Loading...
8.4 CO1 Eastgate Add CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 9/11/95 4:00 P.M. AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR NO. 8 Engineering & Utilities AGENDA: ITEM Shawn O'Lear BY: BY:, ITEM Change Order No. i for the Eastgate Addition Drainage Improvements, Project No. 95-937. BACKGROUND The project involves the improvement of the existing storm drainage system located in the Eastgate Addition. The original design included two major parts, (1) improved grading and alignment of the drainage channel from the northeast corner of the subdivision to the outfall structure under the flood control levee and (2) increased capacity of the detention basin, particularly at lower elevations than the street. During recent flooding periods, one clear message has been heard from the property owners in Eastgate Addition. That statement was, "before the existing drainage channel on the east and south boundaries of Eastgate can be adequately maintained, the ditch must be regraded to it's original cross section". To this end, Change Order No. 1 has been negotiated with Frank Construction to provide that additional grading and seeding in the existing drainage channel. This additional work will provide excellent closure to the drainage improvements in Eastgate. The original contract amount is $48,600. The total amount of Change Order No. i is $7,320 or a 15 percent increase in the contract. This project is funded through the 1995 Capital Improvement Program. RECOMMENDATION It is reco~£~fLended that the City Commission approve Change Order No. i for the Eastgate Addition Drainage Improvements, Project No. 95- 937, in the amount of $7,320.00. CHANGE ORDER LOCATION: EASTGATE ADDITION PROJECT NO. 95-937 PROJECT: EASTGATE ADDITION DRAINAGE IMPROVEMENTS CHANGE ORDER NO. ONE CONTRACTOR: FRANK CONSTRUCTION CO.INC., P. O. BOX 47, SALINA, KS 67402 THIS AGREEMENT, made and entered into this llth day of September , 1995, by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the ex±st±ng contract dated May 22, 1995, under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated April - 1995 , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. Item No. Description 9. 4,000 square yards of fine grading (cut and fill) and seeding in existing drainage channel located on the east and south boundaries of Eastgate Addition 2. The u~dersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the draw±ngs, specifications, and contract documents, for the follow±ng prices: CHANGE ORDER PAGE 2 ITEM UNIT NO. DESCRIPTION OUANTITY UNIT PRICE TQTAL 9 Channel Grading and Seeding 4,000 S.Y. $ 1.83 $ 7.320.00 CHANGE ORDER TOTAL: $ 7,320.00 3. Additional time for completion by reason of this change $$ days. 4. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND PARTY THE CITY OF SALINA, KANSAS FRANK CONSTRUCTION CO., INC. BY: BY: MAYOR (Office or position of signer) Attest: CITY CLERK