6.3 CO1 1994 Bldg DemolitionAGENDA SECTION: NO. 6 ITEM NO. 3 CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE 04/17/95 ORIGINATING DEPARTMENT: Engineering & Utilities BY: Shawn O'Lear~ TIME 4:00 P.M. APPROVED FOR AGENDA: ITEM Change Order No. 1 for the 1994 Building Demolition, Project No. 94-917. BACKGROUND This project involves the demolition of one house, one garage and one commercial building at three different locations which were all part of the 1994 Dangerous Structures Project. Change Order No. i includes an addition of $1,623.82 for the removal and disposal of some contaminated soil material found at the 501-503 S. loth Street site, a.k.a. Ideal Cleaners commercial building. The site clean-up work was done in cooperation with the Kansas Department of Health and Environment. The original contract amount is $14,950. This change order increases the contract by $1,623.82 or 10.9 percent. All costs for this project are paid by special assessment to the properties in question. RECOMMENDATION It is recommended that the City Commission approve Change Order No. i on the 1994 Building Demolition, Project No. 94-917, in the amount of $1,623.82. MOTION BY COMMISSION ACTION SECOND BY THAT: CHANGE ORDER LOCATION: PROJECT: CONTRACTOR: 1994 Structure Demolition Bob Smith Salvage, Inc. PROJECT NO.: 94-917 CHANGE ORDER NO.: 1 THIS AGREEMENT, made and entered into this 17th day of April , 199--5, by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated December 12, 1994 under the above subject, project and project number in the following parti- culars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated November - 1994, are hereby amended in the following particulars only; all other terms and conditions remain unchanged. Item No. 1 Description Add 1 lump sum for the removal and disposal of contaminated soil material at the site located at 501-503 South 10th, previously Ideal Cleaners. 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices. CHANGE ORDER PAGE 2 ITEM UNIT NO. DESCRIPTION QUANTITY UNIT PRICE 1 Site Clean-Up 1 L.S. $1,623.82 TOTAL $1,623.82 CHANGE ORDER TOTAL: $1,623.82 3. Additional time for completion by reason of this change 15 days. 4. Ail other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY THE CITY OF SALINA, KANSAS CONTRACTOR, SECOND PARTY BY: ~- BY: MAYOR (Office or position of signer) Attest: CITY CLERK