Loading...
6.6 Appr Eastgate Drainage < CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 4/3/95 4:~ P.M. AGENDA SECTION: ORIGINA~NG DEPARTMENT: APPROVED FOR' NO. 6 AGENDA: Engineering rr~M: NO. 6 BY: Shawn0'Leary BY: Item Approval of the Eastgate Addition Drainage Improvements, Project No. 95-937. Background This project involves modifications and improvements to the existing Eastgate Addition drainage system. As You know, This project has been discussed since the flooding problems encountered in 1993. The improvements have been designed and ready for construction bid letting, since September, 1994. However, the drainage easement necessary for the new channel was just acquired by the City with the platting of GICO Addition. The project may now move forward. The improvements include increasing the capacity of the existing detention basin, improving the pump operation in that basin and construction of a new channel from Eastgate north to the levee outfall structure. These improvements are designed to signifi- cantly reduce the flooding of the streets and ditches in the average storm events. This project was carried over from the 1994 budget in the Capital Improvement Program category. The source of funds for the project is the General Fund. RECOMMENDATION It is recommended that the City Commission approve the Eastgate Addition Drainage Improvements, Project No. 95-937, and authorize staff to set a date to receive bids. COMMISSION ACTION MORON BY SECOND BY THAT: