Loading...
6.5 Appr Well House Rehab CITY OF SALINA REQUESTFORCOMMISSIONACTION DATE ~ME 01/09/94 4:~M. AGENDA SECTION: ORIGINA~NG DEPARTMENT: APPROVED FOR' NO. 6 AGENDA: Engineering & Utilities BY: Don Hoff · BY: Item Approval of the Well House Rehabilitation Project No. 93-887 and authorize the setting of a date to receive bids. Background In order to insure the structural integrity of fourteen (14) of the City's well houses, it is necessary to renovate these units. A well house contains a raw water pump and motor; electrical switch gear; telemetry controls; water meter; etc. Most of these brick structures need external improvements to extend their useful life and enhance their external appearance. This project consists of renovation of the following major items on a majority of the well houses: (a) Roofs, flashings and downspouts (b) Doors and windows (c) Masonry and wall copings (d) Roof hatches and towers (e) Painted metal surfaces Three of the well houses will be demolished and reconstructed. It is not economically feasible to rehabilitate these structures. Appleby and Marsh Architects prepared the construction documents and will perform the necessary construction administration services. RECOMMENDATION It is recommended the City Commission approve the Well House Rehabilitation Project No. 93-887, and authorize the Engineering Department to set a date to receive bids. COMMISSION ACTION MORON BY SECOND BY THAT: