Loading...
8.3 CO1 1995 Subdiv CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 11/13/95 4:00 P.M. AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR NO. 8 AGENDA: Engineering & Utilities iYEM NO. 3 BY: Shawn 0'Leary~ IT~ Change Order No. 1 for the 1995 Subdivision Improvement Project No. 95-938. BACKGROUND The attached Change Order No. 1 includes water and sanitary sewer system relocations at the proposed Magnolia/I-135 Interchange project. These utility relocations are one of the final items to complete for the interchange project prior to the December il, 1995 deadline established by the Kansas Department of Transportation. It has been determined by staff that this negotiated change order on an existing utility contract is the most expediant and cost- effective method of completing this essential project. The total cost of Change Order No. 1 is $13,645. The contractor, Stevens Contractors, Inc. has committed to completing the work in 20 calendar days. The source of funds for this change order is the Magnolia/I-135 Interchange project account, the budget for which included contingency amounts for this type of utility relOcation. RECOMMENDATION It is recommended that the City Commission approve Change Order No. 1 on the 1995 Subdivision Improvements Project No. 95-938 in the amount of $13,645. CHANGE ORDER LOCATION: MAGNOLIA/I-135 INTERCHANGE PROJECT NO. 95-938 PROJECT: 1995 SUBDIVISION IMPROVE~RNT$ CHANGE ORDER NO. ONE (1) CONTRACTOR: STEVENS CONTRACTORS,INC,, P. 0. BOX 6197, SALINA. KS 674Q2 THIS AGREEMENT, made and entered into this 6th day of November , 1995 , by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated October 9. 1995, under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated September - 1~9~ , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. I~m No. Description 21 Add relocation of existing "6" Water Pipeline" to revised right-of-way line for Magnolia/I-135 Interchange, 850 linear feet. 23 Add "Water Pipeline Fittings" for the relocation of 6" Water Pipeline at Magnolia/I-135 Interchange, 0.43 Ton. 40 Add installation of "Special Type I Manhole" for the relocation of .existing sewer system at Magnolia/I-135 Interchange, one (1) each. 64 Increase "Water" needed for pipeline installation, one (1) lump sum. 65 Increase "Construction Staking" for pipeline installation, one (1) lump sum. 67 Add "Relocation of existing Fire Hydrant, one (1) each. 68 Add "Removal of existing Fire Hydrant, one (1) each. 69 Add "8" Sewer Plug", one (1) each. CHANGE ORDER PAGE 2 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices: ITEM UNIT NO ~ DESCRIPTION 0UANTITY UNIT PRICE TOTAL 21 6" Water Pipeline 850 L.F.$ 11.00 $ 9.350.00 23 Water Pipeline Fittings 0.43 Ton 4.000.00 1. 720, 40 Type I Manhole, Special i EA. 1,500.00 1.500,O0 64 Water 1 L.S. 50.00 50 65 Construction Staking I L.S. 425.00 42§. 00 67 Relocate Existing Fire Hydrant i EA. 300.00 300.00 68 Remove Existing Fire Hydrant I EA. 200.00 200.00 69 8" Sewer Plug i EA. ] 00.00 , ] 00.00 CHANGE ORDER TOTAL: $ ]3~645.00 3. Additional time for completion by reason of this change ,20 days. 4. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND PARTY THE CITY OF SALINA, KANSAS STEVENS CONTRACTORS, INC. BY: BY: ~ MAYOR ~'/~ (Office or position 'of signer) Attest: CITY CLERK