Loading...
6.2 Appr Cell 2 Constr CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME March 27 1995 4:00 P.M. ! , AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR NO. 6 AGENDA: ' General Services ITEM: BY k R. Weinhold BY: Item,' Set a date to receive bids for Solid Waste Landfill Cell ii2 Construction and Closure of the Existin$ Landfill. Backaround: Cell #2 is now required so Cell #1 can continue to be developed vertiCa'lly, The top of the proposed cells are 40 feet above the existint ground. The slope or rise be$ins on the east side of Cell itl and reaches 40 feet to the west side. However, Cell #2 to the west of Cell #1 must also rise to prevent a · cliff or a vertical bank. The life of Cell #2 is estimated to be 2 1/2 years. The material removed to build Cell #2 will be used for the closure of the existing landfill. The City Staff has worked very closely with the Kansas Department of Health end Environment (KDH&E) with the overall plan for the landfill. The closure of the existing landfill site will put the landfill in full compliance with the Subtitle D regulations. There will still be 30 years of monitoring the existing landfill. This will not place a burden on the staff, since the new cells will be surroundin$ the existing site over the next sixty years. Money to construct the new cell and closure of the existing will come from the fee supported Solid Waste fund and bonds. Recommendation ~ It is recommended May 2, 1995 be set as the date to receive bids for the Solid Waste Landfill Cell #2 Construction and Closure of the Existing Landfill. COMMISSION ACTION MOTION BY SECOND BY THAT: