby incorporated in and made
a part hereof in all respects as fully and completely as though'written
out at length herein; which plans and specifications are hereby adopted
as and for the plans and specifications of such work and improvements.
s
Section 4.
That a, contract
is hereby
awarded to.
G. M- Smith and
Mat Grahah, Jr.$
co-partners doing
business
under the
firm name and style
of The Smith -Graham Construction Company., for the paving, curbing, gutter-
ing, excavating and filling the above mentioned streets in the limits
aforesaid with the materials hereinbefore specified., for the paving actually
laid and put in place for the labor actually performed and the materials
actually furnished at the. following prices: For excavating and grading
eighty cents (80�) per cubic yard; for Portland Cement Concrete combined
curb and gutter eighty-five cents '(85¢) per lineal foo ; for paving actually
laid and put in place Three and 22/100 Dollars ($3.22) per square yard.
All of . said work shall be paid for according to the measurement made by
the City Engineer of the City of Salina: It is , hereby determined and found
that the prices to be paid for the improvement as aforesaid is less than
the estimated prices of each and all of said improvements as now on file with
the City Clerk of .the City of Salina, Kansas.,
Section 5. Such contract is awarded upon the express condition that
such work and, improvements shall be drone in strict accordance with and in
compliance with.the plans and specifications of the City Engineer therefor'
which plans and specifications are hereby made a part of this ordinance ' and
of the 'contract •awarded, and upon further conditions among others that
the persons to whom said contract is awarded shall furnish to the City of
Salina a surety company bond in the approximate sum of .the cost of such
improvements guaranteeing the prompt, proper and worIznanlike construction
of all the 'same together with a surety company bond guaranteeing such
pavement against all defects in material and workmanship for a period of
five (5) years from the date of its completion and acceptance by said City;
and said contract is awarded upon a further condition that said persons
shall furnish the City of Salina a good and sufficient surety company bond
guaranteeing said curb and gutter against all defects in material and work-
manship fora period of two '(2) years from the date of it(4 completion
and acceptance of such work by the City; together with a good and suffic-
ient surety canpany bond running to the State of Kansasin un amount
r
approximately equal to the contract price of said improvements and con-
ditioned that said persons shall pay'all indebtedness for labor and
material furnished -in making the improvements provided for herein.
Section 6. The Board of Commissioners of the City of Salina are
hereby authorized to make and enter into on behalf of said City all written
agreements necessary in order to secure the construction of the improve -
I,
ments herein provided for.
Section 7. This ordinance shall take effect and be in full force
from and after itis -Mblieation once in the official City paper.
Introduced for first reading, , 19220
Passed and approved ........�� , 1922.
P o
Attest:
�City Clerk.