8.5 CO5 Subdiv CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 6/3/96 4:00 P.M. AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR NO. 8 Engineering & Utilities AGENDA: ITEM NO. 5 BY: Shawn O'Leary BY: ITEM: Change Order No. Five (5) on the 1995 Subdivision Improvements, Project No. 95-938. BACKGROUND; The attached change order modifies the contract with Stevens Contractors approved by the City Commission on October 9, 1995 for subdivision improvements at eight new or existing subdivisions throughout the city. The change order includes some minor storm drainage improvements on Seitz Drive near Melrose Lane. These improvements will attempt to resolve some storm drainage system problems identified in recent years by area property owners. This work is being proposed by change order because the current contract already includes nearby street and drainage improvements on Seitz Drive as well as Eastborough Road. The cost of'this change order is $19,652. The original contract amount for Project No. 95-938 was $1,264,525. The total of'the other £our change orders is $282,610. I£this change order is approved, the new contract amount will be $1,566,787. The city at-large share of' this contract, with the exception of'the new park assessments in GICO Addition is $280,000. The majority of'those costs are associated with water and sanitary sewer system improvements. All of' the proposed Change Order No. 5 costs of'$19,652 will be paid from the general ~und. RECOMMENDATION; It is recommended that the City Commission approve Change Order No. Five (5) on the 1995 Subdivision Improvements, Project No. 95-93 g, in the amount of' $ l 9,659_. CHANGE ORDER LOCATION: SEITZ DRIVE AND MELROSE LANE PROJECT NO. 95-938 PROJECT: 1995 SUBDIVISION IMPROVEMENTS CHANGE ORDER N0.~ CONTRACTOR: STEVEN~ CONTRACTORS.INC.~ P.O. BOX 6197. SALINA. KS.67402 THIS AGREEMENT, made and entered into this ~ day of June , 1996, by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated October 9.19950 under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated September 1995 , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. (a) The scope of the Change Order No. 5 involves an improvement of existing storm drainage system on Seitz Drive directly north of Melrose Lane. In recent years, heavy storms have exceeded the capacity of the existing storm drainage system at this location. (b) This work is being done by change order to this project because the project already includes nearby street and drainage improvements. 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices. CHANGE ORDER PAGE 2 ITEM UNIT NO, DESCRIPTION QUANTITY UNIT PRICE TOTAL 57 Special Trench Compaction 33 L.F.$ 7.005 231.00 64 Staking 1 L.S. 500.00 500.00 86 Remove & Replace Concrete Pvmt 18 S.Y. 40.00 720.00 87 Remove Existing Inlet 2 EA. 500.00 ~,O00.00 88 Remove Existing 24" RCP 33 L.F. 5.00 ~65.00 89 Construct Concrete Headwell 1 L.S. 1.500,00 1.500.00 90 Storm Inlet, Type A5-4 1 EA. 4.400.00 4~400.00 91 Special Storm Inlet, Type A5-2 1 EA. 3.100.00 3,100.00 92 Storm Pipeline, 30" RCP 223 L.F. 32.00 7.136.00 93 Pipe Bend,30 Degree, 30" RCP 1 EA. 450.00 450.00 94 Pipe Bend,45 Degree, 30" RCP 1 EA. 450.00 450.00 CHANGE ORDER TOTAL: $ 19,652.00 3. Additional time for completion by reason of this change 30 days. 4. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND PARTY THE CITY OF SALINA, KANSAS STEVENS CONTRACTORS, INC. BY: BY: MAYOR (Office or position of signer) Attest: CITY CLERK