Project Design
~,
.:.551
SYSTEM SOLUTION$, INC.
1106 E. 27th
Hays. Kansas
(913) 625-7070
CITY OF SALINA PROJECT DESIGN
12/02/93
ITEM ONE: Research and recommend topology for WAN as present.ed by
Dave Larrick 11/16/93.
This to include the remote locations, ie City Police, and
Bicentennial Center, Central Garage, Water dept. and all
other existing locations.
ITEM TWO: Research and recommend network management software from a
top down perspective, AS/400 thru WAN.
ITEM THREE: Design and recommend backup and recovery software and
strategy for the WAN using existing information.
ITEM FOUR: Design and recommend path to pllt AS/400 in City Police,
mirrored back to primary system with the understanding that
the scope of this work is to be confined to developing a
plan for a future installation that will not degrade the
existing design and implementation.
System Solutions inc. will do the above work and provide a document
detailing the design and recommendations to Dave Larrick. SSI will meet
with Dave Larrick and associates, present and explain the design and
the recommendations. We, 5S1, will at that point be available for any
implementation work that ad ses from this project.
The above design work will be done for the price of $4,500.00
The signing of this letter will constitute a contract between the
City of Salina And System Solutions inc.
//)
.. ..iL~::1-_L1i&~-
Dave Larrick
Dennis M. Weese
__-i.)Zc.f./qi__
date