Loading...
8.6 Appr WWTP Filter Press Fac CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 4:00 P.M. 06/27/94 , AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR NO. 8 AGENDA: Water and Wastewater ITEM: NO. 6 BY: Don Hoff BY: Item Approval of the Wastewater Treatment Plant Filter Press Facility-Project! No. 94-900 and setting the date to receive bids. Back~round This project involves the construction of a two story masonry filter press building containing a filter press unit; chemical injection equipment; chemical storage; storage area for dewatered sludge; rehabilitation of three sludge drying beds; and associated electrical/mechanical equipment. Recent EPA and KDHE regulations significantly restrict the quantity of sludge that can be applied per acre to agricultural land. The volume of sludgelgenerated each year at our Wastewater Treatment Plant would require the City to have access to at least 600 acres of wheat land, for example, on a year round basis. More intensive farming practices, such as irrigation, and selection of crops which utilize more nitrogen than wheat reduces the acres needed each year but does not address the need to have fallow land available at all times for sludge application during the crop growing season or inclement weather. If all of the sludge cannot be applied to agricultural land for its fertilizer and soil conditioning properties, the sludge can also be used as a soil amendment material in site reclamation or as cover material at our landfill. However, to be used at landfills the sludge must be dewatered to approximately 20% solids (no free water) to minimize operational problems at the landfill. The proposed filter press unit is designed to exceed this dewatering criteria. Our liquid sludge prior to dewatering contains approximately 6% solids. Construction of this facility would allow the Wastewater Division to consistently process wastewater sludge during periods of inclement weather or when farmland is not available for land application. We are committed to maximizing the beneficial uses of our wastewater sludge. COMMISSION ACTION MOTION BY SECOND BY , THAT: CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 06/27/94 4:00 P.M. AGENDA SECTION: ORIGINATING DEPARTMENT: AP~PROVED FOR NO. AGENDA: Water and Wastewater NO. BY: Don Hoff BY: Recommendati on It is recommended the City Commission authorize the Wastewater Treatment Plant Filter Press Facility-Project No. 94-900, and set Tuesday, August 2, 199~1 as the date to receive bids. The preliminary construction cost of this facility is estimated at $1,000,000. It is anticipated funding sources for the filter press facility would include cash reserves and/or bond proceeds. COMMISSION AC~ION MOTION BY SECOND BY THAT: