Loading...
Liberty Add Line Lowering ~-=- ..=: =- ~~ --::. .: KANSAS GAS SERVICE A DIVISION OF ONEOK City of Salina 300 West Ash Street Salina, Kansas 67401 Attn: Bradley Johnson October 25, 2005 Re: LETTER OF AGREEMENT - LIBERTY ADDITION LINE LOWERING Dear Mr. Johnson, In accordance with discussions between yourself and representatives of Kansas Gas Service, we have prepared the following letter of agreement regarding the lowering of our 12-inch natural gas transmission pipeline through the proposed Liberty Addition in Salina, Kansas. AGREEMENT I. The Kansas Gas Service Company (KGS) will lower our 12-inch natural gas pipeline through the Liberty Addition area to eliminate any conflict with the storm drainage ditch and sanitary sewer lines planned for this area. Elevations are based on preliminary profile drawings provided by Wilson & Company dated 12-3-04. Lowering work will be completed as soon as practical and is currently planned to start in mid-November, 2005. 2. The City of Salina will provide an on-site inspector during the line lowering work to ensure that final elevations ofthe pipe are acceptable. 3. The City of Salina will ensure that stakes are placed at the location of the proposed storm drainage ditch and sanitary sewer line crossings. 4. KGS has estimated the total cost of this work to be $139,726. Final billing will be based on actual costs of the lowering work. Costs for flowable fill or any other special construction requirements are not included in this estimated cost and would be extra if required. 5. The City of Salina will submit payment for 50% of the estimated cost prior to KGS beginning work. Final payment will be due 30 days after receipt of the final invoice. Payment should be made to Kansas Gas Service and submitted to 110 W. 2nd, Hutchinson, Kansas 67501, Attention Lynn Crouse. /ì /l ~ \,-~ '-1/ '/ ./ City of Ina I 110 West 2nd Hutchinson, Kansas 67501 If...f-f)Ç Date Jlh~!tJS' ~