Loading...
Agr Insp Lakewood Ped Bridge .t~ 'P(bj.eLt 0 {- ( :3 ól~ 85 TE-0210-01 TEA- T021 (00 1) TRANSPORTATION ENHANCEMENT PROJECT LAKEWOOD PARK HISTORIC TRUSS BRIDGE-RELOCATION AND REHABILITATION CITY OF SALINA, KANSAS CONTRACT FOR ARCHITECTURAL/ENGINEERING SERVICES (COST PLUS NET FEE AGREEMENT) SUPPLEMENTAL AGREEMENT TillS AGREEMENT entered into this ~day of~ ,2005, by and between the City of Salina, Kansas hereinafter referred to as the "City", as principal, and the architectural/engineering finn of Olsson Associates, with principal offices located at 1111 Lincoln Mall, Lincoln, Nebraska, hereinafter called the "Consultant". WITNESSETH: WHEREAS, the City and the Consultant entered into an Agreement dated January 3, 2005, hereinafter referred to as "Original Construction Administration Agreement" for the purpose of setting the City's and Consultant's responsibilities in relationship to the project and to describe the funding arrangement for the project. WHEREAS, the City has corresponded in an email dated October 24, 2005 stating that the contract for Construction Administration cost amount will need to be increased. The amount of increase is $10,000.34, increasing the total Construction Administration compensation from $29,241.94 to $39,242.28. This increase in compensation is justified by an increase in inspections due to the unforeseen, lengthy lead paint removal process. NOW, THEREFORE, in consideration of this premise, the Parties hereto agree to null and void the previous Construction Administration Supporting Data Sheet (Attachments, "1") and add to the Original Construction Administration Agreement, "Attachment "1 a" (see attached) and in addition, Page 2, ARTICLE I, Item #4, (b) and (c) shall read as follows: b. Compensation shall be made on the basis of the Consultant's actual cost, overhead rate and direct expenses, with a net fee in the amount of $3,478.47. c. Total compensation for this agreement shall not exceed $39,242.28. THAT THIS SUPPLEMENTAL AGREEMENT, shall not be construed to alter, modify, or void the tenns, provisions, or conditions of the Original Construction Administration Agreement, incorporated herein by reference, except as herein specifically provided. \- IN WITNESS WHEREOF the parties hereto have caused this Supplemental Agreement to be signed by their duly authorized officers on the day and year first written above. ATTEST: ~d~~ Mayor OLSSON ASSOCIATES BY: AfJ ~1- 1¡4, j ~C ¡- Title /?Ju 'tt e¡: 7 '(! y .1 . . " Attachment #la SUPPORTING DATA SHEET FOR ESTIMATE OF ENGINEERING FEES Construction Administration 85 TE-021 0-01 TEA T021(001) lakewood Park Historic Truss Bridge-Relocation and Rehabilitation City of Salina, KS (I) DIRECT PAYROll POSITION TITLE RATE EST HOURS AMOUNT TOTAL (SUBTOTAL) Project Manager $39.23 40 $ 1,569.20 Senior Technician 16.50 400 6,600.00 Project Engineer 20.30 40 812.00 Field Inspector 16.00 60 960.00 Plant Inspector 15.30 45 688.50 Secretary 15.75 17 267.75 SUBTOTAL(I) $10,897.45 (II) GENERAL AND ADMINISTRATIVE OVERHEAD 166 %) X SUBTOTAL (I) $18,089.77 (III) SUBTOTAL (Sum of I and II) I $28,987.22 (IV) NET FEE $3,4 78.4 7 (V) DIRECT EXPENSES (TRAVEL, MATERIALS, RATE DAYS/MILES/ AMOUNT POSTAGE AND CONSULTANTS OTHER Travel Auto Rental $ 60.00 4 $ 240.00 Construction Inspector Mileage .38 15,070 5,726.60 Telephone 150.00 1 150.00 Motel 70.00 8 560.00 Construction Photos and Processing 50.00 2 100.00 SUBTOTAL(V) $6,776.60 (VI) COST (TOTAL FOR JOB ITEMS III+IV+V) i ¡ $39,242.28 I