2494 Selecting Paving MaterialORDINANCE NUT:f!BE R 2494
An Ordinance specifying and selecting the paving material
to be used and letting a contract for the paving,
excavating, curbing and guttering of certain streets
in the City of Salina,Kans.as.
BE IT ORDAINED by the Board of Commis s ion c::r s of the City of
Salina, Ksns.as :
Section 1. That it is hereby determined that Crawford
Avenue in the City of Salina, Kansas from the west line of
Fifth Street to the east line of Santa Fe Avenue in said City,
shall be paved with one course vitrified vertical fibre side
wire cut brick paving blocks not less than three (3) inches
deep, with a Texaco Asphalt Filler or filler equally as good,
laid on a foundation five (5) inches in depth of Portland
Cement Concrete base with one (1) inch Sand Cushion, such pave-
ment within the limits above defined to be thirty-three (25,3)
feet,in width from gutter to gutter.
Section 2. That it 'is hereby determined that Crawford
Avenue in the City of Salina, Kansas, from the west line of
0
Fifth Street to the east .line of Santa Fe Avenue in said City
shall be curbed and guttered with one cpiece combination cement
e
curb and gutter. Said combined curb and gutter shall be com-
prised of a curb sic (6) inches thick at the top and six and
one-half (62) inches thick at the throat, with gutter twenty-
four (24) inches wide, six (6) inches thick at the throat and
seven (7) inches thick next to the pavement.
Section 3. All excavat-i ng, filling and rolling necessary
for the proper construction of such improvements shall be done
and all of such improvements shall be made and done in strict.
conformity to and in compliance with the. plans and specifica-
tions heretofore rade by the City Engineer of Salina, dans as,
and now on file with the City Clerk of said City, which said
plans and specifications are hereby incorporated in and made a
part hereof in all respects as fully and completely as though
written out at length herein; which plans and specifications
are hereby adopted as and for the plans and specifications of
such work and improvements.
Section 4. That a contract is hereby awarded to G.1j.
Smith and Mat Graham, Jr., co-pattners doing business under the
1
1
1
1
1
1
firm name and style of The Smith=Graham Construction Com-
pany, for the paving, curbing, guttering, excavating and
filling of the above mentioned streets in the limits afore-
said with the materials hereinbefore specified, for the
paving actually -laid and put in place and for the labor ac-
tually performed and the materials ,_ctually furnished at the
following. prices: for excavating and grading seventy-two (72�)
cents per cubic yard; for Portland Cement Concrete bombined
curb and gutter eighty-two cents (82¢) per lineal foot; for
paving actually laid and put in place Three and 23/100 Dol-
lars ($3.23) per square yard. All of said work shall be paid
for according to the measurement made by the City Engineer of
the City of Salina; It is hereby determined and found .that
the prices to be paid for the improvements as aforesaid is less
than the estimated prices of each and all of said improve-
ments as now on file with the City Clerk of the City of Salina,
Kansas.
Section 5. Such contract is awarded upon the express con-
dition that such work and improvements shall be done in strict
accordance with and in compliance.with the plans and speci-
fic.ctions of the City Engineer therefor, which plans and spec-
ifications are hereby made a part of this ordinance and of the
contract awarded, and upon further conditions among others
that the'persons to whom said contract is awarded shall fur-
nish to the City of Salina 'a surety Company bond in the ap-
proximate sum of the cost of such improvements guaranteeing
the prompt, proper
and workmanlike
construction of all
the
same together with
a surety company
bond guaranteeing
such
pavement against all defects in materials and workmanship for
a period of five (5) years from the date of its completion and
acceptance by said City; and saideontract is awarded upon a
further condition that. said persons shall furnish the City of
Salina a good and sufficient, surety company bond guaranteeing
said curb and gutter against all defects in material and work-
manship for a
period of two
(2) years from
the. date
of its
completion and
acceptance of
such work by
said .City;
together
Iwith a good and 'sufficient surety company bond running to the
state of Kansas in an amount approximately equal to the con-
tract price of said improvements and conditioned that said per-
sons shall pay all indebtedness for labor and material furnish-
ed in making the improvements provided for herein.
Section 6. The Board of Commissioners of the City of Salina
are hereby authorized to make and enter into on behalf of said
City all written agreements necessary in order to secure the
construction of
the
improvements herein provided
for.
Section 7
This
ordinance shall take effect
and be in full
force from and
after
its publication once in the
official City
paper.,
Introduced for first reading April 24th, 1922.
Passed and approved . . . .. .May lst, 1922.
F.S. Dyar
- Mayor.
(SEAL)
Attest:
Ch:_s . E. Banker
City Ulerk.
STATE OF KANSAS )
SS
COUNTY OF SALINE )
I. Chas. E. Banker, City Clerk of the City of Salina,
Kansas, do hereby certify that the above and. foregoing is a
;true and correct copy of Ordinance No. 2494, passed by the
Board of . Coircrlissi oners and approved by the Mayor of the City
of Salina Kansas, May 1, 1922; and a record of the vote on
its final adoption is found on Page of Journal No. 10.
Said Ordinance was published. in The Salina Evening Journal
1922.
City Cler
1�1
1
1
1
(Published in The Salina Evening Journal l 1922)
ORDINANCE NO. --2494
An Ordinance specifying and.selecting the paving -material t*o be
used and letting a contract for the paving, excavating,
curbing and guttering of certain streets in the City of
Salina,'Kansas.
BE IT ORDAINED by the Board of Commissioners of the .City' of
Salina, Kansas:
Section 1. That it is hereby determined that Crawford
Avenue in the City of Salina, Kansas from the west line of
Fifth Street to the east line of Santa Fe,Avenue in said City,
shall be paved with one course .vitrified vertical fiber side
wire cut brick paving blocks not less than three (3) inches
deep, with a Texaco Asphalt Filler or filler equally as good,
laid on -a foundation five (5) inches in depth of Portland Cement
Concrete base with one (1) inch Sand Cushion, such pavement with-
in the limits above defined to be thirty-three (33) feet in width
from gutter to gutter.
Section 2. That it ,is hereby determined that Crawford
Avenue in the City ,of Salina, .Kansas from the west line. of Fifth
Street to the east line of Santa Fe Avenue in said City', shall
be '.curbed and guttered with one pierce combination cement'eurb
and gutter. Said combined curb and gutter.shall be comprised
of a curb :six (6) inches thick at the top and,six and one-half,
(62) inches thick at the throat, with cxmjbj-4md gutter twenty-four
(24) inches wide, six (6) inches thick at the throat and seven
(7) inches thick next to the pavement.
Section 3. All excavating, filling and rolling necessary
for the proper construction of'such improvements shall be done
and all of such improvements'shall be made and done in strict con -
fortuity to and in compliance with the plans .and specifications
heretofore made by the City Engineer of Salina, Kansas and now
on file'with the City Clerk of said City, which said plans and
specifications are.hereby incorporated in and made.a part hereof
in all respects.as fully and completely as though written out
at length herein; which plans and specifications are hereby
adopted as .and .for the. plans and specifi,c.ations of such work
and improvements.
Section 4. That a contract is hereby awarded to G. M.
Smith and Mat Graham Jr., co-partners doing business under the
firm.name and style of The &mith-Graham Construction Company,
for the paving, curbing., guttering; excavating and filling`.of
the above mentioned streets in the limits aforesaid with the
materials hereinbefore specified, ,for the paving. actually laid.
.and put in place and .for the.labor actually performed and the
materials'actually furnished at the following.prices: for..exca-
vatin.g and grading seventy. -two cents (72�) per cubic yard; for
Portland Cement Concrete combined curb and gutter eighty-two
cents (82�) per lineal foot;for paving actually laid and put
in place Three and.23/100 Dollars ($3.23) per square yard. All
of..said work shall be paid for according to the measurement made
by the City Engineer of the 'City of Salina., Tt is ' hereby deter-
mined and found that the prices to be paid for the improvements
as aforesaid is less than.the estimated prices of each and all
of said improvements as.now on file with -the City Clerk of the
City of Salina, Kansas.
Section 5. Such contract is awarded upon the express con-
dition that such work and improvements shall be
done.:in strict
.accordance with and in compliance with the plans and'specifications
of the.City Engineer therefor, which plans and specifications are
hereby.made a part of this ordinance and of the contract awarded,
and upon further conditions among others that the persons to whom
said contract is awarded shall furnish to the City of Saliha a
surety company bond in the approximate sum of the cost of such
improvements guaranteeing the prompt, proper and workmanlike con-
struction of all.the same together with a surety company bond
guaranteeing.such pavement against all defects in material and
workmanship for a period of five. (5) years from'the date of its
eompletioninrand acceptance by said City; and said contract is award-
ed upon a further'eondition that said persons shall furnish the
City of Salina a good and sufficient surety company bond guaran-
teeing said curb and gutter against'all.defects in material and
workmanship ' fo.r. a period of two (2) years from the date of its
completion and. acceptance of such work by said City;•together with
a good and sufficient surety company bond.running to ,the.State.
of Kansas in an amount approximately equal to the contract price
of' -said improvements and conditioned that said persons shall pay
all indebtedness for labor and material furnished in making the
improvements provided for herein.
Section 6. The Board of Commissioners of the City of
Salina are hereby authorized to make and enter.into,on behalf
of said.City all written agreements necessary in order to secure
the construction of the improvements herein provided for.
Section 7. This ordinance shall take effect and be in
full force from and after its publication once in the official
City paper..
Introduced for first reading April 24th 1222
Passed and approved May ist, 1922
Attest:; .r yor