8.8 CO3 1994 Subdiv Impr CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 07/24/95 4:~ P.M. AGENDA SECTION: O~GINA~NG DEPARTMENT: APPROVED FOR NO. 8 Engineering & Utilities . AGENDA: ITEM: BY: Shawn O'Lear ,, BY ITEM Change Order No. 3 for the 1994 Subdivision Improvements, Project No. 94-907A. BACKGROUND This project involves street and drainage improvements in four different subdivisions. The project is approximately 80 percent complete. Change Order No. 3 involves two of the four areas, Forest Avenue located in Woodland/Jones Addition and the Southwestern Mobile Home Court located at the extension of Hageman Avenue in Nord/Wallerius Additions. On Forest Avenue, some'stormpipeline is being added to replace or enhance the existing and proposed drainage system. In Nord/Wallerius Additions, some minor items are being added for the relocation of the existing stormwater detention basin in the Southwestern Mobile Home Court. The amount of the change order is $15,017.00 or 3.2 percent of the original contract amount of $469,688.65. The total combined change order increase on this project is 11.5 percent, which is within the allowable 15 percent contingency amount. RECOMMENDATION It is recommended that the City Commission approve Change Order No. 3 in the amount of $15,017.00 .' COMMISSION ACTION MORON BY SECOND BY THA~ CHANGE ORDER LOCATION:TWIN OAKS,HOLIDAY RESORT,WALLERIUS, PROJECT NO. 94-907A WOODLAND/JONES PROJECT: 1994 SUBDIVISION IMPROVEMENTS,PHASE III CHANGE ORDER NO. THREE CONTRACTOR: J. H. SHEARS'SONS, INC., P. O. BOX 1095, SALINA, KS 67402 THIS AGREEMENT, made and entered into this 24th day of July , 1995, by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated September 19.1994, under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated August - 1994 , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. Item No. Description 8. Add 220 linear feet of 14" x 23" Reinforced Concrete Arch Pipe (RCAP) to replace or enhance the existing storm drainage system on Forest Avenue. 54. Add 131 linear feet of 10" storm pipeline for the discharge from the relocated stormwater detention basin in Southwestern Mobile Home Court (Hageman Avenue). 55. Add 1 lump sum for the removal and replacement of the existing gate val~e on the stormwater detention basin the Southwestern Mobile Home Court (Hageman Avenue). 56. Add 1 lump sum for the relocation of the intake structure on the stormwater detention basin in Southwestern Mobile Home Court (Hageman Avenue). 57. Add 1 lump sum for a concrete drainage flume in the stormwater detention basin in Southwestern Mobile Home Court (Hageman Avenue). 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices: CHANGE ORDER PAGE 2 ITEM UNIT NO. DESCRIPTION QUANTITY UNIT PRICE TOTAL 8 14" x 23" RCAP 200 L.F. $ 47.00 $10,740.00 54 10" Storm Pipeline 131 L.F. 17.00 2,227.00 55 Remove & Relocate Gate Valve 1 L.S. 250.00 250,00 56 Intake Structure 1 L.S. 1,200.00 1,200.00 57 Drainage Flume 1 L.S. 1,000.00 1,000.00 CNANGE ORDER TOTAL: $ 15,017.00 3. Additional time for completion by reason of this change 15 days. 4. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND PARTY THE CITY OF SALINA, KANSAS J. H. SHEARS SONS, INC. BY: BY- MAYOR (Office or position of signer) Attest: CITY CLERK