7.4 Advis GICO Add CITY OF SALINA
REQUEST FOR COMMISSION ACTION DATE ... TIME
08 ~7 [9 5 4:00
i AGENDA SECTION: O~GINA~NG DEPARTMEHT: APPRO¥1~ FOR
AGENDA:
!NO. 7 En$ineering &
~0. 4 and 4a
BY: Bon Hoff BY: ,~
ITEM
Report on validity and submittal ofengineerin9 feasibility report
for Petition No. 4104 filed by Mr. James C0Pas requestin9 certain
street and utility improvementsin,'GICOAddition.
BACKGROUND
It is prescribed by Kansas State Statutes that the City Conuuission
consider a petition for street and utility improvements and
establish sufficiency on the basis that any one of the followin9
three conditions are met:
1. The petition is signed by a majority of the resident owners
of record of property liable for assessment under the
proposal.
2. The petition is signed by the reSident owners of record of
more than one half of the area liable for assessment under
the proposal.
3. The petition is si~ned by the owners of record, whether
resident or not, of more than one half of the area liable
to be assessed under the proposal.
In this case, the petitiOn signatures represent 100% of the owners
of record of the area liable for assessments. Therefore, the
petition clearly meets the statute requirements for sufficiency.
The Saline County Treasurer has certified that there are no
delinquent taxes or special assessments on any property within the
benefit district owned by the petitioner.
The en~ineerin~ feasibility report for these public improvements is
attached for your review. The property owners within the benefit
district shall be assessed for an estimated 88% of the project
costs which are estimated to be $516,832.00. Each of the sixty
four (64) properties will pay their share of the costs on the basis
of an equal assessment per lot for street and drainage, water and
sanitary sewer assessments.
COMMISSION ACTION
MORON BY SECOND BY
THAT: '-
' CITY OF SALINA
REQUEST FOR COMMISSION ACTION DATE TIME -
08 p7 [95 4:00 P.M.
AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR
NO. AGENDA:
~ng~neerffmg & Utilities
NO.
BY: Don Hoff BY:
Petition No.
Page 2
The project may be initially financed 80% by the City and 20% by
the petitioner, with 80% to be repaid by the property owners over
a 10 year period with the special assessment system. The
petitioner would also have the option of submitting a letter of
credit for 35% of the project costs and assessing 100% of the
project costs to the property owners.
RECOMMENDATION
It is recon~aended that the City Commission approve the engineering
feasibility report for street and utility improvements and adopt
the resolution determining the advisability of the report.
Attachment: Feasibility Report
Resolution 95-4904
COMMISSION ACTION
MOTION BY SECOND BY
THAT:
PRELIMINARY ENGINEERING ESTIMATE
AND
FEASIBILITY REPORT
PETITION NO.
PROPOSED
STREET AND UTILITY IMPROVEMENTS
GICO ADDITION
TO THE CITY OF SALINA, KANSAS
FILE NO. 95-5 JULY - 1995
DON HOFF, DIRECTOR OF ENGINEERING & UTILITIES
SCOPE OF WORK
The curbing, guttering, grading, and paving of Faith Drive from the
south line of McAdams Road to the north line of Republic Avenue to
serve Lots I through 4, Block 1; Lots i through 23, Block 2; Lots
I through 7, Block 3; Lots i through 8, Block 4; Lots I through 21,
Block 5, GICO Addition; City Park, all in GICOAddition.
The curbing, guttering, grading, and paving of Courtney Drive from
the north line of Republic Avenue to the south line of Lot 1, Block
4, GICO Addition to serve Lots i through 4, Block 1; Lots I through
23, Block 2; Lots I through 7, Block 3; and Lots i through 8, Block
4; Lots i through 21, Block 5; City Park, all in GICO Addition.
The curbing, guttering, grading, and paving of Martin Avenue from
the east line of Meyer Drive to the west line of Faith Drive to
serve Lots i through 4, Block 1; Lots I through 23, Block 2; Lots
I through 7, Block 3; Lots I through 8, Block 4; Lots I through 21,
Block 5; City Park, all in GICO Addition.
The curbing, guttering, grading and paving of Kaci Court from the
west line of Faith Drive to the cul-de-sac to serve Lots i through
4, Block 1; Lots i through 23, Block 2; Lots I through 7, Block 3;
Lots i through 8, Block 4; Lots i through 21, Block 5; City Park,
all in GIC0 Addition.
The curbing, guttering, grading and paving of Republic Avenue from
the west line of Courtney Drive to the west line of Lot 1, Block 3,
GICO Addition to serve Lots I through 4, Block 1; Lots i through
23, Block 2; Lots I through 7, Block 3; Lots i through 8, Block 4;
Lots I through 21, block 5; City Park; all in the GICO Addition.
The installation of sanitary sewer main to serve Lots I through 4,
Block 1; Lots i through 23, Block 2; Lots I through 7, Block 3; Lot
1, Block 4; Lots 1, 13, ans 14, Block 5;and City Park; all in GICO
Addition.
The installation of water main to serve Lots I through 4, ~lock 1;
Lots I through 23, Block 2; Lots I through 7, Block 3; Lot 1, Block
4; Lots 1, 13, and 14, Block 5; and City Park, all in GIC0
Addition.
'The installation of a storm drainage system to serve Lots i through
4, Block 1, GICO Addition; Lots i through 23, Block 2, GIC0
Addition; Lots i through 7, Block 3, GICO Addition; Lots i through
8, Block 4; Lots i through 21, Block 5; City Park, GIC0 Addition.
2
BENEFIT DISTRICT
Lots i through 4, Block 1, GICO Addition; Lots i through 23, Block
2, GICO Addition; Lots 1 through 7, Block 3, GICO Addition; Lots 1
through 8, Block 4; Lots i through 21, Block 5, GICO Addition; City
Park, GICO Addition;
ADOPTION OF~SE~_~T.
The assessment with accrued interest to be levied as a special
assessment tax upon the property included within the benefit
district concurrent with the general property tax and shall be
payable in ten (10) equal annual installments.
The method of assessment is that 100% of the total cost assessed
against the property shall be based upon equal street, sanitary
sewer, water or storm drainage assessments for each lot in the
benefit district.
3
APPORTIONMENT OF COST
COST CHARGEABLE TO PRIVATE PROPERTY:
1. 82.6% of the total cost of street improvements, including
grading, pavement, curb and ~utters, and any incidentals
thereto to complete the street system.
2. 94.4% of the total cost of water mains, fittings, hydrants,
water services, valves, and any incidentals thereto to
complete the water system.
3. 94.4% of the total cost of sanitary sewer pipeline,
manholes, service connections and any incidentals thereto
to complete the sanitary sewer system.
4. 96.9% of the total cost of storm drainage improvements,
including earthwork, ditch liners, concrete flumes,
pipelines, seeding and any incidentals thereto to complete
the storm drainage system.
COST CHARGEABLE TO CITY:
* 1. 17.4% of the total cost of street and drainage
improvements, including grading, pavement, curb and
~utters, and any incidentals thereto to complete the street
system.
* 2. 5.6% of the total cost of water mains, fittings, hydrants,
water services, valves, and any incidentals thereto to
complete the water system.
* 3. 5.6% of the total cost of sanitary sewer pipeline,
manholes, service connections and any incidentals thereto
to complete the sanitary sewer system.
* 4. 3.1% of the total cost of storm drainage improvements;
including earthwork, ditch liners, concrete flumes,
pipelines, seeding and any incidentals thereto to complete
the storm drainage system.
* City of Salina participation in development costs due to location
of new city park located in northeast corner of GICO Addition.
4
DISTRIBUTIQN OF COST
PART OF GICO ADDITION
TO THE CITY OF SALINA, KANSAS
PETITION NO.
COST * COST COST
CHARGEABLE PER CHARGEABLE TO CHARGEABLE TOTAL
EACH LOT BENEFIT DIST. TO CITY COST
IMPROVEMENTS
STREET $ 6,344.30 $241,083.40 $50,754.60 $291,838.00
STORM DRAINAGE
SYSTEM $ 1,091.69 $ 68,776.47 $ 2,183.53 $ 70,960.00
WATER SYSTEM $ 3,074.08 $104,518.72 $ 6,148.28 $110,667.00
SANITARY SEWER
SYSTEM $ 1,204.64 $ 40,957.76 $ 2,409.24 $ 43,367.00
TOTAL: $11,714.71 $455,336.35 $61,495.65 $516,832.00
* City of Salina participation in development costs due to location
of new city park located at the northeast corner of GICO Addition
5
PETITION NO.
PRELIMINARY ESTIMATE OF
ADDITION
TOTAL PROJECT COSTS
(Including Streets, Water, Sanitary Sewer and Storm Drainage)
1. COMMON EXCAVATION 11,480 C.Y. @ $ 5.00 = $ 57,400
2. ASPHALT OR CONCRETE PVMT. 9,990 S.Y. @ 15.00 = 149,850
3. VALLEY GUTTER 498 S.Y. @ 25.00 = 12,450
4. CONCRETE CURB & GUTTER 5,630 L.F. @ 8.00 = 45,040
5. SIDEWALK RAMP 20 EA. @ 800.00 = 16,000
6. STOP~4 PIPELINE, 18" 275 L.F. @ 35.00 = 9,625
7. PIPE END SECTION, 18" 2 EA. @ 300.00 = 600
8 WATER PIPELINE, 6" 3,320 L.F. @ 12.00 = 39,840
9 WATER FITTINGS 1 TON @ 3,500.00 = 3,500
10 FIRE HYDRANT 7 EA. @ 1,700.00 = 11,900
11 GATE VALVE, 6" 6 EA. @ 500 00 = 3,000
12 WATER SERVICE, 1" 34 EA. @ 800 00 = 27,200
13 SEWER PIPELINE, 8" 1,322 L.F. @ 16 00 = 21,152
14 SEWER PIPELINE, 4" 170 L.F. @ 8 00 = 1,360
15 STANDARD MANHOLE (TYPE I) 5 EA. @ 1,800 00 = 9,000
16 SEWER TEES, .8" X 4" 26 EA. @ 75 00 = 1,950
17 SPECIAL TRENCH COMPACTION 790 L.F. @ 7 00 = 5,530
18. SEEDING 1.5 AC. @ 3,000 00 = 4,500
19. WATER 1 L.S. @ 1,000 00 = 1,000
20. CONSTRUCTION STAKING 1 L.S. @ 5,000 00 = 5,000
SUB TOTAL: $425,897
15% ENGINEERING & CONTINGENCY: 63,885
TEMPORARY NOTE INTEREST, BONDING, ISSUING: 27,050
TOTAL: $516,832
PETITION NO.
PRELIMINARY ESTIMATE OF
GICO ADDITION
Preliminary Estimate of
PROJECT COSTS (Street Improvements only)
1. COMMON EXCAVATION 2,880 C.Y. @ $ 5.00 = $ 14,400
2. ASPHALT OR CONCRETE PVMT. 9,990 S.Y. @ 15.00 = 149,850
3. VALLEY GUTTER 498 S.Y. @ 25.00 = 12,450
4. CONCRETE CURB & GUTTER 5,630 L.F. @ 8.00 = 45,040
5. SIDEWALK RAMP 20 EA. @ 800.00 = 16,000
19. WATER 1 L.S. @ 250.00 = 250
20. CONSTRUCTION STAKING 1 L.S. @ 2,500.00 = 2,500
SUB TOTAL: $240,490
15% ENGINEERING & CONTINGENCY: 36,074
TEMPORARY NOTE INTEREST, BONDING, ISSUING: 15,274
TOTAL: $291,838
PRELIMINARY ESTIMATE OF
PROJECT COSTS (Storm Drainage only)
1. COMMON EXCAVATION 8,600 C.Y. @ $ 5.00 = $ 43,000
6. STORM PIPELINE, 18" 275 L.F. @ 35.00 = 9,625
7. PIPE END SECTION, 18" 2 EA. @ 300.00 = 600
18. SEEDING 1.5 AC. @ 3,000.00 = 4,500
19. WATER 1 L.S. @ 250.00 = 250
20. CONSTRUCTION STAKING 1 L.S. @ 500.00 = 500
SUB TOTAL: $ 58,475
15% ENGINEERING & CONTINGENCY: 8,771
TEMPORARY NOTE INTEREST, BONDING, ISSUING: 3,714
TOTAL: $ 70,960
PETITION NO.
ADDITION
PRELIMINARY ESTIMATE OF
PROJECT COSTS (Water System only)
8. WATER PIPELINE, 6" 3,320 L.F. @ $ 12.00 = $ 39,840
9. WATER FITTINGS i TON $ 3,500.00 = 3,500
10. FIRE HYDRANT 7 EA. $ 1,700.00 = 11,900
11. GATE VALVE, 6" 6 EA. ~ 500.00 = 3,000
12. WATER SERVICE, 1" 34 EA. ~ 800.00 = 27,200
16. SPECIAL TRENCH COMPACTION 7.5 L.F. ~ 7.00 = 5,005
19. WATER I L.F. @ 250.00 = 250
20. CONSTRUCTION STAKING I L.F. ~ 500.00 = ~OO
SUB TOTAL: $ 91,195
15% ENGINEERING & CONTINGENCY: 13,680
TEMPORARY NOTE INTEREST, BONDING, ISSUING: 5.792
TOTAL: $110,667
PRELIMINARY ESTIMATE OF
PROJECT COSTS (Sanitary Sewer only)
13. SEWER PIPELINE, 8" 1,322 L.F. @ $ 16.00 = $ 21,152
14. SEWER PIPELINE, 4" 170 L.F. @ 8.00 = 1,360
15. STANDAP, D MANHOLE (TYPE I) 5 EA. ~ 1,800.00 = ' 9,000
16. SEWER TEES, 8" X 4" 26 EA. @ 75.00 = 1,950
17. SPECIAL TRENCH COMPACTION 75 L.F. @ 7.00 = 525
19. WATER i L.S. @ 250.00 = 250
20. CONSTRUCTION STAKING i L.S. @ 1,500.00 = 1,500
SUB TOTAL: $ 35,737
15% ENGINEERING & CONTINGENCY: 5,360
TEMPORARY NOTE INTEREST, BONDING, ISSUING: 2,270
TOTAL: $ 43,367
GICO ADDITION
to the City of Salina, Kansas
DISTRIBUTION OF COSTS
Streets
Faith Drive
Courtney Drive
Martin Avenue
Property Front Per Kaci Court Sanitary Storm
Description Footage Each Republic Avenue Sewer Water Drainage Total
GICO ADDITION, BLOC.K 1
Lot 1 156.00 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.68 $11,286.85
Lot 2 80.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 3 80.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 4 130.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
GICO ADDITION, BLOCK 2
Lot 1 82.60 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 2 82.50 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 3 84.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,268.85
Lot 4 82.70 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,268.85
Lot 5 127.30 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 6 87.70 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
LOt 7 80.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,268.85
LOt 8 50.00 1.00 $6,344.50 $1,084.18 $2,766.68 $1,091.69 $11,286.85
Lot 9 90.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 10 106.30 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 11 112.70 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 12 99.20 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 13 68.60 1.00 $6,344.30 $1,084.18 $2,768.68 $1,081.69 $11,286.85
Lot 14 87.50 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85
Lot 15 87.50 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85
Lot 16 95.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 17 78.80 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 18 70.00 1.00 $6,344.30 $1,084.1 8 $2,766.68 $1,091.69 $11,286.85
Lot 19 70.00 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85
Lot 20 70.00 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85
Lot 21 , 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 22 70.00, ~ 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.6g $11,268.85
Lot 23 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $I 1,286.85
GICO ADDITION, BLOCK 3
Lot 1 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,268.85
Lot 2 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 3 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
LOt 4 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,268.85
Lot 5 70.00 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85
Martin Avenue
Property Front Per Kaci Court Sanitary Storm
Description Footage Each Republic Avenue Sewer Water Drainage Total
Lot 6 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85
Lot 7 78.80 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85
GICO ADDITION, BLOCK 4
Lot 1 80.00 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85
Lot 2 72.00 1.00 $1,091.69 $1,091.69
Lot 3 72.00 1.00 $1,091.69 $1,091.69
Lot 4 72.00 1.00 $1,091.69 $1,091.69
Lot 5 72.00 1.00 $1,091.69 $1,091.69
Lot 6 72.00 1.00 $1,091.69 $1,091.69
Lot 7 72.00 1.00 $1,091.69 $1,091.69
Lot 8 64.30 1.00 $1,091.69 $1,091.69
GICO ADDITION, BLOCK $
Lot 1 93.40 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85
Lot 2 71.00 1.00 $1,091.69 $1,091.69
Lot 3 71.00 1.00 $1,091.69 $1,091.69
Lot 4 69.60 1.00 $1,091.69 $1,091.69
Lot 5 87.70 1.00 $1,091.69 $1,091.69
Lot 6 84.30 1.00 $1,091.69 $1,091.69
Lot 7 198.00 1.00 $1,091.69 $1,091.69
Lot 8 126.10 1.00 $1,091.69 $1,091.69
Lot 9 84.30 1.00 $1,091.69 $1,091.69
Lot 10 71.00 1.00 $1,091.69 $1,091.69
Lot 11 71.00 1.00 $1,091.69 $1,091.69
Lot 12 71.00 1.00 $1,091.69 $1,091.69
Lot 13 84.50 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85
Lot 14 84.50 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85
Lot 15 71.00 1.00 $1,091.69 $1,091.69
Lot 16 71.00 1.00 $1,091.69 $1,091.69
Lot 17 71.00 1.00 $1,091.69 $1,091.69
Lot 18 71.00 1.00 $1,091.69 $1,091.69
Lot 19 71.00 1.00 $1,091.69 $1,091.69
Lot 20 71.00 1.00 $1,091.69 $1,091.69
Lot 21 68.20 1.00 $1,091.69 $1,091.69
GICO ADDITION .... ,?~
City Park 922.00 8.00 $50,754.60 $2,168.16 $5,533.16 $2,183.53 $60,539.45
TOTAL: $291,838.00 $43,367.00 $110,687.00 $70,960.00 $616,832.00
PETITION NO.
GICO ADDITION
PROPERTY OWNERSHIP
Property Description Property Owner
GIC0 Addition, Block i GICO, Inc.
Lot 1
Lot 2 "
LOt 3 "
Lot 4 "
GICO Addition, Block 2 GICO, Inc.
Lot 1 "
Lot 2 "
Lot 3 "
Lot 4
LOt 5 "
Lot 6 "
LOt 7 "
Lot 8 "
Lot 9 "
Lot 10 "
LOt 11 "
LOt 12 "
Lot 13 "
Lot 14 "
Lot 15 "
Lot 16 "
Lot 17 "
Lot 18 "
Lot 19 "
Lot 20 "
LOt 21 "
LOt 22 "
Lot 23
GICO Addition, Block 3 GICO, Inc.
Lot 3
Lot 2 "
LOt 3 "
Lot 4 "
Lot 5 "
LOt 6 "
Lot 7
Property Description Property Owner
GICO Addition, Block 4 GICO, Inc.
Lot 1 "
Lot 2 "
Lot 3 "
Lot 4 "
Lot 5 "
Lot 6 "
Lot 7 "
Lot 8 "
GICO Addition, Block 5 GICO, Inc.
Lot 1 "
Lot 2 "
Lot 3 "
Lot 4 "
Lot 5
Lot 6 "
Lot 7 "
Lot 8 "
Lot 9 "
Lot 10 "
Lot 11 "
Lot 12 "
LOt 13 "
Lot 14 "
LOt 15 "
Lot 16 "
Lot 17 "
LOt 18 "
LOt 19 "
LOt 21 "
GIC0 Addition
City Park City of Salina
10
DO NO1' WRITE It~1 THIS SPACE
PETITION NUHBER
TO: THE GOVERNING BODY
City of Salins, Konsss :
(Al I~. the undersigned, being owners of record of property liable for assessment for the following I~provmnonts:
~;ee ]~xhtbit "A"
hereby propose that such Improvement be made tn tho manner provided by Arttole h, Chapter 12 of the Kansas
Statutes Anflotlted, ss amended,
(B) The estimate or probable cost of su~ {~rov~nt fl Five Hundred Sixteen ~ousand Eight
Hundred ~trcy ~o and 001100 Dollars.
(S516,832.00)
lC) The exteflg of the pr~sed i~rov~nt district to be assessed os {ndieited ~ t~ attached plat and Is
described es fail.az ~o~s ~ through ~T ~lock 1, G~CO Addition; ~oCs I through 23, ~lock 2
G[CO Addition: ~oCs ,1 Chgou~h 7; Block 3~ G~CO Addition; ~oCs I Chgough 8, ~1oc~ ~, ~IC0
~dd~r~on:- ~oc. I ChFou~h 21~ ~lock ~ G~CO Addition; City ~ack; all 1n G~CO Addition.
(O) Tho proposed method of assessment Is.' shall be based on equal assessments for each lot of land and without re~ard to buildings or Improvements of the land.
(E) The proposed apportionment of costs between the Improvement district 8nd tho City-at-large ts:
* percent ( ~) to be assessed against the Jmprovmnt district and
* percent ( ,, ~} to be assessed against tho City-at-largo.
(Fl We further propose that such i~rovemeflt be Nde without notice and hearing sa required by K.S.A, 12-6s0~(1)
es amended.
* No nome may be withdrawn from this petition after the Governing Body eoemeflces consideration
* of the petition or liter than seven (7) days after this petition his been filed with the City Clerk
* (K.S.A. 12-6sOq)
Respoetfully submitted by. Mr. James Copas
Telephone Number 827-4502
Dm&Time ' Pmpmly owned within U~e
* Apportionment of cost in the improvement district to be based
upon project feasibility report and actual project costs due
to existence of city-owned park in the benefit diGtrict.
The curbing, ~uttering, grading, and paving of Faith Drive from the
south line of McA~ams Road to the north line of Republic Avenue to
serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots
1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21,
Block 5, GICO Addition; City Park, all in GICO Addition.
The curbing, ~uttering, grading, and paving of Courtney Drive from
the north line of Republic Avenue to the south line of Lot 1, Block
4, GICO Addition to serve Lots 1 through 4, Block 1; Lots 1 through
23, Block 2; Lots 1 through 7, Block 3; and Lots 1 through 8, Block
4; Lots 1 through 21, Block 5; City Park, all in GICO Addition.
The curbing, ~uttering, grading, and paving of Martin Avenue from
the east line of Meyer Drive to the west line of Faith Drive to
serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots
1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21,
Block 5; City Park, all in GICO Addition.
The curbing, ~uttering, grading and paving of Kaci Court from the
west line of Faith Drive to the cul-de-sac to serve Lots 1 through
4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3;
Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park,
all in GICO Addition.
The curbing, ~uttering, grading and paving of Republic Avenue from
the west line of Courtney Drive to the west line of Lot 1, Block 3,
GICO Addition to serve Lots 1 through 4, Block 1; Lots 1 through
23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4;
Lots 1 through 21, block 5; City Park; all in the GICO Addition.
The installation of sanitary sewer main to serve Lots 1 through 4,
Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lot
1, Block 4; Lots 1, 13, ans 14, Block 5;and City Park; all in GICO
Addition.
The installation of water main to serve Lots 1 through 4, Block 1;
Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lot ~, Block
4; Lots 1, 13, and 14, Block 5; and City Park, all in GICO
Addition.
The installation of a storm drainage system to serve Lots 1 through
4, Block 1, GICO Addition; Lots 1 through 23, Block 2, GICO
Addition; Lots 1 through 7, Block 3, GICO Addition; Lots 1 through
8, Block 4; Lots 1 through 21, Block 5; City Park, GICO Addition.