Loading...
7.4 Advis GICO Add CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE ... TIME 08 ~7 [9 5 4:00 i AGENDA SECTION: O~GINA~NG DEPARTMEHT: APPRO¥1~ FOR AGENDA: !NO. 7 En$ineering & ~0. 4 and 4a BY: Bon Hoff BY: ,~ ITEM Report on validity and submittal ofengineerin9 feasibility report for Petition No. 4104 filed by Mr. James C0Pas requestin9 certain street and utility improvementsin,'GICOAddition. BACKGROUND It is prescribed by Kansas State Statutes that the City Conuuission consider a petition for street and utility improvements and establish sufficiency on the basis that any one of the followin9 three conditions are met: 1. The petition is signed by a majority of the resident owners of record of property liable for assessment under the proposal. 2. The petition is signed by the reSident owners of record of more than one half of the area liable for assessment under the proposal. 3. The petition is si~ned by the owners of record, whether resident or not, of more than one half of the area liable to be assessed under the proposal. In this case, the petitiOn signatures represent 100% of the owners of record of the area liable for assessments. Therefore, the petition clearly meets the statute requirements for sufficiency. The Saline County Treasurer has certified that there are no delinquent taxes or special assessments on any property within the benefit district owned by the petitioner. The en~ineerin~ feasibility report for these public improvements is attached for your review. The property owners within the benefit district shall be assessed for an estimated 88% of the project costs which are estimated to be $516,832.00. Each of the sixty four (64) properties will pay their share of the costs on the basis of an equal assessment per lot for street and drainage, water and sanitary sewer assessments. COMMISSION ACTION MORON BY SECOND BY THAT: '- ' CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME - 08 p7 [95 4:00 P.M. AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR NO. AGENDA: ~ng~neerffmg & Utilities NO. BY: Don Hoff BY: Petition No. Page 2 The project may be initially financed 80% by the City and 20% by the petitioner, with 80% to be repaid by the property owners over a 10 year period with the special assessment system. The petitioner would also have the option of submitting a letter of credit for 35% of the project costs and assessing 100% of the project costs to the property owners. RECOMMENDATION It is recon~aended that the City Commission approve the engineering feasibility report for street and utility improvements and adopt the resolution determining the advisability of the report. Attachment: Feasibility Report Resolution 95-4904 COMMISSION ACTION MOTION BY SECOND BY THAT: PRELIMINARY ENGINEERING ESTIMATE AND FEASIBILITY REPORT PETITION NO. PROPOSED STREET AND UTILITY IMPROVEMENTS GICO ADDITION TO THE CITY OF SALINA, KANSAS FILE NO. 95-5 JULY - 1995 DON HOFF, DIRECTOR OF ENGINEERING & UTILITIES SCOPE OF WORK The curbing, guttering, grading, and paving of Faith Drive from the south line of McAdams Road to the north line of Republic Avenue to serve Lots I through 4, Block 1; Lots i through 23, Block 2; Lots I through 7, Block 3; Lots i through 8, Block 4; Lots I through 21, Block 5, GICO Addition; City Park, all in GICOAddition. The curbing, guttering, grading, and paving of Courtney Drive from the north line of Republic Avenue to the south line of Lot 1, Block 4, GICO Addition to serve Lots i through 4, Block 1; Lots I through 23, Block 2; Lots I through 7, Block 3; and Lots i through 8, Block 4; Lots i through 21, Block 5; City Park, all in GICO Addition. The curbing, guttering, grading, and paving of Martin Avenue from the east line of Meyer Drive to the west line of Faith Drive to serve Lots i through 4, Block 1; Lots I through 23, Block 2; Lots I through 7, Block 3; Lots I through 8, Block 4; Lots I through 21, Block 5; City Park, all in GICO Addition. The curbing, guttering, grading and paving of Kaci Court from the west line of Faith Drive to the cul-de-sac to serve Lots i through 4, Block 1; Lots i through 23, Block 2; Lots I through 7, Block 3; Lots i through 8, Block 4; Lots i through 21, Block 5; City Park, all in GIC0 Addition. The curbing, guttering, grading and paving of Republic Avenue from the west line of Courtney Drive to the west line of Lot 1, Block 3, GICO Addition to serve Lots I through 4, Block 1; Lots i through 23, Block 2; Lots I through 7, Block 3; Lots i through 8, Block 4; Lots I through 21, block 5; City Park; all in the GICO Addition. The installation of sanitary sewer main to serve Lots I through 4, Block 1; Lots i through 23, Block 2; Lots I through 7, Block 3; Lot 1, Block 4; Lots 1, 13, ans 14, Block 5;and City Park; all in GICO Addition. The installation of water main to serve Lots I through 4, ~lock 1; Lots I through 23, Block 2; Lots I through 7, Block 3; Lot 1, Block 4; Lots 1, 13, and 14, Block 5; and City Park, all in GIC0 Addition. 'The installation of a storm drainage system to serve Lots i through 4, Block 1, GICO Addition; Lots i through 23, Block 2, GIC0 Addition; Lots i through 7, Block 3, GICO Addition; Lots i through 8, Block 4; Lots i through 21, Block 5; City Park, GIC0 Addition. 2 BENEFIT DISTRICT Lots i through 4, Block 1, GICO Addition; Lots i through 23, Block 2, GICO Addition; Lots 1 through 7, Block 3, GICO Addition; Lots 1 through 8, Block 4; Lots i through 21, Block 5, GICO Addition; City Park, GICO Addition; ADOPTION OF~SE~_~T. The assessment with accrued interest to be levied as a special assessment tax upon the property included within the benefit district concurrent with the general property tax and shall be payable in ten (10) equal annual installments. The method of assessment is that 100% of the total cost assessed against the property shall be based upon equal street, sanitary sewer, water or storm drainage assessments for each lot in the benefit district. 3 APPORTIONMENT OF COST COST CHARGEABLE TO PRIVATE PROPERTY: 1. 82.6% of the total cost of street improvements, including grading, pavement, curb and ~utters, and any incidentals thereto to complete the street system. 2. 94.4% of the total cost of water mains, fittings, hydrants, water services, valves, and any incidentals thereto to complete the water system. 3. 94.4% of the total cost of sanitary sewer pipeline, manholes, service connections and any incidentals thereto to complete the sanitary sewer system. 4. 96.9% of the total cost of storm drainage improvements, including earthwork, ditch liners, concrete flumes, pipelines, seeding and any incidentals thereto to complete the storm drainage system. COST CHARGEABLE TO CITY: * 1. 17.4% of the total cost of street and drainage improvements, including grading, pavement, curb and ~utters, and any incidentals thereto to complete the street system. * 2. 5.6% of the total cost of water mains, fittings, hydrants, water services, valves, and any incidentals thereto to complete the water system. * 3. 5.6% of the total cost of sanitary sewer pipeline, manholes, service connections and any incidentals thereto to complete the sanitary sewer system. * 4. 3.1% of the total cost of storm drainage improvements; including earthwork, ditch liners, concrete flumes, pipelines, seeding and any incidentals thereto to complete the storm drainage system. * City of Salina participation in development costs due to location of new city park located in northeast corner of GICO Addition. 4 DISTRIBUTIQN OF COST PART OF GICO ADDITION TO THE CITY OF SALINA, KANSAS PETITION NO. COST * COST COST CHARGEABLE PER CHARGEABLE TO CHARGEABLE TOTAL EACH LOT BENEFIT DIST. TO CITY COST IMPROVEMENTS STREET $ 6,344.30 $241,083.40 $50,754.60 $291,838.00 STORM DRAINAGE SYSTEM $ 1,091.69 $ 68,776.47 $ 2,183.53 $ 70,960.00 WATER SYSTEM $ 3,074.08 $104,518.72 $ 6,148.28 $110,667.00 SANITARY SEWER SYSTEM $ 1,204.64 $ 40,957.76 $ 2,409.24 $ 43,367.00 TOTAL: $11,714.71 $455,336.35 $61,495.65 $516,832.00 * City of Salina participation in development costs due to location of new city park located at the northeast corner of GICO Addition 5 PETITION NO. PRELIMINARY ESTIMATE OF ADDITION TOTAL PROJECT COSTS (Including Streets, Water, Sanitary Sewer and Storm Drainage) 1. COMMON EXCAVATION 11,480 C.Y. @ $ 5.00 = $ 57,400 2. ASPHALT OR CONCRETE PVMT. 9,990 S.Y. @ 15.00 = 149,850 3. VALLEY GUTTER 498 S.Y. @ 25.00 = 12,450 4. CONCRETE CURB & GUTTER 5,630 L.F. @ 8.00 = 45,040 5. SIDEWALK RAMP 20 EA. @ 800.00 = 16,000 6. STOP~4 PIPELINE, 18" 275 L.F. @ 35.00 = 9,625 7. PIPE END SECTION, 18" 2 EA. @ 300.00 = 600 8 WATER PIPELINE, 6" 3,320 L.F. @ 12.00 = 39,840 9 WATER FITTINGS 1 TON @ 3,500.00 = 3,500 10 FIRE HYDRANT 7 EA. @ 1,700.00 = 11,900 11 GATE VALVE, 6" 6 EA. @ 500 00 = 3,000 12 WATER SERVICE, 1" 34 EA. @ 800 00 = 27,200 13 SEWER PIPELINE, 8" 1,322 L.F. @ 16 00 = 21,152 14 SEWER PIPELINE, 4" 170 L.F. @ 8 00 = 1,360 15 STANDARD MANHOLE (TYPE I) 5 EA. @ 1,800 00 = 9,000 16 SEWER TEES, .8" X 4" 26 EA. @ 75 00 = 1,950 17 SPECIAL TRENCH COMPACTION 790 L.F. @ 7 00 = 5,530 18. SEEDING 1.5 AC. @ 3,000 00 = 4,500 19. WATER 1 L.S. @ 1,000 00 = 1,000 20. CONSTRUCTION STAKING 1 L.S. @ 5,000 00 = 5,000 SUB TOTAL: $425,897 15% ENGINEERING & CONTINGENCY: 63,885 TEMPORARY NOTE INTEREST, BONDING, ISSUING: 27,050 TOTAL: $516,832 PETITION NO. PRELIMINARY ESTIMATE OF GICO ADDITION Preliminary Estimate of PROJECT COSTS (Street Improvements only) 1. COMMON EXCAVATION 2,880 C.Y. @ $ 5.00 = $ 14,400 2. ASPHALT OR CONCRETE PVMT. 9,990 S.Y. @ 15.00 = 149,850 3. VALLEY GUTTER 498 S.Y. @ 25.00 = 12,450 4. CONCRETE CURB & GUTTER 5,630 L.F. @ 8.00 = 45,040 5. SIDEWALK RAMP 20 EA. @ 800.00 = 16,000 19. WATER 1 L.S. @ 250.00 = 250 20. CONSTRUCTION STAKING 1 L.S. @ 2,500.00 = 2,500 SUB TOTAL: $240,490 15% ENGINEERING & CONTINGENCY: 36,074 TEMPORARY NOTE INTEREST, BONDING, ISSUING: 15,274 TOTAL: $291,838 PRELIMINARY ESTIMATE OF PROJECT COSTS (Storm Drainage only) 1. COMMON EXCAVATION 8,600 C.Y. @ $ 5.00 = $ 43,000 6. STORM PIPELINE, 18" 275 L.F. @ 35.00 = 9,625 7. PIPE END SECTION, 18" 2 EA. @ 300.00 = 600 18. SEEDING 1.5 AC. @ 3,000.00 = 4,500 19. WATER 1 L.S. @ 250.00 = 250 20. CONSTRUCTION STAKING 1 L.S. @ 500.00 = 500 SUB TOTAL: $ 58,475 15% ENGINEERING & CONTINGENCY: 8,771 TEMPORARY NOTE INTEREST, BONDING, ISSUING: 3,714 TOTAL: $ 70,960 PETITION NO. ADDITION PRELIMINARY ESTIMATE OF PROJECT COSTS (Water System only) 8. WATER PIPELINE, 6" 3,320 L.F. @ $ 12.00 = $ 39,840 9. WATER FITTINGS i TON $ 3,500.00 = 3,500 10. FIRE HYDRANT 7 EA. $ 1,700.00 = 11,900 11. GATE VALVE, 6" 6 EA. ~ 500.00 = 3,000 12. WATER SERVICE, 1" 34 EA. ~ 800.00 = 27,200 16. SPECIAL TRENCH COMPACTION 7.5 L.F. ~ 7.00 = 5,005 19. WATER I L.F. @ 250.00 = 250 20. CONSTRUCTION STAKING I L.F. ~ 500.00 = ~OO SUB TOTAL: $ 91,195 15% ENGINEERING & CONTINGENCY: 13,680 TEMPORARY NOTE INTEREST, BONDING, ISSUING: 5.792 TOTAL: $110,667 PRELIMINARY ESTIMATE OF PROJECT COSTS (Sanitary Sewer only) 13. SEWER PIPELINE, 8" 1,322 L.F. @ $ 16.00 = $ 21,152 14. SEWER PIPELINE, 4" 170 L.F. @ 8.00 = 1,360 15. STANDAP, D MANHOLE (TYPE I) 5 EA. ~ 1,800.00 = ' 9,000 16. SEWER TEES, 8" X 4" 26 EA. @ 75.00 = 1,950 17. SPECIAL TRENCH COMPACTION 75 L.F. @ 7.00 = 525 19. WATER i L.S. @ 250.00 = 250 20. CONSTRUCTION STAKING i L.S. @ 1,500.00 = 1,500 SUB TOTAL: $ 35,737 15% ENGINEERING & CONTINGENCY: 5,360 TEMPORARY NOTE INTEREST, BONDING, ISSUING: 2,270 TOTAL: $ 43,367 GICO ADDITION to the City of Salina, Kansas DISTRIBUTION OF COSTS Streets Faith Drive Courtney Drive Martin Avenue Property Front Per Kaci Court Sanitary Storm Description Footage Each Republic Avenue Sewer Water Drainage Total GICO ADDITION, BLOC.K 1 Lot 1 156.00 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.68 $11,286.85 Lot 2 80.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 3 80.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 4 130.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 GICO ADDITION, BLOCK 2 Lot 1 82.60 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 2 82.50 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 3 84.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,268.85 Lot 4 82.70 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,268.85 Lot 5 127.30 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 6 87.70 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 LOt 7 80.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,268.85 LOt 8 50.00 1.00 $6,344.50 $1,084.18 $2,766.68 $1,091.69 $11,286.85 Lot 9 90.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 10 106.30 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 11 112.70 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 12 99.20 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 13 68.60 1.00 $6,344.30 $1,084.18 $2,768.68 $1,081.69 $11,286.85 Lot 14 87.50 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85 Lot 15 87.50 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85 Lot 16 95.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 17 78.80 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 18 70.00 1.00 $6,344.30 $1,084.1 8 $2,766.68 $1,091.69 $11,286.85 Lot 19 70.00 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85 Lot 20 70.00 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85 Lot 21 , 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 22 70.00, ~ 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.6g $11,268.85 Lot 23 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $I 1,286.85 GICO ADDITION, BLOCK 3 Lot 1 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,268.85 Lot 2 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 3 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 LOt 4 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,268.85 Lot 5 70.00 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85 Martin Avenue Property Front Per Kaci Court Sanitary Storm Description Footage Each Republic Avenue Sewer Water Drainage Total Lot 6 70.00 1.00 $6,344.30 $1,084.18 $2,768.68 $1,091.69 $11,286.85 Lot 7 78.80 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85 GICO ADDITION, BLOCK 4 Lot 1 80.00 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85 Lot 2 72.00 1.00 $1,091.69 $1,091.69 Lot 3 72.00 1.00 $1,091.69 $1,091.69 Lot 4 72.00 1.00 $1,091.69 $1,091.69 Lot 5 72.00 1.00 $1,091.69 $1,091.69 Lot 6 72.00 1.00 $1,091.69 $1,091.69 Lot 7 72.00 1.00 $1,091.69 $1,091.69 Lot 8 64.30 1.00 $1,091.69 $1,091.69 GICO ADDITION, BLOCK $ Lot 1 93.40 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85 Lot 2 71.00 1.00 $1,091.69 $1,091.69 Lot 3 71.00 1.00 $1,091.69 $1,091.69 Lot 4 69.60 1.00 $1,091.69 $1,091.69 Lot 5 87.70 1.00 $1,091.69 $1,091.69 Lot 6 84.30 1.00 $1,091.69 $1,091.69 Lot 7 198.00 1.00 $1,091.69 $1,091.69 Lot 8 126.10 1.00 $1,091.69 $1,091.69 Lot 9 84.30 1.00 $1,091.69 $1,091.69 Lot 10 71.00 1.00 $1,091.69 $1,091.69 Lot 11 71.00 1.00 $1,091.69 $1,091.69 Lot 12 71.00 1.00 $1,091.69 $1,091.69 Lot 13 84.50 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85 Lot 14 84.50 1.00 $6,344.30 $1,084.18 $2,766.68 $1,091.69 $11,286.85 Lot 15 71.00 1.00 $1,091.69 $1,091.69 Lot 16 71.00 1.00 $1,091.69 $1,091.69 Lot 17 71.00 1.00 $1,091.69 $1,091.69 Lot 18 71.00 1.00 $1,091.69 $1,091.69 Lot 19 71.00 1.00 $1,091.69 $1,091.69 Lot 20 71.00 1.00 $1,091.69 $1,091.69 Lot 21 68.20 1.00 $1,091.69 $1,091.69 GICO ADDITION .... ,?~ City Park 922.00 8.00 $50,754.60 $2,168.16 $5,533.16 $2,183.53 $60,539.45 TOTAL: $291,838.00 $43,367.00 $110,687.00 $70,960.00 $616,832.00 PETITION NO. GICO ADDITION PROPERTY OWNERSHIP Property Description Property Owner GIC0 Addition, Block i GICO, Inc. Lot 1 Lot 2 " LOt 3 " Lot 4 " GICO Addition, Block 2 GICO, Inc. Lot 1 " Lot 2 " Lot 3 " Lot 4 LOt 5 " Lot 6 " LOt 7 " Lot 8 " Lot 9 " Lot 10 " LOt 11 " LOt 12 " Lot 13 " Lot 14 " Lot 15 " Lot 16 " Lot 17 " Lot 18 " Lot 19 " Lot 20 " LOt 21 " LOt 22 " Lot 23 GICO Addition, Block 3 GICO, Inc. Lot 3 Lot 2 " LOt 3 " Lot 4 " Lot 5 " LOt 6 " Lot 7 Property Description Property Owner GICO Addition, Block 4 GICO, Inc. Lot 1 " Lot 2 " Lot 3 " Lot 4 " Lot 5 " Lot 6 " Lot 7 " Lot 8 " GICO Addition, Block 5 GICO, Inc. Lot 1 " Lot 2 " Lot 3 " Lot 4 " Lot 5 Lot 6 " Lot 7 " Lot 8 " Lot 9 " Lot 10 " Lot 11 " Lot 12 " LOt 13 " Lot 14 " LOt 15 " Lot 16 " Lot 17 " LOt 18 " LOt 19 " LOt 21 " GIC0 Addition City Park City of Salina 10 DO NO1' WRITE It~1 THIS SPACE PETITION NUHBER TO: THE GOVERNING BODY City of Salins, Konsss : (Al I~. the undersigned, being owners of record of property liable for assessment for the following I~provmnonts: ~;ee ]~xhtbit "A" hereby propose that such Improvement be made tn tho manner provided by Arttole h, Chapter 12 of the Kansas Statutes Anflotlted, ss amended, (B) The estimate or probable cost of su~ {~rov~nt fl Five Hundred Sixteen ~ousand Eight Hundred ~trcy ~o and 001100 Dollars. (S516,832.00) lC) The exteflg of the pr~sed i~rov~nt district to be assessed os {ndieited ~ t~ attached plat and Is described es fail.az ~o~s ~ through ~T ~lock 1, G~CO Addition; ~oCs I through 23, ~lock 2 G[CO Addition: ~oCs ,1 Chgou~h 7; Block 3~ G~CO Addition; ~oCs I Chgough 8, ~1oc~ ~, ~IC0 ~dd~r~on:- ~oc. I ChFou~h 21~ ~lock ~ G~CO Addition; City ~ack; all 1n G~CO Addition. (O) Tho proposed method of assessment Is.' shall be based on equal assessments for each lot of land and without re~ard to buildings or Improvements of the land. (E) The proposed apportionment of costs between the Improvement district 8nd tho City-at-large ts: * percent ( ~) to be assessed against the Jmprovmnt district and * percent ( ,, ~} to be assessed against tho City-at-largo. (Fl We further propose that such i~rovemeflt be Nde without notice and hearing sa required by K.S.A, 12-6s0~(1) es amended. * No nome may be withdrawn from this petition after the Governing Body eoemeflces consideration * of the petition or liter than seven (7) days after this petition his been filed with the City Clerk * (K.S.A. 12-6sOq) Respoetfully submitted by. Mr. James Copas Telephone Number 827-4502 Dm&Time ' Pmpmly owned within U~e * Apportionment of cost in the improvement district to be based upon project feasibility report and actual project costs due to existence of city-owned park in the benefit diGtrict. The curbing, ~uttering, grading, and paving of Faith Drive from the south line of McA~ams Road to the north line of Republic Avenue to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5, GICO Addition; City Park, all in GICO Addition. The curbing, ~uttering, grading, and paving of Courtney Drive from the north line of Republic Avenue to the south line of Lot 1, Block 4, GICO Addition to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; and Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, all in GICO Addition. The curbing, ~uttering, grading, and paving of Martin Avenue from the east line of Meyer Drive to the west line of Faith Drive to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, all in GICO Addition. The curbing, ~uttering, grading and paving of Kaci Court from the west line of Faith Drive to the cul-de-sac to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, all in GICO Addition. The curbing, ~uttering, grading and paving of Republic Avenue from the west line of Courtney Drive to the west line of Lot 1, Block 3, GICO Addition to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lots 1 through 8, Block 4; Lots 1 through 21, block 5; City Park; all in the GICO Addition. The installation of sanitary sewer main to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lot 1, Block 4; Lots 1, 13, ans 14, Block 5;and City Park; all in GICO Addition. The installation of water main to serve Lots 1 through 4, Block 1; Lots 1 through 23, Block 2; Lots 1 through 7, Block 3; Lot ~, Block 4; Lots 1, 13, and 14, Block 5; and City Park, all in GICO Addition. The installation of a storm drainage system to serve Lots 1 through 4, Block 1, GICO Addition; Lots 1 through 23, Block 2, GICO Addition; Lots 1 through 7, Block 3, GICO Addition; Lots 1 through 8, Block 4; Lots 1 through 21, Block 5; City Park, GICO Addition.