Loading...
4038 Watermain Homquiest Estate DO !Wr'oRITE III IHIS SPACE PETlrlOtI IIUHBER I/o3g FILED FILED , 92 rmv 29 Ar\ 9 30 '92 ¡rmv 29 API 9 30 TO: THE COIIERIII II::; ß".0'f City of Salina, Kansas CI fY vI' SALINA. KS CITY CLERK'S OFFICE el I( Of SAliNA, KS CITY CLERK'S OFFICE :.,.......,."....."""""""""""'" (AI We, the under&lgned, being ""non of record of property liable for a$$e$$ment for the fol1o"tog improve..cnt&: The installation of 6-inch water omln including fittJngs, fire hydrants, valves, channel crossings and special trench compaction in the Holmquist Estates Planned nevelopme~t District. hereby propo&e that &uch I..provemont be ..ado In the manner pruvldod by Article 6a, Chapter 12 of the Kansu Statute& Annotated, as atnended. (13) The e&timate or probable CO&t of such Improvement Is Hunilrpil Ninety Five and 00/100 Dollars One Hundred Twenty Five Thousand !>Ix IS 12').69').00 (C) The extent of the propo&ed improvement district to be a"e"ed u Indicated on the attached plat and h åe&crlbeo as folio"&: Lots 1. 2. 3. 4. 6. 7. 8. 9. 10. 11. 12. 13. 14. 1'). 16. 17. 18. 19 and 20. Holmquist Estates Planned Development District to the Citv of Salina. Kansas (D) The propo&ed method of assessment h: Based on the total project cost divided equally among the nineteen (19) property tracts in the benefit district without regard to buildings or improvement of land. (E) The proposed apportionment of CO&t& bet"eon the Improvement dhtrict and the City-at-Iarge is: 100 percent (~'\) to be aue$$ed again&t tho Improvement dist';.i ct and -0- percent (---=.9..::..-'\) to be useued a9ain&t the City-at-large. (F) We further propose that such improvement be made "ithout notice and hearing as required by K.S.A. 12-6.0Hl) as amended. - -----, J J J J J"""'" HHHH J J' ........ HHH' Ai"""" U UUu........ ...... "UH"""" .HHHU'" u"" * No n.me may be "ithdn"n frOB this petition after the Coverning Body comences consideration * * of the petition or later than seven (7) days after thh petition has been filed "ith the City Clerk * * (KoS.A. 12-6aO4) * J' J'" H HHU'" J' J J'....u. HH J.... J"""" HH' /. ï......... 'U7J H J J" J' J...... UU J"'"""", Respectful1y submitted by ~:...~-<. F /£4 / ";-;;£0/0 "',~L"""A / / / Telephone Number '. ¿ Za -\./ ~ Residence Date & lime of Signing Property onoeO \lithin the proposed Improvement Di std ct 14 ~<"d ÇóJ- ~ '5Þ1 ¡c,L . kJ 't ~rOì /, - . ~', .' '¡ 1 17 Ked f~K.. ¿"~ ,S-ci !,';þ" I J: r sj.l7J'ì2. /...r.f /7 \~e ilL it 11.. Wòx: lw>- '5/27/17..- kðt IL PET! 11 ON Signature Residence Daté & TIme Property owned wfthfn the of Sfgnfng proposed Improvement District jLr~ ~-Ix:.1> -# !J(If(} ;ðJc {,./jl!: -;1<; J / 1f'(¡+;E'i) hý /t-~di' S-Þ't ~...fM j/?/ :J¡ ~ bf If loT c¡ ~,¿ ~.r 71!J.¿)J~~ ~. .ð?-~7 ~/./1 6tll ° i PRELIMINARY ENGINEERING ESTIMATE AND FEASIBILITY REPORT PETITION NO. PROPOSED UTILITY IMPROVEMENT HOLMQUIST ESTATES PLANNED DEVELOPMENT DISTRICT TO THE CITY OF SALINA, KANSAS FILE NO. 92-2 MAY - 1992 DON HOFF, DIRECTOR OF ENG. & UTILITIES qA-#1.561 PETITION NO. SCOPE OF WORK The installation of 6-inch water main including fittings, fire hydrants, valves, channel crossing and special trench compaction. BENEFIT DISTRICT Lots 1, 2, 3, 4, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19 and 20, Holmquist Estates Planned Development District to the City of Salina, Kansas. ADOPTION OF ASSESSMENT The assessment with accrued interest to be levied as a special assessment tax upon the property included within the benefit district concurrent with the general property tax and shall be in ten (10) equal annual installments. The method of assessment shall be based on the total project cost divided equally among the nineteen (19) property tracts in the benefit district without regard to buildings or improvement of land. APPORTIONMENT OF COST COST CHARGEABLE TO PRIVATE PROPERTY: 1. 100% of the total cost of utility improvements. COST CHARGEABLE TO CITY: 1. No cost to City. • PETITION NO. UTILITY IMPROVEMENTS HOLMOUIST ESTATE PLANNED DEVELOPMENT DISTRICT PRELIMINARY CONSTRUCTION ESTIMATE Total Costs 1. WATERMAIN, 6" 5,900 L.F. @ $ 12.00 = $ 70,800.00 2. C. I. FITTINGS 3 TONS @ 3,000.00 = 9,000.00 3. FIRE HYDRANTS 10 EA. @ 1, 700.00 = 17,000.00 4. GATE VALVE, 6". 4 EA. @ 500.00 = 2,000.00 5. CHANNEL CROSSING 1 L.S. @ 5,000.00 = 5,000.00 6. SPECIAL TRENCH COMPACTION 400 L.F. @ 5.00 = 2,000.00 7. GRAVEL SURFACING 100 TON @ 20.00 = 2,000.00 8. WATER 1 L.S. @ 1,500.00 = 1,500.00 SUB TOTAL: $109,300.00 15% ENGINEERING & CONTINGENCIES: $ 16,395.00 TOTAL PROJECT COST: $125,695.00 PETITION NO. DISTRIBUTION OF COST TO PROPERTY OWNER HOLMQUIST ESTATES PDD EACH 6" WATER MAIN TOTAL Lot 1 1 $6,615.53 $6,615.53 Lot 2 1 6,615.53 6,615.53 N Lot 3 1 6,615.53 6,615.53 Lot 4 1 6,615.53 6,615.53 Lot 6 1 6,615.53 6,615.53 Lot 7 1 6,615.53 6,615.53 Lot 8 1 6,615.53 6,615.53 Lot 9 1 6,615.53 6,615.53 Lot 10 1 6,615.53 6,615.53 Lot 11 1 6,615.53 6,615.53 Lot 12 1 6,615.53 6,615.53 Lot 13 1 6,615.53 6,615.53 Lot 14 1 6,615.52 6,615.52 Lot 15 1 6,615.52 6,615.52 Lot 16 1 6,615.52 6,615.52 Lot 17 1 6,615.52 6,615.52 Lot 18 1 6,615.52 6,615.52 Lot 19 1 6,615.52 6,615.52 Lot 20 1 6,615.52 6,615.52 TOTAL: $125,695.00 $125,695.00 r• . -: , . , - • 1 / .. . '1• t-.: _ _ .._::__7'.s'i...::,:4 1_---._ 3 3,i :3 7 3. 3 2 2 .. - - ':3 ''' ';I !\, NJ, 915 'R cni \-t. \ -7_4 \ -• .q.0,:-0 i 4,,....s- - ; z7' 1 tat, 31 , (--: -‘r ,:. 1". 1\1,•--' ciz.,..-'`,„/ .! ,,,-3 .,--,.. - 6, .,' z.- 1-•,/ - (Ai ir- ., ' ru L.i • ..,--i-,,, , . ---1 I.4 NA _ _ = (10 ': ‘,..‘ 01 ./ 4, r\.) \ ..t, ,- , 1.3, _ .;1;< ''',1 '''''...% ,c-'......„ ',2) >1 ,-.. I M> ' "' - ° ' ' L',11-r1 bi i 'I ,--,-._.{-:1•-:: 7 \ ------7 I /2.,.0i. ;;; ca.-Z--. rt.=C I' - -.- ••--.- i rP Li \ \• ; "Z••••'," •-7--1 i _ 011-11--"IlMi* - • 0 -• a \ \% _ 1 .,. i U 2 ------e.14441 . I y. . • 5- \ \.• N a CO cn 1 ,. \ • -' / -•- ../ ' ' „,,- t.,______________ -410. ,i .. i q rn I I ■ 1-^ I— \ \i 1829 1922 18;6 1 .-7 ‘r- \ BRIARWOOD ' ..•../ ,....,,.., 41". , N i ...e' '<:.. A■I z'i * 30 Ut:iity Eusemen; -,-.,.,\ \- i47.3. ,11 HE. ,1,, '''''. "' - ..'-` 174•W ' ,• `4 _ .1. > •(.0 ...\//do,/ /* ,.,..,...,-,-, •-\ 17 ,1; ' - /.?..,, •;,,.- 4 - • . di ,„),e 0 ,, ,-L, co t r-.) -si:7•• = / _ ,,,,: ;• / N\ . / liklik 1 I I .\'Z2 (0 , 1 Ul 12.• \ ! •• !!!.9..:. ,. \ 1 1 1 1 ij* I 8-i ','"'"''!".j(‘-s'li I !"-■4'1'.(,''''.re 't SP-. IT: C) 1° P.. .'..ia ---7 --,•7•-7.-11---- ———---——— s \ \ I±' I. •0 -I-• -4 I su ----r-gi :1--—— — — —— ——--————--—— -- —a. . V____ . a "1 350 I 512.01' 1?9- _ us:114111 0C..., \I \:11/r7\0104\ j 5* Ut ilitY E 3 IT'' !iii M I■-;__ ____— itt,1!,...0:51 Lirz:_ I N 61_nl -„, ..1_,Q, I -- lig. 0 , 1., I z .„, 0 ...... 10'71): ''..-.'''s'4" ---:--- ,26. „ r ,.,\ 12 . `1' 923" Crl co 0 . . .4.. - /?. 182 7 152! 181. Z4 — • 1 /-E Or u-3 -5.5t s, _! a 1 z 7 „›. :311 io, ,,,11 cn 01 ..; e t9s I it \a.,,_ .----------: 10 Utility Esmt. -- --- 11\ Z4 _ o '83, '-'°1 1 /sr Enna = BENEFIT cr. \-L' 275' I I -71 1 nu DISTRICT • . ,40. . /:"' : I '1 it . g i x is ;40 cr) -I on N.' a > —4 . LW ,.: N, u, M ci) M : , . • „II 5 . 0 34 3.9 o• Aw 4 c. 375' < r oa EP. m WI • Z P J a m . 390' Ill .-------- c., _ 01 \ IS ..-- -- 1, Ill 1 ..,6, N ” U — \ 11`-. ' \ e \ . : to 4 B\ Its \ 3 . N • l‘‘Ic's. r' ') .1''/- ''''' I 1 , X N X N 1 1 . 7:. 1:=1: -': ',.. \ ..,....... I-13 J.4,. VfoS . i 1 227.2E . . . . . _:., ...:-. - .._ ...f.',. =s4-.f. . ' 0' 00 0 2 ' 0091 — - i .. . . . .._ -— . •• — DO NOT WRITE IN THIS SPACE • . PETITION NUMBER • • • TO: THE GOVERNING BODY City of Salina, Kansas • (A) We, the undersigned, being owners of record of property liable for assessment for the following improvements: . The installation of 6—inch water main including fittings, fire hydrants, valves, channel crossings and special trench compaction in the Holmquist Estates Planned Development District. • hereby propose that such improvement be made in the manner provided by Article 6a, Chapter 12 of the Kansas Statutes Annotated, as amended. (B) The estimate or probable cost of such improvement is One Hundred Twenty Five Thousand Six Hundred Ninety Five and 00/100 Dollars (S 125,695.00 (C) The extent of the proposed improvement district to be assessed as indicated on the attached plat and is described as follows: Lots 1, 2, 3, 4, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19 and 20, Holmquist Estates Planned Development District to the City of Salina, Kansas • (D) The proposed method of assessment is: Based on the total project ,cost divided equally among the nineteen (19) property tracts in the benefit district without regard to buildings or improvement of land. (E) The proposed apportionment of costs between the improvement district and the City-at-large is: 100 percent ( 100 %) to be assessed against the improvement district and -0- percent ( -0- %) to be assessed against the City-at-large. (F) We further propose that such improvement be made without notice-and hearing as required by K.S.A. 12-6a04(1) as amended. * No name may be withdrawn from this petition after the Governing Body commences consideration * * of the petition or later than seven (7) days after this petition has been filed with the City Clerk * * (K.S.A. l2-6a04) Respectfully submitted by Telephone Number Date & Time Property owned within the Signature Residence of Signing . proposed Improvement District • • • •