Loading...
CO 1 Arterial Street Sidewalk Imp CHANGE ORDER LOCATION: PROJECTNO. 06-1573 PROJECT: 2006 Arterial Street Sidewalk Improvements CHANGE ORDER NO._ One (1) Final CONTRACTOR: Davis Concrete Construction THIS AGREEMENT, made and entered into this 16TH day of November, 2006, by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated , under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for street improvements in the City of Salina, Kansas, dated , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. Item No. 1 2 3 4 Description Decrease Concrete Sidewalk 4" Decrease Type 1 Sidewalk Ramp Increase Type 3 Sidewalk Ramp Increase R&R Concrete Curb & Gutter Unit Quantity -167 S.F. -1 EA. 1 EA. 89 L.F. 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices. - 1 - CHANGE ORDER PAGE 2 Item No. Description 1 Decrease Concrete Sidewalk 4" 2 Decrease Type 1 Sidewalk Ramp 3 Increase Type 3 Sidewalk Ramp 4 Increase R&R Concrete Curb & Gutter Unit Quantity Unit Price Total -167 S.F. $ 2.65 $ -442.55 -1 EA. $ 490.00 $ -490.00 1 EA. $ 565.00 $ 565.00 89 L.F. $ 24.00 $ 2136.00 Total $ 1,768.45 3. The contract time for completion by reason of this change o days. 4. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND PARTY THE CITY OF SALINA, KANSAS DAVIS CONCRETE CONSTRUCTION BY: ~G ~ CIT MANAGER J BY: /I '.' f _..,f '] , I C/ I~'- ',t" ,"-'/1 1', ../ .. Attest: ~~ CITY CLERK '.,/ \ 7,1/' ...'" '~/,..... ~L (Office or position of signer) - 2 -