CO 1 Arterial Street Sidewalk Imp
CHANGE ORDER
LOCATION:
PROJECTNO. 06-1573
PROJECT: 2006 Arterial Street Sidewalk Improvements
CHANGE ORDER NO._ One (1) Final
CONTRACTOR: Davis Concrete Construction
THIS AGREEMENT, made and entered into this 16TH day of November, 2006, by and between the CITY OF
SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated
, under the above subject, project and project number in the following particulars to wit:
1. The specifications and drawings for street improvements in the City of Salina, Kansas, dated
, are hereby amended in the following particulars only; all other terms and conditions
remain unchanged.
Item
No.
1
2
3
4
Description
Decrease Concrete Sidewalk 4"
Decrease Type 1 Sidewalk Ramp
Increase Type 3 Sidewalk Ramp
Increase R&R Concrete Curb & Gutter
Unit
Quantity
-167 S.F.
-1 EA.
1 EA.
89 L.F.
2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete
the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings,
specifications, and contract documents, for the following prices.
- 1 -
CHANGE ORDER
PAGE 2
Item
No. Description
1 Decrease Concrete Sidewalk 4"
2 Decrease Type 1 Sidewalk Ramp
3 Increase Type 3 Sidewalk Ramp
4 Increase R&R Concrete Curb & Gutter
Unit
Quantity Unit Price Total
-167 S.F. $ 2.65 $ -442.55
-1 EA. $ 490.00 $ -490.00
1 EA. $ 565.00 $ 565.00
89 L.F. $ 24.00 $ 2136.00
Total $ 1,768.45
3. The contract time for completion by reason of this change
o
days.
4. All other terms and conditions of the contract to remain unchanged.
OWNER, FIRST PARTY
CONTRACTOR, SECOND PARTY
THE CITY OF SALINA, KANSAS
DAVIS CONCRETE CONSTRUCTION
BY: ~G ~
CIT MANAGER J
BY:
/I
'.'
f _..,f
']
, I
C/
I~'-
',t" ,"-'/1
1',
../ ..
Attest: ~~
CITY CLERK
'.,/ \ 7,1/'
...'" '~/,..... ~L
(Office or position of signer)
- 2 -