CO 1 Sidewalk Imp-Pioneer Pl
"
CHANGE ORDER
LOCATION:
7th & Mulberry
PROJECT NO. 05-1548
PROJECT: Pioneer Presidents Place
CHANGE ORDER NO. One (1)
CONTRACTOR: Frank Construction. P.O. Box 47. Salina. KS 67401
THIS AGREEMENT, made and entered into this
3rd
day of November
2005
,by
and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing
contract dated
October 24th. 2005
, under the above subject, project and project number in the
following particulars to wit:
1. The specifications and drawings for certain street improvements in the City of Salina, Kansas,
, dated , are hereby amended in the following particulars only; all other terms and conditions
remain unchanged.
ITEM NO.
DESCRIPTION
3
Increase 5' X 4' Sidewalk
2,800 S.F.
2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete
the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings,
specifications, and contract documents, for the following prices.
-1-
J
~
CHANGE ORDER
PAGE 2
ITEM NO.
DESCRIPTION
QUANTITY
UNIT
3
5' X 4' Sidewalk
2,800
S.F.
Total:
3. The contract time for completion by reason of this change
0
days.
, 4. All other terms and conditions of the contract to remain unchanged.
OWNER, FIRST PARTY
UNIT
PRICE
$5.00
CONTRACTOR, SECOND PARTY
THE CITY OF SALINA, KANSAS
FRANK CONSTRUCTION
B~ti
9f'Q~. ~
(Office or position of signer)
- I}Y: Û Q \I\Ao-
ylU- MAYOR
Attest: ~~
CITY CLERK
-2-
TOTAL
$14,000.00
$14,000.00